Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Commercial Dumpster/Waste Container Supply

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This subcontract opportunity with the Department of Defense, specifically the USACE Omaha District, involves the supply and delivery of commercial waste containers for prime contractors at the Tri-Lakes Project Office in Littleton, Colorado. The required dumpsters must feature standard heavy-duty lid latches to satisfy government operational requirements and must be delivered directly to the designated site. The project is designated as a total Small Business Set Aside under NAICS code 332323. Interested parties must submit their responses by September 4, 2026, following the posting date of August 27, 2026.

General Info

Small business subcontract for delivering heavy-duty waste containers to Littleton, Colorado by September 2026.

NAICS

332323 - Ornamental and Architectural Metal Work Manufacturing

Place of Performance

Littleton, CO, 80128, USA

Set-Aside

SBA

Documents

This scope was carved out of W9128F26QA090.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Tri-Lakes Chatfield Trash Removal Service

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies waste containers for prime contractors on USACE Omaha District projects in Littleton, CO. Delivers commercial dumpsters featuring standard heavy-duty lid latches to the Tri-Lakes Project Office to meet government operational requirements. Delivers the completed waste containers to the designated site.

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 541330
New
Federal
USACE Omaha District - $249M Unrestricted Sentinel Construction Management Services (CMS) MATOC
Solicitation # W9128F26RA124
The U.S. Army Corps of Engineers Omaha District is soliciting proposals for a $249 million Unrestricted Sentinel Construction Management Services (CMS) Multiple Award Task Order Contract (MATOC) under NAICS 541330. This Indefinite Delivery/Indefinite Quantity (IDIQ) contract intends to award four firm-fixed price Indefinite Delivery Contracts (IDCs) to support the U.S. Air Force. The scope of work involves construction management staff augmentation, quality assurance, and project surveillance across the Northwestern Division, covering 15 states including Washington, Oregon, Idaho, Nevada, Utah, Montana, Wyoming, Colorado, North Dakota, South Dakota, Nebraska, Kansas, Iowa, Missouri, Minnesota, and Wisconsin. The performance period consists of a base period from March 1, 2027, to March 2, 2032, with optional extensions extending the total duration to seven years and six months. Proposals will be evaluated based on best value using trade-off selection procedures, with primary focus on past performance, technical management, key personnel, and small business participation. Awardees must adhere to strict quality and safety standards, including EM 385-1-1 and ER 1180-1-6, and utilize the USACE Resident Management System (RMS) for daily reporting. Contractors are required to submit maximum binding hourly labor rates and manage payments through the Wide Area WorkFlow (WAWF) system. Following Amendment 0001, the proposal submission deadline has been extended to November 10, 2026, at 2:00 p.m. Central Time.
Engineering Services

POSTED

about 11 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2 project is a construction effort located at Big Bend, Lower Brule, South Dakota, managed by the USACE Omaha District. The project focuses on Reach 4 of the lake and involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and a 200-by-1,500-foot island in water up to three feet deep. Key deliverables include the installation of a riprap revetment to protect the island from ice and wave erosion, as well as planting cottonwood trees and other culturally significant vegetation. These efforts are designed to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland through earth moving, grading, bank shaping, and topsoil placement. This procurement is a 100 percent Small Business Set-Aside under NAICS code 237990, with an estimated construction cost between 10 million and 25 million dollars. The project has a period of performance of 550 days following the receipt of the Notice to Proceed. The government intends to award the contract via an Invitation for Bid, with submissions required through the PIEE Solicitation Module. Eligible bidders must maintain an active SAM registration and provide performance and payment bonds.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 541990
New
Federal
Vandenberg SFB Tank Inspection
Solicitation # W9128F27QA002
Solicitation W9128F27QA002 is a firm-fixed-price, non-personnel services contract set aside 100% for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS 541990. The project involves performing API 653 in-service inspections on Department of Defense fuel tanks, specifically Tank 1702, a welded steel vertical aboveground Jet A storage tank located at Vandenberg SFB, California. The scope of work includes the removal, disposal, and transfer of remaining fuel, tank cleaning, replacing wiper seals, and conducting a comprehensive aboveground storage tank inspection to identify mandatory and recommended repairs in compliance with API 650, API 653, UFC 3-460-01, and NFPA standards. The government will award the contract based on best value, evaluating technical capability, experience, and price. Key requirements include the provision of a certified API 653 inspector and a project manager, with deliverables consisting of draft and final inspection reports, non-destructive testing summaries, and engineering calculations. Proposals are limited to five pages and must be submitted electronically by November 13, 2026. Contractors must adhere to strict military installation security requirements, including identity proofing and vetting for base access, and comply with DFARS cybersecurity and safeguarding regulations.
All Other Professional, Scientific, and Technical Services

POSTED

1 day ago

DEADLINE

in 17 days
View Details
NAICS: 237120
New
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total Small Business Set-Aside. The scope of work involves comprehensive repairs and upgrades to the AVGAS fueling system, including the installation of a sampling gauge hatch, a mechanical gauge, and an automatic tank gauge system. Physical improvements include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additional requirements include repairing the remote containment basin drainage, replacing asphalt and concrete pavement in multiple areas, relocating a generator with a new concrete pad, and the demolition and replacement of the POL operation building. The project will be awarded using the Lowest Price Technically Acceptable (LPTA) method, with technical evaluations focusing on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict quality control standards, including a three-phase control process and final acceptance through punch-out, pre-final, and final inspections. Required deliverables include as-built drawings, and the contractor must provide performance and payment bonds within 10 days of award. Optional CLINs are included for the remediation of petroleum-contaminated soil, lead-based paint, and asbestos-containing materials.
Oil and Gas Pipeline and Related Structures Construction

POSTED

4 days ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS