Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Michigan was posted on May 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Cold Milling of Existing HMA Surface

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. This heavy civil infrastructure project encompasses a broad scope of work, including site preparation, earthwork, asbestos abatement, tunneling, utility installation, paving, and electrical systems. The solicitation specifically targets qualified Small Business Enterprises, Veteran-Owned Small Business Enterprises, and Disadvantaged Business Enterprises, requiring SBE and VSBE firms to provide certification from the Department of General Services and the Port of Long Beach via the PlanetBids portal. The project is subject to the California Labor Code, prevailing wage rates, and a Project Labor Agreement. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades or demonstrate the ability to maintain labor harmony. Funding is provided through multiple grants, including FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating compliance with DBE Program requirements. Responsive bidders must hold a valid California Contractor’s license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must coordinate through the BuildingConnected system by the September 15, 2026, deadline.
Kiewit Infrastructure West Co.

POSTED

about 13 hours ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 19 hours ago

DEADLINE

in about 2 months
NAICS: 237310
New
SLED
FY 2027 Patching and Repair Project
Solicitation # PE-66204-NONST-2027-000000005
The FY 2027 Patching and Repair Project is a unit price contract issued by the City of Walnut Grove, Georgia, for asphalt patching and mill, patch, and inlay services. The scope of work includes providing all labor, materials, and equipment necessary for repairs at various locations, such as Greenhill Way, Valley Drive, Woodland Circle, and Walnut Court. Key technical requirements include the use of asphalt containing hydrated lime and adherence to GDOT 652 and 653 standards for striping and marking, as well as MUTCD Chapter 6 for temporary traffic control. The contract term is 180 calendar days from the notice to proceed, with a mobilization period of 60 business days. Work is restricted to between 7:00 AM and sundown on weekdays, with specific restrictions for residential areas on weekends and a total prohibition of work on Sundays and select holidays. The contract will be awarded to the lowest responsible bidder who is prequalified by the Georgia Department of Transportation. Bidders must submit a comprehensive proposal including a 5% bid bond, bidder qualifications, and proof of insurance. The successful contractor is required to provide a 100% performance-payment bond and a certificate of insurance naming the City of Walnut Grove as additionally insured within seven days of the award. Payments are processed monthly based on certified invoices for services performed and accepted. Final payment is contingent upon the submission of all test results, including cores and photo reports, and the completion of a final site cleanup.
City of Walnut Grove

POSTED

about 21 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
MS1-00005 Massachusetts St 14th St to 23rd St Multimodal Improvements Project
Solicitation # 2600030
The MS1-00005 Massachusetts St 14th St to 23rd St Multimodal Improvements Project is a construction solicitation issued by the City of Lawrence, Kansas, with a response deadline of October 13, 2026. The project focuses on street maintenance and reconstruction, featuring the installation of 8,000 square yards of concrete separated bike lanes, pavement reconstruction via milling and overlay, storm sewer improvements, and the replacement of sidewalks, including two blocks of 5-foot-wide sidewalk infill. Additional work includes improvements at the 19th and Mass Streets intersection and partial disturbance of a 16-foot-wide grass planter strip. Contractors must coordinate concurrent relocation efforts with AT&T and Black Hills Energy, who are permitted to operate within the contractor's temporary traffic control. The contract requires substantial completion within 340 calendar days and final completion within 365 calendar days of the Notice to Proceed. Bidders must provide an electronic bid bond of at least 5 percent of the bid amount and are subject to KDOT required documents, Davis-Bacon and Related Acts, and Buy America domestic steel requirements. Evaluation for award considers total cost, bidder location, and Disadvantaged Business Enterprise participation efforts. Technical standards include NEMA TS-1 for traffic signals and NSF 61 for potable water materials. Payment is structured through a mix of unit pricing and lump sum for demolition, with payments due within 30 days after completion. Final acceptance by the City is followed by a joint inspection 11 months later.
MSO - CMED

POSTED

about 21 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This contract involves the removal of the existing Hot Mix Asphalt (HMA) surface through the use of cold milling equipment as a preparatory step for resurfacing. The process requires specialized machinery to accurately and efficiently mill the old pavement to ensure a proper foundation for the new surface layer. The work is defined as a subcontract opportunity with an emphasis on the expertise in handling cold milling operations. The solicitation was posted on May 21, 2026, with responses due by June 2, 2026. It falls under the NAICS code 237310, which pertains to highway, street, and bridge construction services. The contract is managed by a Michigan-based engineering agency, though specific location details for the worksite and contacts are not provided. This opportunity is accessible through the designated procurement portal for the City of Jackson, indicating a public sector project focusing on infrastructure improvement.

General Info

Subcontract for cold milling HMA surface removal, posted May 21, 2026, deadline June 2, 2026.

Agency

Michigan → EngineeringView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

MI, USA

Set-Aside

NONE

Documents

This scope was carved out of 2026-ENGINEERING-020.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ENG 26-11 M-106 COOPER STREET MAINTENANCE PAVING

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMichigan → Engineering
ContactsNo contacts available
OfficeN/A
Organization / Agency
Michigan → Engineering
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Removal of existing Hot Mix Asphalt surface using cold milling equipment to prepare for resurfacing.

More opportunities from Michigan → Engineering

Same awarding agency

NAICS: 115112
SLED
ENG 25-04C STREET TREE PURCHASE & PLANTING - REBID #2
Solicitation # 2026-ENGINEERING-038
The City of Jackson is soliciting proposals for the purchase and planting of approximately 200 street trees across a minimum of 15 species for the Spring 2027 planting season. The selected contractor will be responsible for all labor, materials, and equipment required for planting and restoration, as well as a one-year establishment period to maintain tree health through watering and staking. The contract may be renewed for two additional terms, Fall 2027 and Spring 2028, with a cost-of-living adjustment of up to 3% per renewal. Substantial completion is required by July 2, 2027, with final completion of all punch list items and replacement plantings due by October 31, 2029. The contractor must guarantee the health of all trees through the establishment period, replacing any dead or unhealthy trees at no additional cost to the City. This solicitation, numbered 2026-ENGINEERING-038, requires compliance with the 2020 MDOT Standard Specifications for Construction and federal mandates, including the Davis-Bacon Act for prevailing wages and USDA grant requirements. Bidders must provide unit pricing for 1.5-inch and 2.5-inch caliper trees and submit their proposals via the e-Procurement Portal by September 30, 2026, at 10:00 am. Award is expected on October 20, 2026, with work commencing no earlier than April 1, 2027. Required documentation includes a performance bond, a labor and material payment bond, and certificates of insurance. The City will determine the best bid based on a weighted evaluation of the executive summary, project management approach, staff experience, proposed timeline, and company qualifications.
Soil Preparation, Planting, and Cultivating

POSTED

about 1 month ago

DEADLINE

in 18 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS