This Solicitation opportunity from Department Of Defense was posted on August 18, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CNS Alternate Transformer Substation

Closed
FA557525B0010Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
24-17.11
Solicitation # 24-17.11
The City of Piqua, Ohio, is soliciting bids for Project No. 24-17.11, which involves the construction of the Washington Road 69kV Transmission Line. The project scope includes the furnishing and installation of approximately 2.0 miles of 69kV transmission line terminating at a new 69kV/13.8kV substation. Key technical requirements include a 12.47kV distribution underbuild from Pole P1 through Pole P18, the installation of all-dielectric self-supporting fiber optic cable along the entire length, and the placement of various steel and ductile iron poles. The engineer's estimate for the work is $1,900,000. Bids will be awarded based on the lowest and best bid, with a strong emphasis on the bidder's financial standing, performance experience, and ability to complete the work in the shortest time possible. Bidders must provide a bid bond of 10% of the total bid amount, and the successful contractor will be required to post a combined performance-payment bond for 100% of the contract value. Compliance with State of Ohio Prevailing Wage laws, the National Electric Safety Code, and the Americans with Disabilities Act is mandatory. Contract administration is managed through the Office of the Architect-Engineer, with payments processed monthly. Equipment payments are structured at 90% upon delivery F.O.B. to the City of Piqua and the remaining 10% upon satisfactory energizing and acceptance of the system. All deliveries must be coordinated 48 hours in advance, and shipments in enclosed trailers will be refused. Bids must be submitted in duplicate via Bid Express, email, or sealed hard copy by the specified deadline.
City of Piqua

POSTED

about 16 hours ago

DEADLINE

in 9 days
NAICS: 237130
New
Federal
USFK C4I Communication Tower and Facility Maintenance CY27
Solicitation # W91QVN26QXXXX
This firm-fixed price non-personnel services contract, solicitation number W91QVN26QXXXX, provides communication tower and facility maintenance for the 41st Signal Battalion C4I mission support in South Korea. The scope of work includes physical and visual inspections of metal surfaces for structural integrity, maintenance of bonding, grounding, and lightning protection systems, LED replacement for beacon and side marker lights, and interior and exterior repairs for C4I communication shelters. Performance is required across multiple sites, including Papyongsan, Yongsan TCF, Osan Bucket, Highpoint, and CP Walker AFN FM. The base period of performance is 12 months from the date of award, with funding provided by the Republic of Korea Ministry of National Defense (ROK MND). Award will be made on an all-or-none basis to the responsible offeror submitting the lowest price that is technically acceptable. Technical acceptability is evaluated on a pass/fail basis, requiring a complete technical package and compliance with the Performance Work Statement. All price proposals must be submitted in Korean Won. The contractor must provide key personnel, including an Information and Communication Engineer and a CQCSM/Safety Manager with specific education and experience requirements. Mandatory qualifications include an Information and Communication Construction License and an Electrical Construction License. The contractor is also required to adhere to strict security protocols, including AT/OPSEC compliance for foreign performance and the safeguarding of Controlled Unclassified Information.
0411 Aq Hq Contract Augmented

POSTED

about 21 hours ago

DEADLINE

in 29 days
NAICS: 237130
New
SLED
Refurbishment Of Existing On Load Tap Changer At Adobe Creek Substation - AC21
Solicitation # RFQ199445
The City of Palo Alto Utilities is seeking a contractor under RFQ199445 to refurbish the existing TLH-21 On Load Tap Changer (OLTC) on an Allis Chalmers 15MVA transformer at the Adobe Creek Electric Substation (AC-21). This project is critical to mitigating reliability risks for customers served by the Adobe Creek, Colorado, and Maybell substations, as the current transformer is offline due to mechanical failures and oil migration issues. The scope of work includes replacing the TLH-21 LTC with a certified re-manufactured component, draining and filling the LTC and main tanks, re-sealing barrier boards and pass-through studs, replacing the 60KV SMD fuse holder and radiator valves, and performing comprehensive pressure and vacuum testing. The City mandates the use of Allis Chalmers TLH-21 components and will not accept alternate substitutions. The contract will be awarded to the lowest responsive and responsible bidder based on the lowest Base Bid. Qualified bidders must demonstrate sufficient experience, capacity, and a satisfactory performance history, and must provide proof of registration with the California Department of Industrial Relations. As a public works project, the contract is subject to California prevailing wage laws and requires compliance with the City's Environmental Purchasing Policy. Key administrative requirements include monthly invoicing in arrears with a 30-day payment term, the submission of insurance certificates to the purchasing support email, and the provision of bond forms if the contract sum exceeds 25,000 dollars. Delivery terms are F.O.B. Palo Alto, Freight Prepaid, and the City remains responsible for de-energizing and grounding the transformer to ensure a safe work area.
Utilities

POSTED

1 day ago

DEADLINE

in 15 days

AI Contract Overview

Show more

This solicitation concerns Project QUUG 10-1049, the CNS Alternate Transformer Substation at Moron Air Base, Spain. The project is estimated between $1,000,000 and $5,000,000 USD and will be governed by extensive requirements, including compliance with Spanish codes, laws, and standards, notably those of the Spanish Electrical Distribution company, Endesa Distribucion. Updates to the documentation and design are expected to reflect recommendations from Endesa, with certain items being executed directly by Endesa but remaining within the overall project scope. All prospective contractors must be authorized, registered, and licensed to perform government construction projects in Spain and must adhere to both Spanish and US defense agreement requirements. Use of Spanish materials, labor, and equipment is required whenever feasible. Key recent amendments specify corrections to the Questions & Answers document, especially relating to the construction cost estimate for Endesa works, which must be filled out as 194,374.81 EUR (IVA included). The bid due date was extended to 20 August 2025 at 10:00 am local time (CEST) in an earlier amendment, and no further extensions are anticipated due to funding and fiscal year constraints. All terms and conditions except those explicitly amended remain unchanged. The site visit is scheduled for 15 July 2025 at 10:00 am, and attendance requires RSVP and, if necessary, arrangements for base access. Contractors must request certain large attachments via email. Bids must be valid through 31 December 2025 due to funding uncertainties, and the government may cancel the solicitation without obligation at any time. Only local Spanish sources will be considered. The primary points of contact for this solicitation are Ms. Elia Portz, TSgt Augustus Shinn, and SrA Ryan Kulpa.

General Info

Project QUUG 10-1049: $1-5M CNS transformer substation at Moron AB, Spain, Spanish compliance required.

Contract Value

$3,372,960.74

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

Moron Air Base, AE, 41530, ESP

Set-Aside

NONE

Award Issued Date

Documents

10

Amendment 0002 to Solicitation FA557525B0010

PDF, High priority: read this firstamendment
High

Amendment 1 - Solicitation FA557525B00100001 (Moron AB Transformer Substation)

PDF, High priority: read this first3 pages · amendment
High

CNS Transformer Substation - Additive #1 Drawings

PDF, High priority: read this first7 pages · specifications
High

CNS Transformer Substation - Additive #2 Drawings

PDF, High priority: read this first10 pages · specifications
High

Construction Cost Estimate Breakdown - CNS ALT Substation Amendment #1

XLSX, High priority: read this first21 pages · specifications
High

Project QUUG 10-1049 CNS ALT Substation Specifications Amendment #1

PDF, High priority: read this first311 pages · specifications
High

Project QUUG 10-1049 CNS ALT Substation - Specifications (Spanish) Am#1

PDF, High priority: read this first320 pages · specifications
High

Schedule of Material Submittals - CNS ALT Substation

XLSX, High priority: read this first19 pages · specifications
High

Solicitation FA557525B0010 - CNS Alternate Substation Multi

PDF, High priority: read this first31 pages · rfp
High

Solicitation FA557525B0010 Contractor's Questions and Answers - Project QUUG 10-1049

PDF, Low priorityq-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

7 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Aug 6, 2025 to Aug 20, 2025. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA5575 496 Abs Pk
Contacts2 people available
OfficeAPO, AE, 09643-6585, USA
Office AddressAPO, AE, 09643-6585, USA
Contacts

Full Description

Show more
AMENDMENT 6: The purpose of this amendment is to correct an error on the Questions and Answers document. Prospective contractors should direct their attention to Question #5 and Answer #6. Bottom line up front, prospective contracts shall submit their Construction Cost Estimate Breakdown with line item #102 (Endesa works) filled out with a total of 194,374.81 EUR (IVA included). All other terms and conditions of this solicitation remain unchanged. AMENDMENT 5: The purpose of this amendment is to provide the final version of the amended documents following the changes mandated by the Spanish Electrical Distribution company, Endesa Distribucion. The following documents will be added: 1. AMD 5 - Drawings - Basic Package 2. AMD 5 - English Specifications 3. AMD 5 - Especificaciones Espanol 4. AMD 5 - Summary of Amd 5 Changes Please request for the files via email to the Construction team POCs. The bid due date will not be extended due to the risk of funds availability and the timeframe in relation to the end of FY25. All other terms and conditions of this solicitation remain unchanged. AMENDMENT 4: The purpose of this amendment is to provide the Questions and Answers submitted by contractors for this solicitation. Please refer to the attachments section for the Q&A document. All other terms and conditions of this solicitation remain unchanged. AMENDMENT 3: The purpose of this amendment is to extend the bid due date to 20 August 2025 at 10:00 am local time (CEST). All other terms and conditions of this solicitation remain unchanged. AMENDMENT 2: The purpose of this amendment is to notify prospective contractors of a few updated attachments: 4. English Specifications - AMD 1 5. Especificaciones Espanol - AMD 1 6. Construction Cost Estimate Breakdown BLANK - AMD 1 All other terms and conditions of this solicitation remain unchanged. AMENDMENT 1: The site visit date and time have been updated to 15 July 2025 at 10:00 am local time (CEST). Additionally, the following changes are anticipated due to mandatory design changes initiated by the Spanish Electrical Distribution company, Endesa Distribucion: 1. The projected electrical utilities are in the 50 Hz side of the Moron AB electrical system and they will be electrically connected to the Spanish distribution grid. As a result, the Spanish codes, rules and procedures are mandatory in this project. 2. The electrical distribution grid company, where these utilities will be connected to, belongs to Endesa Distribucion (EDE), that has their own standards that are also mandatory in this project, and are subject by review and approval by EDE technical personnel. 3. EDE's review is taking place in these days, so it is expected that minor changes will occur in project drawings and specifications as a result of EDE's recommendations. These recommendations are not expected to increase/decrease the scope of the project, but they will mainly be associated to parts of the installation being installed by either the Contractor or by EDE with their own means (whose cost will remain under the project in any case, since the Contractor will have to arrange with EDE the coordination, execution of works and commissioning of all utilities). 4. The design includes all necessary installations and utilities for the new 5 MVA transformer bay, being a comprehensive solution. Possible changes to the design, as mentioned above, will mainly drive to items being deleted from the drawings/specs since they will be executed by EDE and not by the Contractor, but will be indeed executed within the project anyways. As a result of the above, please expect some of the project documents to change. The updated documents will be made available as soon as we receive them. Any extensions to this solicitation will be considered after receipt of the updated documents. Project QUUG 10-1049, CNS Alternate Transformer Substation, Moron Air Base, Spain. The magnitude of this project is between $1,000,000 and $5,000,000 U.S. Dollars. This is furnished for the convenience of prospective contractors. The actual extent of work requirements will be governed by the specifications and drawings. See section L for complete information regarding referenced project. Offers will be evaluated according to the criteria in Section M, Evaluation criteria for award. A pre-proposal Conference / Site Visit will be held 15 July 2025, 10:00 hours local time, in the Contracting Conference room, bldg 106. Please RSVP via email at least 24 hours prior to the site visit. Unless you have access to Moron Air Base, you will need an escort. If you require an escort, please request access via email at least 72 hours prior to the site visit. Questions in regards to this solicitation must be submitted via email no later than 23 July 2025. Bids must be received no later than 10:00 hours local time on 6 August 2025. Bids submitted by facsimile will NOT be accepted. Please ensure bids adhere to all requirements found in Section L of this solicitation. Nonconforming bids will not be accepted or evaluated. Due to file size constraints, interested contractors must request one attachment, 1. Drawings - Basic Package. The Contracting POCs are: Ms. Elia Portz: elia.portz_cueli.1.es@us.af.mil TSgt Augustus Shinn: augustus.shinn@us.af.mil SrA Ryan Kulpa: ryan.kulpa@us.af.mil In accordance with the Agreement of Defense and Cooperation between the Kingdom of Spain and the United States of America, any contract resulting from this notice/solicitation can only be entered into with companies authorized to carry out these activities in Spain under Spanish law. Companies must meet the requirements established by Spanish legislation for execution of Government works. In addition, in accordance with the Agreement of Defense Cooperation between the U.S.A. and the Kingdom of Spain, Annex 6, Article 1 (3) "The contractors must meet the requirements established by Spanish legislation for execution of government works. A breach of contract on the part of a contractor shall have the same consequences for the contractor for purposes of future contracting with the Spanish government as would occur with a breach of a contract with the Spanish public administration." and (5) " Spanish material, labor, and equipment shall be used whenever feasible and consistent with the requirements". NOTE: THIS SOLICITATION IS INTENDED ONLY FOR LOCAL SOURCES IN ACCORDANCE WITH FEDERAL ACQUISITION REGULATION 5.202(a)(12). LOCAL SOURCES ARE THOSE SOURCES NORMALLY RESIDENT, LICENSED AND REGISTERED TO CONDUCT CONSTRUCTION BUSINESS IN SPAIN. OFFERS FROM NON-LOCAL SOURCES WILL NOT BE CONSIDERED UNDER THIS SOLICITATION. Notice to Offerors: Funds are not presently available within USAFE to fund this project, so bid acceptance period should be valid through 31 Dec 2025. The Government reserves the right to cancel this solicitation, at any time with no obligation to the offeror by the government.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS