Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

CMR for the Renovations of the Restrooms and Breakrooms at a State Office Building

Open
0010246State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Texas Facilities Commission is seeking a Construction Manager-at-Risk (CMR) to perform comprehensive renovation services for the restrooms and breakrooms on floors 1-12 and 14 of the William P. Clements State Office Building in Austin, Texas. The project scope includes upgrading sanitary sewer lines, adding new restrooms, and renovating existing breakrooms. The CMR will provide full-lifecycle services divided into two primary phases: a pre-construction phase focused on value engineering, constructability reviews, and the establishment of a Guaranteed Maximum Price (GMP), and a construction phase involving the management of competitive subcontractor solicitation and the installation of all necessary labor and materials. The pre-construction period is estimated at 180 calendar days, with the construction phase projected to last 365 calendar days. This procurement follows a two-step award process. Step one evaluates respondents on experience, qualifications, methodology, and safety records, while step two involves pricing proposals from the top five or fewer ranked firms. Award is based on the best value to the state. The selected CMR must comply with various regulatory standards, including the Americans with Disabilities Act, OSHA safety requirements, and Texas Government Code regarding iron and steel products. Key contractual obligations include providing performance and payment bonds, maintaining a project-specific quality control plan, and adhering to prevailing wage rates. Asbestos abatement is explicitly excluded from the construction contract and budget.

General Info

Texas Facilities Commission seeks a CMR for restroom and breakroom renovations in Austin.

Agency

Texas Facilities Commission

Place of Performance

TX, USA

Set-Aside

NONE

Documents

7
DOCX, High priority: read this firstpast-performance
High
DOCX, High priority: read this firstproposal-form
High
PDF, High priority: read this first114 pages · contract-document
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this first18 pages · rfq
High
PDF, High priority: read this first7 pages · supporting-document
High
PDF, High priority: read this first115 pages · specifications
High

Read all 7 documents

Due in 28 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 28 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 7 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas Facilities Commission
Contacts1 person available
OfficeTX, USA
Organization / Agency
Texas Facilities Commission
Office AddressTX, USA

Full Description

Show more
SCOPE:In accordance with the provisions of Texas Government Code, Chapter 2269, Subchapter F, Construction Manager-at-Risk Method, and Rules and Procedures adopted by the Texas Facilities Commission (TFC), TFC is requesting qualifications for a Construction Manager-at-Risk (CMR) to perform renovation services to the restrooms and breakrooms at the William P. Clements State Office Building, floors 1-12 and 14 located at 300 W 15th Street, Austin, Texas 78701 hereinafter described as TFC Project #26-005-4203 (the Project). This Project will be administered by TFC. This procurement will be a two-step award process with a two-part work requirement.a)Step One of the solicitation will include a submittal of company experience and qualifications focusing on projects of similar size and type. Respondents will be evaluated on experience and qualifications, as detailed in Section V, Submission Requirements.b)Step Two of the solicitation will include only the highest ranked five or fewer Respondents from Step One who will be asked to provide pricing.SECTION II - PROJECTDESCRIPTION PROJECT DESCRIPTION: The project consists of renovations of the existing restrooms, adding additional restrooms, and renovations of the existing breakrooms on floors 1-12 and 14. The renovations will include upgrading the existing sanitary sewer lines on floors 1-12 and 14. The project is located within the William P. Clements State Office Building located at 300 W 15th St., Austin Texas.ASBESTOS ABATEMENT: For the consideration of this RFQ, TFC is assessing any known asbestos materials in the existing facility to be abated prior to demolition and construction. Any asbestos abatement of the building is to be considered outside of the construction contract and budget of this RFQ.THIRD PARTY TESTING: TFC shall provide or contract with third party for Testing and Balancing Services, RAS Review, Commissioning (BECx and CxA), and Construction Materials Testing. SECTION III - SCOPE OF WORK SERVICES: CMR services shall be comprehensive in nature and will include but not be limited to: pre-construction services, estimation services, participation in constructability reviews, development/management of complex critical path schedules and bidding multiple packages as necessary to execute the project scope of work. The number of bid packages and Guaranteed Maximum Price amendments to be determined by TFC in cooperation with the A/E and CMRPART ONE: Collaborate with TFC and its Architect and Engineer Firm (A/E) and third-party consultants, and stakeholders during the completion of construction documents including review and comments at each negotiated milestone prior to completion of Construction Documents. The Respondent’s expertise will be used to affect value engineering, establish a project schedule and ultimately determine the GMP. The services include attending meetings, consultation of plan reviews, constructability reviews, and cost estimating. Provide CMR services from pre-design through construction close-out, as described in Attachment G – CMR Contract Template.PART TWO: In accordance with the approved schedule and GMP, the Contractor is responsible for managing the competitive solicitation process for subcontractors and helping the owner/client select those subcontractors, while complying with all VetHUB requirements and provide and/or secure and install all materials, labor, coordination, management and supervisory activities necessary to complete construction of the Project in accordance with the drawings, specifications and other contract documents that will be prepared by the A/E & TFC.SUBCONTRACTORS: Subcontractors providing services shall meet the same requirements and level of experience as required of the Respondent. No subcontract shall relieve the primary Respondent of responsibility for the service. If the Respondent uses a subcontractor for any or all of the work required, the following conditions shall apply under the listed circumstances:a) Respondents planning to subcontract all or a portion of the work shall identify the proposed subcontractors on the Attachment B – Subcontracting Plan Forms.b) Subcontracting shall be at the Respondent’s expense.c) TFC retains the right to check a subcontractor’s background and make a determination to approve or reject the use of submitted subcontractors.d) The Respondent shall be the only contact for TFC and subcontractors. Respondent shall list a designated point of contact for all TFC and subcontractor inquiries.SATISFACTORY UNDERSTANDING: Respondents will be held to have satisfactory understanding regarding all existing conditions and to have included in the proposal an amount sufficient to cover all work including permits, fees, etc.CONTRACT TERM: Construction is required tocommence within five (5) calendar days after the Notice to Proceed forConstruction is issued. For planning purposes, the pre-construction time periodis estimated to be one hundred and eighty (180) calendar days. The construction contract period is projectedfor a term of three hundred and sixty-five (365) calendar days except as may beotherwise amended or negotiated. MANDATORYPRE-SUBMITTAL TELECONFERENCES: Mandatory pre-submittal teleconferences will be held onMonday, November 30, 2026, at 10:00am and Tuesday December 01, 2026, at 2:00pm.Pre-registration is required to participate in the teleconference. Respondents must have an employee of theirfirm attend at least one (1) of the two (2) pre-submittal conferences. TFCshall reject qualifications submitted by firms that did not attend one of themandatory pre-submittal conferences. EVENTDATEIssue RFQ11/17/2026Mandatory Pre-Submittal Teleconferences1st Pre-Submittal ConferenceOR2nd Pre-Submittal Conference 11/30/2026, 10:00 AMOR12/01/2026, 02:00 PMDeadline for SP Good Faith Effort Notification Emails12/03/2026Deadline for Submission of Questions12/09/2026, NoonTFC’s Response to Questions12/11/2026, 5:00 PMDeadline for Submission of Qualifications and SP12/15/2026, 3:00 PMNotification of Short List Selection12/28/2026Optional Site Visit01/05/2027, 10:00 AMDeadline for Submission of Step 2 Pricing Proposals01/08/2027, 3:00 PM If interviews are NOT required by TFC Award by Commission02/18/2027, 9:00 AMExecute Contract03/01/2027 If interviews are required by TFC Notification of Interview Selection01/12/2027Interviews01/20/2027Award by Commission02/18/2027, 9:00 AMExecute Contract03/01/2027

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 15 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope repairs, new roofing, and interior reconfiguration. Key technical upgrades include the installation of new HVAC systems, rooftop air-handling units, air-cooled water chillers, exhaust extraction, compressed air systems, and a full NFPA-compliant fire suppression system. Additionally, the work covers the replacement of electrical distribution, lighting, low-voltage systems, building automation controls, and site improvements such as paving, drainage, and hazardous materials abatement. The contract is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. Award will be based on the lowest price for two primary exhibit line items: building renovation and paving removal and replacement. Proposals are due by November 23, 2026. Depending on the proposal value, contractors may be required to provide bid, payment, and performance bonds, with bid bonds set at 20 percent of the proposal amount. The project is subject to the Davis-Bacon Act and Buy American requirements, and all work must comply with ADA accessibility guidelines. Invoicing is processed monthly via Wide Area Work Flow (WAWF) using NAVFAC Form 7300/30.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
Roof Replacement Mandatory Site Visit: 12/03/2026 @ 11 AM
Solicitation # 26-144
This subcontracting opportunity, managed by Atterbury Job Corps Center and Adams & Associates Inc., is for the full replacement of the roof on Building #1963 LBJ Dorm in Edinburgh, Indiana. The project is necessitated by extensive storm and wind damage, including multiple leaks and a damaged roof ridge cap. The selected contractor must be licensed in the State of Indiana and adhere to EPA, OSHA, and national building codes, as well as the latest Davis Bacon Act wage rate decisions. Key deliverables include a sequenced construction schedule due within 10 days of the Notice to Proceed, a one-year workmanship guarantee, and a two-year manufacturer's product warranty. The award will be based on Best Value rather than lowest price, with evaluation criteria weighted toward price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal with a detailed cost breakdown for labor, materials, and equipment, along with a timeline for substantial completion and a 90-day bid guarantee. A mandatory site visit is scheduled for December 3, 2026, at 11:00 AM; attendance is required for bid consideration. Insurance requirements include automobile liability coverage and workers' compensation, with Adams and Associates, Inc. named as an additional insured. Payment terms are Net 30.
Atterbury Job Corps – Adams & Associates

POSTED

about 3 hours ago

DEADLINE

in 26 days
View Details
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Springdale Job Corps Center, operated by Career Systems Development Corporation for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of its North Wing dormitory in Troutdale, Oregon. The project aims to restore residential rooms, bathrooms, common areas, and mechanical rooms that suffered extensive interior damage due to water intrusion. The scope of work includes drywall installation, joint finishing, and painting, as well as the temporary removal and re-installation of HVAC equipment. The selected contractor must provide all labor, materials, equipment, and supervision to return the affected spaces to safe residential use, ensuring proper protection of the occupied building and minimal service interruptions. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Proposals must include detailed relevant experience, a comprehensive work plan with project phasing, and itemized pricing by room and trade. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Awardees must provide payment and performance bonding for the full project value, along with liability and worker's compensation insurance, within ten days of award. Final acceptance by CSD is contingent upon the correction of all deficiencies and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 3 hours ago

DEADLINE

in 2 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS