Colorado River Bridge Replacement Project

Forecast
2081(b)-2025-065-06State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Colorado River Bridge Replacement Project, managed by the California Department of Transportation District 8, involves the demolition of the existing I-40 bridge and the construction of a new structure along Interstate 40 from Post Mile 153.9 to 154.7 in San Bernardino County. Key activities include pile driving, installation of temporary pile supports and caisson systems, construction of temporary access roads, vegetation removal, and work within the wetted channel of the Colorado River. The project is scheduled to begin in September 2026 and conclude in July 2029. Due to the project's location, it is subject to California Endangered Species Act Incidental Take Permit No. 2081(b)-2025-065-06, issued by the California Department of Fish and Wildlife. This permit authorizes the incidental take of the Yuma Ridgway rail, California black rail, razorback sucker, and bonytail chub. The project will impact approximately 2.38 acres of habitat and partially overlaps a restoration area for the PG&E Topock Compressor Station project, potentially affecting 1.5 acres of active restoration including various native tree species. Compliance requires adherence to a specific Mitigation Reporting or Monitoring Plan adopted by the California Department of Fish and Wildlife.

General Info

I-40 bridge replacement from Sept 2026 to July 2029 impacts protected species and habitats with permitted incidental take.

Agency

California → Caltrans, District 8 - San Bernardino/Riverside

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 8 - San Bernardino/Riverside
Contacts2 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 8 - San Bernardino/Riverside
Office AddressN/A
Contacts
Chris BriggsEnvironmental Scientist
Adam ComptonBranch Cheif

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has issued an ITP (No. 2081(b)-2025-065-06), pursuant to Section 2081(b) of the Fish and Game Code to the California Department of Transportation, District 8. The Project consists of the replacement of the I-40 Colorado River Bridge. Project activities include vegetation removal, construction of temporary access roads, installation of temporary formwork, installation of temporary pile supports and caisson systems, work within the wetted channel of the Colorado River, pile driving, new bridge construction, demolition of existing bridge, installation of navigational lighting, and other activities. The Project partially overlaps an area that is being restored by Pacific Gas & Electric (PG&E), as part of PG&E’s Topock Compressor Station project. Project-related vegetation removal may impact approximately 1.5 acres of an active restoration area for PG&E’s Topock Compressor Station project, including dozens of trees planted in the past few years. Impacted trees are likely to include blue palo verde, honey mesquite, screwbean mesquite, desert smoke tree, and catclaw acacia. Impact areas also include common reed marsh (Phragmites australis alliance), tamarisk thicket (Tamarix spp. alliance), and creosote bush desert scrub (Larrea tridentata alliance). Project construction is anticipated to begin in September 2026 and conclude in July 2029. The Project will result in impacts to 2.38 acres of habitat for Yuma Ridgway’s rail (Rallus obsoletus yumanensis), California black rail (Laterallus jamaicensis coturniculus), razorback sucker (Xyrauchen texanus), and bonytail chub (Gila elegans), including temporary impacts to approximately 2.38 acres; the Project will permanently remove 0.005 acres of Yuma Ridgway’s rail and California black rail habitat. The project is expected to result in incidental take of Yuma Ridgway’s rail, California black rail, razorback sucker, and bonytail chub, which are designated as threatened species (Yuma Ridgway’s rail and California black rail) or endangered species (razorback sucker and bonytail chub) under the California Endangered Species Act (CESA), and three species are fully-protected pursuant to Fish and Game Code section 3511, subdivision (b) (Yuma Ridgway’s rail and California black rail) and Fish and Game Code section 5515, subdivision (b) (razorback sucker). Sections 3511 and 5515 of the Fish and Game Code prohibit the take of fully protected species. However, for qualifying projects, CDFW may authorize the take of any such species by permit pursuant to the conditions set forth in Fish and Game Code section 2081.15, subdivisions (a), (b), (c), and (d). The ITP referenced above as issued by CDFW, pursuant to Fish and Game Code section 2081.15, authorizes incidental take of Yuma Ridgway’s rail, California black rail, razorback sucker, and bonytail chub that may occur as a result of Project implementation.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including SWPPP and quality control. Kiewit is specifically seeking qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Furthermore, Kiewit prioritizes bidders who can demonstrate an ability to maintain labor harmony on the project. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid through the Building Connected electronic system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 8 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
250218.01 Reconstruction of 84th Avenue and Riley Street Bike Path
Solicitation # 250218.01
The City of Zeeland is soliciting bids for the reconstruction of 84th Avenue and the Riley Street Bike Path in Ottawa County, Michigan. This project involves approximately 1,450 feet of street and drive reconstruction and 1,450 feet of a shared use path, including HMA paving and storm sewer improvements. Key work items include the installation of 5,800 square yards of 8-inch aggregate base, 540 feet of 18-inch sewer in stone trench, and 2,800 feet of modified concrete curb and gutter, along with manholes and catch basins. The engineer's estimate for the project is 1,111,000 dollars. Encrypted bids must be submitted via the Bid Express e-bidding system by 11 a.m. local time on Thursday, November 12, 2026. To be considered, bidders must be prequalified by the City of Zeeland and include a proposal guarantee in the form of a bid bond or certified check for five percent of the total bid. The contract will be awarded based on the summation of unit prices, and unbalanced or incomplete bids will be disqualified. The project is entirely funded by the City of Zeeland and must be completed by April 30, 2027, with liquidated damages of 1,000 dollars per calendar day for delays. The selected contractor must provide performance and lien bonds each totaling 100 percent of the contract value and file certification of Workmen's Compensation Insurance. Payments will be made monthly at 90 percent of the value of work performed, with the City retaining 10 percent until final acceptance, subject to a 5 percent cap for Public Agency Contracts under MI PA 524 of 1980. Inspection and materials testing will be managed by Moore & Bruggink, Inc., and the contractor is required to implement a quality control plan following Division 5 of the MDOT Standard Construction Specifications.
Moore & Bruggink, Inc

POSTED

about 9 hours ago

DEADLINE

in 1 day
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS