Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Oklahoma was posted on October 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CN-0820-06 Chewey

Closed
CN-0820-06State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. This comprehensive infrastructure project requires a wide array of specialized services, including site preparation, land surveying, subsurface investigation, and shoring. The scope further extends to complex pipeline and utility work such as tunneling, boring, jacking, micro tunneling, and the installation of steel casing and cathodic protection. Additionally, the project encompasses surface work including asphalt paving, concrete drilling, landscaping, and the installation of traffic signs, signals, and lighting, as well as environmental support services like storm water pollution prevention. This opportunity is specifically targeted toward qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must hold a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested parties must submit their quotes via the Building Connected system by the deadline of November 18, 2025. For further details, plans and specifications are available for review at Kiewit's office in Santa Fe Springs, California.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 1 day
NAICS: 237310
New
SLED
Stow Road Sidewalk Improvements (Ravenna Street to E. Streetsboro (SR 303))
Solicitation # 50011
The City of Hudson, Ohio, is soliciting bids for the Stow Road Sidewalk Improvements project, which involves the installation of 5,045 linear feet of five-foot-wide concrete sidewalk extending from Ravenna Street northward toward E. Streetsboro (SR 303). The scope of work includes clearing, grubbing, drainage improvements, the installation of Type 3 catch basins and 24-inch HDPP conduit, and the implementation of erosion control measures and a StormWaterPollutionPreventionPlan. All work must adhere to City of Hudson standards and specific ODOT specifications, including ODOT 301 for asphalt concrete and ODOT 614 for maintenance of traffic. Additionally, curb ramps must be installed in compliance with ADA standards and ODOT SCD BP 7.1. Bids are submitted on a unit price basis via the Bid Express website and must be accompanied by bid security, such as a Bid Guaranty and Contract Bond or a certified check for 10% of the bid. Evaluation is based on bidder qualifications, responsibility, and compliance with prescribed requirements. The successful contractor will be required to provide a performance bond and certificates of insurance before commencing work. Payments are processed via applications for payment submitted to the project engineer, with payment due within 60 days of presentation to the owner. The project requires a registered Professional Surveyor in the State of Ohio for construction layout and verification.
City of Hudson

POSTED

2 days ago

DEADLINE

in 22 days
NAICS: 237310
New
SLED
Multi-Purpose Path along Barlow Road (Phase 2)
Solicitation # 50012
The City of Hudson, Ohio, is soliciting bids for the Multi-Purpose Path along Barlow Road (Phase 2) project. The scope of work involves the installation of approximately 200 lineal feet of seven-foot wide Class C concrete trail, along with grading, pavement striping, storm and road improvements, and potential railroad improvements. Key deliverables include the installation of traffic signs and supports, and the contractor is required to maintain two-way traffic on Barlow Road during construction. The project must be completed, including all punch list items, by April 30, 2027, with liquidated damages of $1,000 per day for delays beyond this date. The contract will be awarded to the lowest and best bidder based on compliance, responsiveness, and the bidder's financial and professional qualifications. Eligible bidders must demonstrate at least three years of experience in similar work and the successful completion of at least three comparable projects. This is a unit price contract requiring bid security of 10% of the bid amount, as well as performance and payment bonds and three specific insurance policies. All work must adhere to the City of Hudson Engineering Standards, ODOT Construction and Material Specifications, and OSHA confined space requirements. Furthermore, the contractor must comply with Ohio Revised Code Chapter 4115 regarding prevailing wage rates. Bids must be submitted electronically via Bid Express.
City of Hudson

POSTED

2 days ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The Cherokee Nation Department of Transportation and Infrastructure is soliciting bids for the Chewey North – River Road Project (CN-0820-06) located in Adair County, Oklahoma. This project involves the grading, drainage, and surfacing of 4.35 miles of an existing gravel county road to create a 24-foot wide asphalt roadway including shoulders. The scope of work encompasses clearing and grubbing, unclassified excavation and borrow, the installation of aggregate base and subgrade, and the implementation of stormwater management, traffic control, and erosion control measures. Key deliverables include the installation of combined curb and gutter, plural-component traffic stripes, and various signage and fencing. This is a Fixed Completion Date Contract awarded to the lowest responsive and responsible bidder. Bidders must have attended the mandatory pre-bid conference held on September 22, 2026, to be eligible. Proposals must be submitted electronically via Bid Express by 10:00 a.m. on October 13, 2026. The contract incorporates the 2019 Oklahoma Department of Transportation Standard Specifications, as amended by the Cherokee Nation, and requires strict adherence to Indian preference policies in employment and subcontracting. Required submission documents include bidder qualifications, non-collusive bidding certifications, a bid bond, and a detailed plan for Indian preference. Performance must begin within 30 calendar days of the Notice to Proceed.

General Info

Bids for 4.35-mile asphalt road project in Adair County due October 13, 2026.

Documents

12
PDF, High priority: read this first1 page · amendment
High
PDF, High priority: read this first1 page · amendment
High
PDF, High priority: read this first9 pages · request-for-approval-of-subcontractor
High
PDF, High priority: read this first159 pages · amendment
High
PDF, High priority: read this firstsow
High
PDF, High priority: read this first4 pages · q-and-a
High
PDF, High priority: read this first2 pages · q-and-a
High
PDF, High priority: read this first1 page · specifications
High
PDF, High priority: read this first1 page · specifications
High
PDF, Low priority1 page · award
Low
PDF, Low priorityother
Low
PDF, Low priorityother
Low

Read all 12 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 15 days
  • North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1Open now, due in 2 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOklahoma → Cherokee Nation Department of Transportation & Infrastructure
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Date Bid Notice Issued September 08, 2026. Project Lat. 35°48’55”N Long. 94°44’58”W. The Cherokee Nation is seeking bids for the Chewey North – River Road Project CN-0820-06. Located in Adair County, this project is 4.35 miles in length. This project is the grading, drainage, and surfacing of 4.35 miles of an existing gravel county road which consist of 24’ wide asphalt roadway including shoulders.
Project will be a Fixed Completion Date Contract consisting of: [See schedule of items] (See Part 2, Specifications, subsections 108.02, “Notice to Proceed and Preconstruction Conference” and 108.07.C, “Fixed Completion Date Contract”). Plans and Specifications are available for viewing at: www.bidexpress.com. Attendance at the pre-bid conference is MANDATORY. A pre-bid conference shall be at 10:00 a.m. on September 22, 2026, at the CNDOT building at Cherokee Nation headquarters, approximately 3.5 miles south of Tahlequah, Oklahoma on Highway 62. A location map is included on the Bid Express website at www.bidexpress.com. Bids will not be accepted from Bidders who do NOT have a representative attending the pre-bid conference. The Bidder must not make telephone or other oral inquiries concerning this Bid Notice or the Bid Proposal. All correspondence and questions regarding this Bid Notice and requests for additional information must be directed in writing on Bid Express under Q & A, no later than 5:00 p.m., September 29, 2026. Responses to questions and any bid document updates and/or addendums will be posted on or before 5:00 p.m., October 6, 2026, on Bid Express at www.bidexpress.com. Failure of the Bidder to receive responses to questions shall not relieve the Bidder from any obligation under a bid as submitted. SUBMISSION OF BIDS Bidders must complete Part 1 of the Bid Proposal Forms (See Instructions, p. 1 of this Part, Bid Proposal Checklist, p. 2-5 of this Part.). The original sealed Bid shall be submitted on the Bid Express website at www.bidexpress.com. The original Bid shall be completed on the website no later than 10:00 a.m. on October 13, 2026. Any bid received after this deadline will not be considered. The Bidder may modify or withdraw the Bid at any time prior to the bid submission deadline, provided such communication is received in writing by the designated contact person for this Bid Notice prior to the bid submission deadline. Cherokee Nation Department of Transportation, P.O. Box 948 Tahlequah, OK 74465.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS