Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Transportation was posted on May 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CO NP COLM 10(5), GUARDRAIL IMPROVEMENT

Closed
6982AF26Q000007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified SBE, VSBE, and DBE firms for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering heavy civil and infrastructure activities including site preparation, asbestos abatement, tunneling, underground piping, asphalt and concrete paving, electrical systems, and telecommunications. Interested firms must provide evidence of certification through the Department of General Services and the Port of Long Beach PlanetBids portal. Bidders are required to hold a valid California Contractor's license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades, including carpenters, laborers, cement masons, ironworkers, operating engineers, and teamsters. Funding is provided through multiple grants, including the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD 2021 Port Infrastructure Development Program, necessitating compliance with DBE Program requirements. Interested parties must contact Lead Estimator Cassandra Shore to receive an Invitation to Bid via the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 11 hours ago

DEADLINE

in about 2 months
NAICS: 237310
New
SLED
ACADEMY OF RICHMOND COUNTY PARKING LOT PAVEMENT REPAIR and STRIPING
Solicitation # 26-214
The Richmond County Board of Education has issued RFP 26-214 for turnkey pavement repair and striping services at the Academy of Richmond County, located at 910 Russel St., Augusta, Georgia. The scope of work includes patching designated areas to match existing pavement, installing curb and gutter to enclose grease trap access manholes, and performing line striping. Specific technical requirements include the use of 3,000 FSI concrete with a fine broom finish, 98% compacted subgrade, and MPI #32 alkyd traffic-marking paint. All new striping and hatching must be yellow, while stop bars and existing crosswalks must be recoated in white, adhering to Georgia DOT Construction Standards. Asphalt top courses must cure for at least 14 days before painting. The contract will be awarded to the lowest responsible and responsive bidder, with an anticipated award date of October 20, 2026. Sealed bids are due by 3:00 PM on October 7, 2026, and must include turnkey pricing, a project lead time, company references, and a signed Sex Offender Acknowledgement Form. Contractors must maintain commercial general liability insurance of 2 million dollars and worker's compensation insurance of 1 million dollars. Compliance with Georgia state laws is mandatory, including E-Verify affidavits, periodic criminal history record inquiries under O.C.G.A. 35-3-34, and adherence to a smoke-free environment on school property. All work coordination and deliveries must be cleared through David Perry.
Richmond County Board of Education

POSTED

about 16 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

The contract, identified as CO NP COLM 10(5) and titled Guardrail Improvement, pertains to the replacement and installation of guardrail systems at Colorado National Monument in Mesa County, Colorado. Work includes removing and replacing existing guardrails, posts, blocks, and end terminals, as well as installing new guardrail systems of Type 2 Class A Wood Posts (Natina) totaling 325 linear feet and six Type MGS Tangent terminal sections. Additionally, portions of the roadway shoulder will be built up in three designated areas, and boulders will be reset in one location. The project also involves installing a single solar-powered radar flashing speed sign to enhance safety. Materials required include 120 tons of roadway aggregate per Method 2. The contract is a total small business set-aside under NAICS code 237310, with an estimated value between $250,000 and $700,000. Performance must commence within 10 calendar days of receiving the notice to proceed and be completed no later than August 11, 2026, with a mandatory work stoppage from August 24–26, 2026, in observance of the National Park Service birthday. All work is governed by federal construction specifications and standards including AASHTO and ASTM, and must comply with environmental, safety, and sustainability mandates such as Buy American and EPA Comprehensive Procurement Guidelines. The contract is tightly regulated through numerous Federal Acquisition Regulation (FAR) clauses that govern payment, performance, inspection, disputes, and subcontracting. Payment must be requested electronically via the DELPHI/iSupplier system, and contractors are required to provide performance and payment bonds as well as proof of financial responsibility. The government retains authority to inspect work at multiple stages—including production, placement, and after compaction—with final acceptance contingent on compliance with specification standards. Contractors must maintain detailed quality control records and bear the cost of rework for any nonconforming materials or installations. Required representations include current SAM registration with a valid UEI and CAGE code, size certification as a small business, and disclosures regarding tax delinquency, felony convictions, or improper payments. The technical evaluation prioritizes price, technical approach (including subcontracting plans and key personnel qualifications), and relevant experience with comparable guardrail and roadway projects exceeding $200,000 in the past five years. Award will be made based on best value, not lowest price,

General Info

Guardrail improvements at Colorado National Monument under firm-fixed-price contract, using specified materials, complying with federal standards and small business requirements.

Agency

Department Of Transportation → 6982AF Central Federal Lands DivisiView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CO, 81521, USA

Set-Aside

SBA

Documents

(6)

CO NP COLM 10(5) Guardrail Improvement Plans

PDFspecifications

QnA 04.28.2026 COLM Guardrail Improvement

PDFq-and-a

Amendment A002 to Solicitation 6982AF26Q000007

PDFamendment

QnA for CO NP COLM 10(5) Guardrail Improvement

PDFq-and-a

RFQ 6982AF26Q000007 Guardrail Improvement Project

PDFrfq

Amendment A001 to Solicitation 6982AF26Q000007

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseClosed
Posted

Combined Synopsis

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Amendment 4

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6982AF Central Federal Lands Divisi
Contacts2 people available
OfficeLAKEWOOD, CO, 80228, USA
Organization / Agency
Department Of Transportation → 6982AF Central Federal Lands Divisi
View Agency Profile
Office AddressLAKEWOOD, CO, 80228, USA
Contacts

Full Description

Show more

PROJECT NUMBER:  CO NP COLM 10(5)



PROJECT NAME:  Guardrail Improvement



PROJECT DESCRIPTION: 


Guardrail replacement and new installation – Colorado National Monument, Mesa County, CO.



SCOPE OF THE WORK: 


Work consists of existing guardrail, guardrail post, guardrail block, and end terminal replacement.  New guardrail and building up portions of the shoulder is proposed in three areas.  One area will have resetting of boulders.



PRINCIPAL WORK ITEMS:



Pay Item


Description


Quantity


30202-2000


Roadway Aggregate, Method 2


120 TON


61701-4550


Guardrail System MSG, Type 2 Class A Wood Posts (Natina)


325 LNFT


61702-1500


Terminal Section, Type MGS Tangent


6 EACH


61805-1000


Remove and Reset Barrier


320 LNFT


63301-0000


Sign System (Solar Radar Flashing Speed Sign)


1 EACH

More opportunities from Department Of Transportation → 6982AF Central Federal Lands Divisi

Same awarding agency

NAICS: 237310
New
Federal
NV BL SONV 500(3) Red Rock Trail
Solicitation # 6982AF26SS00007
The Red Rock Trail project in Las Vegas, Nevada, is currently in the sources-sought phase to determine if there is sufficient interest from qualified small business prime contractors to justify a set-aside. Located within the environmentally sensitive Red Rock Conservation Area, the scope of work involves constructing approximately seven miles of paved multi-use trail, widening State Highway 159 for additional turn lanes, and reconstructing the Moenkopi and Blue Diamond Mesa parking areas. Key technical requirements include 35,000 cubic yards of embankment construction, 30,000 tons of roadway aggregate, 12,000 tons of asphalt concrete pavement, 200 linear feet of precast reinforced concrete box culverts, and 2,500 square feet of MSE wall. Interested prime contractors must be certified in the System for Award Management and submit their response to Douglas Whitcomb by September 23, 2026, at 2 p.m. local Denver time. Submissions must include a statement of intent to bid, confirmed socioeconomic categories, a bonding agent letter verifying a single project capacity of 30 million dollars, and a list of previous road construction projects of similar value and scope. Specifically, applicants must demonstrate experience in multi-use trail construction, highway widening, parking area reconstruction, and grade-separated under-crossings within environmentally sensitive areas.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 11 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS