Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Washington was posted on July 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Commercial Fishing Homeport, City of Gig Harbor, WA #CIP-2204

Closed
CIP-2204State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and comprehensive revetment repairs involving clearing, grubbing, stone rework, and vegetation removal. The estimated contract value ranges between 1,000,000 and 5,000,000 dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone Small Businesses, who are eligible for a 10 percent price evaluation preference. Bidders must submit sealed physical bids by September 30, 2026, as electronic submissions are not permitted. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. The contract stipulates liquidated damages of 2,297 dollars per calendar day of delay and requires a third-party qualified surveyor for pre- and post-dredge multi-beam hydrographic surveys to verify final quantities.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 17 days
NAICS: 237990
New
Federal
Station Umpqua River Floating Dock Repair
Solicitation # 70Z03326QSEAT0015
The Department of Homeland Security, through the U.S. Coast Guard Base Seattle, is soliciting bids for a firm-fixed-price contract to repair the floating pier at Station Umpqua River in Winchester Bay, Oregon. The project involves providing all personnel, equipment, and tools to remove deteriorated wooden whalers and hardware and install three layers of 4 by 12 inch wooden whalers, through rods, roller hoops, and an egress ladder, while reinstalling ten existing cleats. The estimated period of performance is from September 21, 2026, to October 22, 2026, with a required completion date of October 14, 2026. This is a total small business set-aside under NAICS code 237990. A mandatory site visit is scheduled for August 27, 2026, at 10:00 AM, and interested offerors must submit their attendee lists by August 26, 2026. Proposals are due by September 14, 2026, at 3:00 PM PST and must be submitted via email to the contracting officer. Submissions are limited to six pages and must include a completed SF 1442, a detailed price breakdown covering mobilization, materials, and labor, and a technical proposal detailing the approach and project schedule. Evaluation will be based on technical capability, past performance, and price, with technical capability being the most significant factor. Awardees must be registered in the System for Award Management and comply with Davis-Bacon Act wage determinations for Douglas County, Oregon.
Base SEATTLE(00033)

POSTED

1 day ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The City of Gig Harbor, Washington is soliciting bids for the construction of a new gangway and float system with associated utilities at its Commercial Fishing Homeport, identified as Project CIP-2204. The scope includes all labor, materials, tools, equipment, supervision, and subcontractor coordination necessary to complete the project in full compliance with the contract drawings and specifications, including any additional miscellaneous elements required for final completion. The Contractor must be prepared to mobilize and manage multiple field crews simultaneously to meet project demands and deliver the work within 300 working days. All work must be performed in accordance with the Contract Documents and at the designated place of performance in Gig Harbor, WA 98335. The solicitation was posted on July 30, 2026, with responses due by 6:00 PM on July 28, 2026, and is managed by Stephanie Seibel, Project Manager, reachable at 253-853-7626 or sseibel@gigharborwa.gov. There is no specified set-aside classification or NAICS code provided, and the project is administered directly by the local government agency. Bidders must ensure full compliance with all contractual requirements, including timing, quality, and coordination, as outlined in the official Contract Documents accessible via the provided online link.

General Info

Gig Harbor to build gangway and float system at Commercial Fishing Homeport within 300 days.

Agency

Washington → City of Gig HarborView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Gig Harbor, WA, 98335, USA

Set-Aside

NONE

Documents

(803)

Specs - Page 604.jpg

JPG

Specs - Page 202.jpg

JPG

Specs - Page 500.jpg

JPG

Specs - Page 195.jpg

JPG

Specs - Page 67.jpg

JPG

Specs - Page 122.jpg

JPG

Specs - Page 51.jpg

JPG

Specs - Page 135.jpg

JPG

Specs - Page 459.jpg

JPG

Specs - Page 113.jpg

JPG

Specs - Page 386.jpg

JPG

Specs - Page 329.jpg

JPG

Specs - Page 292.jpg

JPG

Specs - Page 24.jpg

JPG

Addendum #2 - Revised - Page 2.jpg

JPG

Specs - Page 112.jpg

JPG

Specs - Page 141.jpg

JPG

Specs - Page 504.jpg

JPG

Specs - Page 646.jpg

JPG

Addendum #1 - Page 2.jpg

JPG

Addendum #2 - Revised - Page 32.jpg

JPG

Specs - Page 408.jpg

JPG

Specs - Page 228.jpg

JPG

Specs - Page 414.jpg

JPG

Specs - Page 330.jpg

JPG

Specs - Page 392.jpg

JPG

Specs - Page 648.jpg

JPG

Specs - Page 60.jpg

JPG

Specs - Page 14.jpg

JPG

Specs - Page 338.jpg

JPG

Specs - Page 200.jpg

JPG

Specs - Page 434.jpg

JPG

Specs - Page 637.jpg

JPG

Specs - Page 678.jpg

JPG

Specs - Page 78.jpg

JPG

Specs - Page 503.jpg

JPG

Specs - Page 390.jpg

JPG

Specs - Page 662.jpg

JPG

Specs - Page 649.jpg

JPG

Specs - Page 55.jpg

JPG

Addendum #4 - Page 7.jpg

JPG

Specs - Page 539.jpg

JPG

Specs - Page 664.jpg

JPG

Plans - Page 32.jpg

JPG

Specs - Page 76.jpg

JPG

Plans - Page 10.jpg

JPG

Specs - Page 93.jpg

JPG

Specs - Page 619.jpg

JPG

Specs - Page 642.jpg

JPG

Specs - Page 377.jpg

JPG

Specs - Page 507.jpg

JPG

Specs - Page 241.jpg

JPG

Specs - Page 491.jpg

JPG

Specs - Page 132.jpg

JPG

Specs - Page 268.jpg

JPG

Specs - Page 517.jpg

JPG

Addendum #1 - Page 4.jpg

JPG

Specs - Page 17.jpg

JPG

Specs - Page 276.jpg

JPG

Specs - Page 319.jpg

JPG

Specs - Page 44.jpg

JPG

Specs - Page 513.jpg

JPG

Addendum #2 - Revised - Page 22.jpg

JPG

Specs - Page 466.jpg

JPG

Specs - Page 310.jpg

JPG

Specs - Page 83.jpg

JPG

Specs - Page 407.jpg

JPG

Specs - Page 236.jpg

JPG

Addendum #2 - Revised - Page 29.jpg

JPG

Specs - Page 578.jpg

JPG

Specs - Page 479.jpg

JPG

Specs - Page 208.jpg

JPG

Specs - Page 566.jpg

JPG

Addendum #2 - Revised - Page 11.jpg

JPG

Specs - Page 210.jpg

JPG

Addendum #2 - Revised - Page 45.jpg

JPG

Specs - Page 84.jpg

JPG

Specs - Page 225.jpg

JPG

Specs - Page 431.jpg

JPG

Specs - Page 271.jpg

JPG

Specs - Page 293.jpg

JPG

Specs - Page 433.jpg

JPG

Specs - Page 64.jpg

JPG

Specs - Page 650.jpg

JPG

Specs - Page 540.jpg

JPG

Specs - Page 560.jpg

JPG

Specs - Page 493.jpg

JPG

Specs - Page 625.jpg

JPG

Specs - Page 659.jpg

JPG

Specs - Page 397.jpg

JPG

Specs - Page 404.jpg

JPG

Plans - Page 21.jpg

JPG

Specs - Page 451.jpg

JPG

Addendum #4 - Page 12.jpg

JPG

Specs - Page 77.jpg

JPG

Specs - Page 409.jpg

JPG

Specs - Page 352.jpg

JPG

Specs - Page 254.jpg

JPG

Specs - Page 611.jpg

JPG

Specs - Page 255.jpg

JPG

Specs - Page 232.jpg

JPG

Specs - Page 635.jpg

JPG

Specs - Page 118.jpg

JPG

Specs - Page 23.jpg

JPG

Specs - Page 7.jpg

JPG

Specs - Page 561.jpg

JPG

Specs - Page 438.jpg

JPG

Specs - Page 72.jpg

JPG

Plans - Page 27.jpg

JPG

Specs - Page 418.jpg

JPG

Specs - Page 32.jpg

JPG

Specs - Page 70.jpg

JPG

Specs - Page 605.jpg

JPG

Specs - Page 367.jpg

JPG

Specs - Page 120.jpg

JPG

Specs - Page 235.jpg

JPG

Specs - Page 544.jpg

JPG

Specs - Page 343.jpg

JPG

Specs - Page 378.jpg

JPG

Specs - Page 644.jpg

JPG

Plans - Page 36.jpg

JPG

Specs - Page 295.jpg

JPG

Specs - Page 124.jpg

JPG

Specs - Page 444.jpg

JPG

Specs - Page 327.jpg

JPG

Specs - Page 169.jpg

JPG

Specs - Page 346.jpg

JPG

Specs - Page 204.jpg

JPG

Specs - Page 340.jpg

JPG

Specs - Page 461.jpg

JPG

Specs - Page 177.jpg

JPG

Specs - Page 150.jpg

JPG

Specs - Page 52.jpg

JPG

Specs - Page 283.jpg

JPG

Specs - Page 307.jpg

JPG

Specs - Page 285.jpg

JPG

Specs - Page 372.jpg

JPG

Specs - Page 643.jpg

JPG

Specs - Page 462.jpg

JPG

Specs - Page 212.jpg

JPG

Specs - Page 370.jpg

JPG

Plans - Page 6.jpg

JPG

Specs - Page 98.jpg

JPG

Specs - Page 463.jpg

JPG

Specs - Page 512.jpg

JPG

Specs - Page 110.jpg

JPG

Specs - Page 622.jpg

JPG

Specs - Page 261.jpg

JPG

Plans - Page 1.jpg

JPG

Specs - Page 320.jpg

JPG

Specs - Page 160.jpg

JPG

Specs - Page 632.jpg

JPG

Specs - Page 573.jpg

JPG

Specs - Page 308.jpg

JPG

Specs - Page 594.jpg

JPG

Specs - Page 140.jpg

JPG

Specs - Page 376.jpg

JPG

Specs - Page 26.jpg

JPG

Specs - Page 670.jpg

JPG

Specs - Page 121.jpg

JPG

Specs - Page 250.jpg

JPG

Plans - Page 3.jpg

JPG

Specs - Page 16.jpg

JPG

Plans - Page 15.jpg

JPG

Specs - Page 411.jpg

JPG

Specs - Page 456.jpg

JPG

Specs - Page 675.jpg

JPG

Specs - Page 652.jpg

JPG

Plans - Page 38.jpg

JPG

Specs - Page 515.jpg

JPG

Plans - Page 18.jpg

JPG

Specs - Page 97.jpg

JPG

Addendum #2 - Revised - Page 41.jpg

JPG

Specs - Page 265.jpg

JPG

Specs - Page 207.jpg

JPG

Specs - Page 587.jpg

JPG

Specs - Page 303.jpg

JPG

Specs - Page 263.jpg

JPG

Addendum #2 - Revised - Page 8.jpg

JPG

Specs - Page 336.jpg

JPG

Specs - Page 563.jpg

JPG

Specs - Page 383.jpg

JPG

Specs - Page 220.jpg

JPG

Specs - Page 423.jpg

JPG

Specs - Page 173.jpg

JPG

Specs - Page 586.jpg

JPG

Specs - Page 229.jpg

JPG

Specs - Page 71.jpg

JPG

Specs - Page 501.jpg

JPG

Specs - Page 156.jpg

JPG

Plans - Page 33.jpg

JPG

Addendum #1 - Page 1.jpg

JPG

Specs - Page 402.jpg

JPG

Specs - Page 421.jpg

JPG

Specs - Page 189.jpg

JPG

Specs - Page 419.jpg

JPG

Specs - Page 188.jpg

JPG

Addendum #3 - Page 3.jpg

JPG

Specs - Page 428.jpg

JPG

Specs - Page 571.jpg

JPG

Specs - Page 351.jpg

JPG

Addendum #4 - Page 1.jpg

JPG

Specs - Page 536.jpg

JPG

Specs - Page 575.jpg

JPG

Specs - Page 676.jpg

JPG

Specs - Page 412.jpg

JPG

Specs - Page 348.jpg

JPG

Specs - Page 193.jpg

JPG

Specs - Page 474.jpg

JPG

Specs - Page 332.jpg

JPG

Specs - Page 313.jpg

JPG

Specs - Page 365.jpg

JPG

Specs - Page 658.jpg

JPG

Addendum #3 - Page 5.jpg

JPG

Specs - Page 509.jpg

JPG

Plans - Page 19.jpg

JPG

Specs - Page 106.jpg

JPG

Addendum #2 - Revised - Page 44.jpg

JPG

Specs - Page 318.jpg

JPG

Specs - Page 535.jpg

JPG

Plans - Page 9.jpg

JPG

Specs - Page 606.jpg

JPG

Specs - Page 631.jpg

JPG

Specs - Page 104.jpg

JPG

Specs - Page 35.jpg

JPG

Addendum #2 - Revised - Page 23.jpg

JPG

Specs - Page 174.jpg

JPG

Specs - Page 42.jpg

JPG

Specs - Page 206.jpg

JPG

Specs - Page 677.jpg

JPG

Specs - Page 323.jpg

JPG

Addendum #2 - Revised - Page 1.jpg

JPG

Specs - Page 211.jpg

JPG

Specs - Page 363.jpg

JPG

Addendum #2 - Revised - Page 25.jpg

JPG

Addendum #2 - Revised - Page 12.jpg

JPG

Specs - Page 119.jpg

JPG

Specs - Page 3.jpg

JPG

Specs - Page 151.jpg

JPG

Specs - Page 448.jpg

JPG

Specs - Page 552.jpg

JPG

Specs - Page 596.jpg

JPG

Specs - Page 657.jpg

JPG

Specs - Page 88.jpg

JPG

Specs - Page 248.jpg

JPG

Specs - Page 394.jpg

JPG

Specs - Page 645.jpg

JPG

Specs - Page 48.jpg

JPG

Specs - Page 312.jpg

JPG

Addendum #4 - Page 3.jpg

JPG

Specs - Page 497.jpg

JPG

Specs - Page 475.jpg

JPG

Specs - Page 290.jpg

JPG

Specs - Page 182.jpg

JPG

Specs - Page 485.jpg

JPG

Specs - Page 54.jpg

JPG

Specs - Page 49.jpg

JPG

Specs - Page 152.jpg

JPG

Specs - Page 28.jpg

JPG

Specs - Page 63.jpg

JPG

Specs - Page 355.jpg

JPG

Specs - Page 267.jpg

JPG

Specs - Page 435.jpg

JPG

Specs - Page 1.jpg

JPG

Specs - Page 556.jpg

JPG

Specs - Page 680.jpg

JPG

Specs - Page 230.jpg

JPG

Specs - Page 284.jpg

JPG

Specs - Page 282.jpg

JPG

Specs - Page 272.jpg

JPG

Specs - Page 114.jpg

JPG

Specs - Page 519.jpg

JPG

Specs - Page 331.jpg

JPG

Specs - Page 440.jpg

JPG

Specs - Page 2.jpg

JPG

Specs - Page 671.jpg

JPG

Specs - Page 469.jpg

JPG

Specs - Page 100.jpg

JPG

Specs - Page 153.jpg

JPG

Specs - Page 478.jpg

JPG

Specs - Page 447.jpg

JPG

Specs - Page 460.jpg

JPG

Specs - Page 572.jpg

JPG

Specs - Page 297.jpg

JPG

Specs - Page 61.jpg

JPG

Specs - Page 13.jpg

JPG

Specs - Page 609.jpg

JPG

Specs - Page 607.jpg

JPG

Specs - Page 371.jpg

JPG

Specs - Page 629.jpg

JPG

Specs - Page 537.jpg

JPG

Addendum #3 Plans - Page 1.jpg

JPG

Specs - Page 492.jpg

JPG

Specs - Page 476.jpg

JPG

Specs - Page 487.jpg

JPG

Specs - Page 663.jpg

JPG

Specs - Page 534.jpg

JPG

Specs - Page 647.jpg

JPG

Specs - Page 665.jpg

JPG

Specs - Page 387.jpg

JPG

Addendum #4 - Page 8.jpg

JPG

Specs - Page 139.jpg

JPG

Specs - Page 155.jpg

JPG

Specs - Page 304.jpg

JPG

Addendum #4 - Page 16.jpg

JPG

Specs - Page 480.jpg

JPG

Specs - Page 184.jpg

JPG

Addendum #2 - Revised - Page 10.jpg

JPG

Specs - Page 257.jpg

JPG

Specs - Page 65.jpg

JPG

Specs - Page 274.jpg

JPG

Addendum #3 - Page 2.jpg

JPG

Specs - Page 247.jpg

JPG

Specs - Page 436.jpg

JPG

Addendum #3 - Page 1.jpg

JPG

Specs - Page 33.jpg

JPG

Specs - Page 396.jpg

JPG

Specs - Page 20.jpg

JPG

Specs - Page 618.jpg

JPG

Specs - Page 87.jpg

JPG

Specs - Page 233.jpg

JPG

Addendum #2 - Revised - Page 6.jpg

JPG

Specs - Page 559.jpg

JPG

Specs - Page 190.jpg

JPG

Specs - Page 603.jpg

JPG

Specs - Page 205.jpg

JPG

Plans - Page 14.jpg

JPG

Specs - Page 669.jpg

JPG

Specs - Page 553.jpg

JPG

Specs - Page 653.jpg

JPG

Specs - Page 584.jpg

JPG

Specs - Page 90.jpg

JPG

Addendum #2 - Revised - Page 24.jpg

JPG

Addendum #2 - Revised - Page 31.jpg

JPG

Addendum #2 - Revised - Page 34.jpg

JPG

Specs - Page 598.jpg

JPG

Specs - Page 38.jpg

JPG

Specs - Page 158.jpg

JPG

Specs - Page 31.jpg

JPG

Specs - Page 599.jpg

JPG

Specs - Page 147.jpg

JPG

Plans - Page 23.jpg

JPG

Specs - Page 66.jpg

JPG

Specs - Page 22.jpg

JPG

Specs - Page 468.jpg

JPG

Specs - Page 75.jpg

JPG

Specs - Page 516.jpg

JPG

Plans - Page 4.jpg

JPG

Addendum #2 - Revised - Page 30.jpg

JPG

Specs - Page 183.jpg

JPG

Specs - Page 557.jpg

JPG

Specs - Page 373.jpg

JPG

Specs - Page 197.jpg

JPG

Specs - Page 227.jpg

JPG

Specs - Page 450.jpg

JPG

Specs - Page 245.jpg

JPG

Specs - Page 12.jpg

JPG

Specs - Page 570.jpg

JPG

Addendum #2 - Revised - Page 17.jpg

JPG

Specs - Page 382.jpg

JPG

Specs - Page 315.jpg

JPG

Specs - Page 29.jpg

JPG

Addendum #4 - Page 10.jpg

JPG

Addendum #2 - Revised - Page 36.jpg

JPG

Specs - Page 109.jpg

JPG

Specs - Page 615.jpg

JPG

Specs - Page 137.jpg

JPG

Specs - Page 533.jpg

JPG

Specs - Page 406.jpg

JPG

Specs - Page 389.jpg

JPG

Specs - Page 380.jpg

JPG

Addendum #2 - Revised - Page 39.jpg

JPG

Specs - Page 30.jpg

JPG

Specs - Page 514.jpg

JPG

Specs - Page 260.jpg

JPG

Specs - Page 314.jpg

JPG

Specs - Page 350.jpg

JPG

Specs - Page 144.jpg

JPG

Addendum #3 - Page 4.jpg

JPG

Specs - Page 532.jpg

JPG

Specs - Page 242.jpg

JPG

Specs - Page 446.jpg

JPG

Specs - Page 445.jpg

JPG

Specs - Page 39.jpg

JPG

Specs - Page 166.jpg

JPG

Specs - Page 269.jpg

JPG

Specs - Page 455.jpg

JPG

Specs - Page 209.jpg

JPG

Specs - Page 526.jpg

JPG

Specs - Page 624.jpg

JPG

Addendum #4 - Page 15.jpg

JPG

Specs - Page 621.jpg

JPG

Specs - Page 145.jpg

JPG

Specs - Page 47.jpg

JPG

Specs - Page 630.jpg

JPG

Specs - Page 660.jpg

JPG

Plans - Page 34.jpg

JPG

Specs - Page 565.jpg

JPG

Specs - Page 18.jpg

JPG

Specs - Page 610.jpg

JPG

Addendum #4 - Page 14.jpg

JPG

Plans - Page 2.jpg

JPG

Specs - Page 593.jpg

JPG

Specs - Page 634.jpg

JPG

Specs - Page 133.jpg

JPG

Specs - Page 613.jpg

JPG

Specs - Page 360.jpg

JPG

Specs - Page 251.jpg

JPG

Specs - Page 641.jpg

JPG

Specs - Page 525.jpg

JPG

Specs - Page 543.jpg

JPG

Specs - Page 82.jpg

JPG

Specs - Page 143.jpg

JPG

Specs - Page 550.jpg

JPG

Specs - Page 126.jpg

JPG

Specs - Page 393.jpg

JPG

Specs - Page 520.jpg

JPG

Addendum #3 Plans - Page 2.jpg

JPG

Specs - Page 216.jpg

JPG

Specs - Page 589.jpg

JPG

Specs - Page 554.jpg

JPG

Specs - Page 163.jpg

JPG

Specs - Page 74.jpg

JPG

Specs - Page 41.jpg

JPG

Specs - Page 628.jpg

JPG

Specs - Page 486.jpg

JPG

Specs - Page 555.jpg

JPG

Addendum #2 - Revised - Page 26.jpg

JPG

Specs - Page 317.jpg

JPG

Specs - Page 231.jpg

JPG

Specs - Page 222.jpg

JPG

Specs - Page 595.jpg

JPG

Plans - Page 7.jpg

JPG

Specs - Page 4.jpg

JPG

Specs - Page 579.jpg

JPG

Addendum #2 - Revised - Page 7.jpg

JPG

Plans - Page 13.jpg

JPG

Specs - Page 608.jpg

JPG

Specs - Page 170.jpg

JPG

Plans - Page 16.jpg

JPG

Specs - Page 639.jpg

JPG

Specs - Page 278.jpg

JPG

Specs - Page 354.jpg

JPG

Specs - Page 353.jpg

JPG

Specs - Page 196.jpg

JPG

Specs - Page 164.jpg

JPG

Specs - Page 56.jpg

JPG

Specs - Page 53.jpg

JPG

Specs - Page 95.jpg

JPG

Specs - Page 362.jpg

JPG

Specs - Page 81.jpg

JPG

Specs - Page 375.jpg

JPG

Specs - Page 244.jpg

JPG

Addendum #3 Plans - Page 5.jpg

JPG

Specs - Page 123.jpg

JPG

Specs - Page 306.jpg

JPG

Specs - Page 316.jpg

JPG

Addendum #4 - Page 17.jpg

JPG

Specs - Page 588.jpg

JPG

Specs - Page 243.jpg

JPG

Specs - Page 266.jpg

JPG

Addendum #4 - Page 18.jpg

JPG

Specs - Page 50.jpg

JPG

Addendum #4 - Page 2.jpg

JPG

Specs - Page 410.jpg

JPG

Specs - Page 452.jpg

JPG

Specs - Page 602.jpg

JPG

Specs - Page 626.jpg

JPG

Specs - Page 176.jpg

JPG

Specs - Page 105.jpg

JPG

Specs - Page 161.jpg

JPG

Specs - Page 505.jpg

JPG

Specs - Page 58.jpg

JPG

Specs - Page 453.jpg

JPG

Specs - Page 483.jpg

JPG

Specs - Page 600.jpg

JPG

Specs - Page 9.jpg

JPG

Specs - Page 577.jpg

JPG

Specs - Page 403.jpg

JPG

Specs - Page 398.jpg

JPG

Specs - Page 672.jpg

JPG

Specs - Page 508.jpg

JPG

Specs - Page 136.jpg

JPG

Specs - Page 499.jpg

JPG

Specs - Page 36.jpg

JPG

Specs - Page 471.jpg

JPG

Addendum #2 - Revised - Page 21.jpg

JPG

Specs - Page 157.jpg

JPG

Specs - Page 134.jpg

JPG

Specs - Page 633.jpg

JPG

Specs - Page 326.jpg

JPG

Specs - Page 138.jpg

JPG

Specs - Page 357.jpg

JPG

Addendum #3 Plans - Page 4.jpg

JPG

Specs - Page 148.jpg

JPG

Specs - Page 238.jpg

JPG

Specs - Page 581.jpg

JPG

Specs - Page 424.jpg

JPG

Specs - Page 439.jpg

JPG

Addendum #4 - Page 4.jpg

JPG

Addendum #3 Plans - Page 3.jpg

JPG

Specs - Page 562.jpg

JPG

Specs - Page 427.jpg

JPG

Specs - Page 548.jpg

JPG

Specs - Page 239.jpg

JPG

Specs - Page 590.jpg

JPG

Specs - Page 111.jpg

JPG

Specs - Page 395.jpg

JPG

Specs - Page 219.jpg

JPG

Specs - Page 498.jpg

JPG

Addendum #2 - Revised - Page 16.jpg

JPG

Specs - Page 162.jpg

JPG

Plans - Page 11.jpg

JPG

Specs - Page 234.jpg

JPG

Specs - Page 490.jpg

JPG

Specs - Page 96.jpg

JPG

Specs - Page 287.jpg

JPG

Specs - Page 321.jpg

JPG

Specs - Page 203.jpg

JPG

Specs - Page 422.jpg

JPG

Specs - Page 481.jpg

JPG

Specs - Page 361.jpg

JPG

Addendum #2 - Revised - Page 9.jpg

JPG

Specs - Page 425.jpg

JPG

Specs - Page 79.jpg

JPG

Plans - Page 35.jpg

JPG

Specs - Page 458.jpg

JPG

Plans - Page 29.jpg

JPG

Specs - Page 15.jpg

JPG

Addendum #2 - Revised - Page 15.jpg

JPG

Specs - Page 523.jpg

JPG

Addendum #4 - Page 9.jpg

JPG

Specs - Page 623.jpg

JPG

Specs - Page 569.jpg

JPG

Specs - Page 640.jpg

JPG

Specs - Page 179.jpg

JPG

Specs - Page 246.jpg

JPG

Specs - Page 288.jpg

JPG

Specs - Page 131.jpg

JPG

Addendum #4 - Page 5.jpg

JPG

Specs - Page 484.jpg

JPG

Specs - Page 349.jpg

JPG

Specs - Page 149.jpg

JPG

Specs - Page 527.jpg

JPG

Specs - Page 582.jpg

JPG

Specs - Page 379.jpg

JPG

Specs - Page 542.jpg

JPG

Specs - Page 358.jpg

JPG

Addendum #2 - Revised - Page 37.jpg

JPG

Specs - Page 437.jpg

JPG

Specs - Page 107.jpg

JPG

Specs - Page 129.jpg

JPG

Specs - Page 384.jpg

JPG

Specs - Page 127.jpg

JPG

Specs - Page 159.jpg

JPG

Specs - Page 524.jpg

JPG

Specs - Page 262.jpg

JPG

Specs - Page 226.jpg

JPG

Plans - Page 8.jpg

JPG

Specs - Page 531.jpg

JPG

Specs - Page 201.jpg

JPG

Specs - Page 413.jpg

JPG

Specs - Page 347.jpg

JPG

Specs - Page 275.jpg

JPG

Specs - Page 583.jpg

JPG

Plans - Page 24.jpg

JPG

Specs - Page 34.jpg

JPG

Specs - Page 85.jpg

JPG

Specs - Page 213.jpg

JPG

Specs - Page 374.jpg

JPG

Addendum #2 - Revised - Page 28.jpg

JPG

Specs - Page 674.jpg

JPG

Specs - Page 441.jpg

JPG

Specs - Page 256.jpg

JPG

Specs - Page 300.jpg

JPG

Specs - Page 673.jpg

JPG

Specs - Page 580.jpg

JPG

Specs - Page 180.jpg

JPG

Specs - Page 666.jpg

JPG

Specs - Page 325.jpg

JPG

Addendum #2 - Revised - Page 5.jpg

JPG

Addendum #2 - Revised - Page 4.jpg

JPG

Specs - Page 298.jpg

JPG

Specs - Page 142.jpg

JPG

Specs - Page 91.jpg

JPG

Specs - Page 627.jpg

JPG

Specs - Page 385.jpg

JPG

Specs - Page 322.jpg

JPG

Specs - Page 6.jpg

JPG

Specs - Page 521.jpg

JPG

Specs - Page 510.jpg

JPG

Specs - Page 237.jpg

JPG

Invitation to Bidders - Page 1.jpg

JPG

Specs - Page 341.jpg

JPG

Addendum #1 - Page 3.jpg

JPG

Specs - Page 89.jpg

JPG

Plans - Page 20.jpg

JPG

Addendum #2 - Revised - Page 40.jpg

JPG

Specs - Page 366.jpg

JPG

Specs - Page 364.jpg

JPG

Specs - Page 592.jpg

JPG

Specs - Page 324.jpg

JPG

Specs - Page 567.jpg

JPG

Specs - Page 391.jpg

JPG

Specs - Page 187.jpg

JPG

Specs - Page 426.jpg

JPG

Specs - Page 59.jpg

JPG

Plans - Page 22.jpg

JPG

Specs - Page 470.jpg

JPG

Addendum #2 - Revised - Page 43.jpg

JPG

Specs - Page 181.jpg

JPG

Specs - Page 482.jpg

JPG

Specs - Page 258.jpg

JPG

Specs - Page 186.jpg

JPG

Specs - Page 518.jpg

JPG

Specs - Page 429.jpg

JPG

Specs - Page 178.jpg

JPG

Specs - Page 280.jpg

JPG

Specs - Page 45.jpg

JPG

Specs - Page 277.jpg

JPG

Specs - Page 530.jpg

JPG

Specs - Page 253.jpg

JPG

Specs - Page 125.jpg

JPG

Specs - Page 585.jpg

JPG

Specs - Page 443.jpg

JPG

Specs - Page 94.jpg

JPG

Specs - Page 564.jpg

JPG

Specs - Page 5.jpg

JPG

Specs - Page 92.jpg

JPG

Specs - Page 457.jpg

JPG

Specs - Page 333.jpg

JPG

Specs - Page 8.jpg

JPG

Specs - Page 335.jpg

JPG

Specs - Page 264.jpg

JPG

Specs - Page 171.jpg

JPG

Specs - Page 165.jpg

JPG

Specs - Page 345.jpg

JPG

Specs - Page 400.jpg

JPG

Specs - Page 472.jpg

JPG

Specs - Page 344.jpg

JPG

Specs - Page 328.jpg

JPG

Specs - Page 612.jpg

JPG

Specs - Page 10.jpg

JPG

Specs - Page 416.jpg

JPG

Specs - Page 529.jpg

JPG

Specs - Page 43.jpg

JPG

Addendum #2 - Revised - Page 33.jpg

JPG

Specs - Page 221.jpg

JPG

Specs - Page 102.jpg

JPG

Specs - Page 568.jpg

JPG

Specs - Page 302.jpg

JPG

Invitation to Bidders - Page 2.jpg

JPG

Specs - Page 545.jpg

JPG

Specs - Page 467.jpg

JPG

Specs - Page 522.jpg

JPG

Specs - Page 616.jpg

JPG

Addendum #2 - Revised - Page 20.jpg

JPG

Addendum #3 Plans - Page 6.jpg

JPG

Specs - Page 40.jpg

JPG

Specs - Page 191.jpg

JPG

Specs - Page 270.jpg

JPG

Specs - Page 46.jpg

JPG

Specs - Page 334.jpg

JPG

Specs - Page 259.jpg

JPG

Specs - Page 661.jpg

JPG

Specs - Page 432.jpg

JPG

Specs - Page 103.jpg

JPG

Specs - Page 294.jpg

JPG

Specs - Page 194.jpg

JPG

Specs - Page 506.jpg

JPG

Specs - Page 442.jpg

JPG

Specs - Page 168.jpg

JPG

Specs - Page 249.jpg

JPG

Specs - Page 217.jpg

JPG

Addendum #2 - Revised - Page 13.jpg

JPG

Specs - Page 614.jpg

JPG

Specs - Page 73.jpg

JPG

Specs - Page 309.jpg

JPG

Addendum #2 - Revised - Page 27.jpg

JPG

Specs - Page 305.jpg

JPG

Plans - Page 37.jpg

JPG

Specs - Page 502.jpg

JPG

Specs - Page 401.jpg

JPG

Specs - Page 541.jpg

JPG

Specs - Page 101.jpg

JPG

Specs - Page 368.jpg

JPG

Specs - Page 574.jpg

JPG

Specs - Page 576.jpg

JPG

Specs - Page 342.jpg

JPG

Specs - Page 224.jpg

JPG

Specs - Page 80.jpg

JPG

Addendum #4 - Page 20.jpg

JPG

Specs - Page 667.jpg

JPG

Specs - Page 301.jpg

JPG

Specs - Page 146.jpg

JPG

Addendum #2 - Revised - Page 19.jpg

JPG

Specs - Page 546.jpg

JPG

Specs - Page 214.jpg

JPG

Specs - Page 289.jpg

JPG

Specs - Page 25.jpg

JPG

Specs - Page 223.jpg

JPG

Specs - Page 172.jpg

JPG

Specs - Page 218.jpg

JPG

Specs - Page 130.jpg

JPG

Specs - Page 359.jpg

JPG

Specs - Page 37.jpg

JPG

Specs - Page 656.jpg

JPG

Specs - Page 399.jpg

JPG

Specs - Page 405.jpg

JPG

Specs - Page 86.jpg

JPG

Addendum #4 - Page 6.jpg

JPG

Addendum #4 - Page 11.jpg

JPG

Specs - Page 417.jpg

JPG

Specs - Page 339.jpg

JPG

Specs - Page 57.jpg

JPG

Specs - Page 489.jpg

JPG

Plans - Page 25.jpg

JPG

Specs - Page 68.jpg

JPG

Specs - Page 115.jpg

JPG

Specs - Page 11.jpg

JPG

Specs - Page 473.jpg

JPG

Specs - Page 558.jpg

JPG

Addendum #2 - Revised - Page 38.jpg

JPG

Specs - Page 465.jpg

JPG

Specs - Page 116.jpg

JPG

Specs - Page 291.jpg

JPG

Specs - Page 175.jpg

JPG

Specs - Page 549.jpg

JPG

Addendum #2 - Revised - Page 3.jpg

JPG

Specs - Page 477.jpg

JPG

Specs - Page 296.jpg

JPG

Specs - Page 299.jpg

JPG

Specs - Page 636.jpg

JPG

Addendum #2 - Revised - Page 35.jpg

JPG

Specs - Page 449.jpg

JPG

Specs - Page 198.jpg

JPG

Plans - Page 5.jpg

JPG

Plans - Page 17.jpg

JPG

Specs - Page 69.jpg

JPG

Specs - Page 655.jpg

JPG

Specs - Page 496.jpg

JPG

Specs - Page 415.jpg

JPG

Specs - Page 199.jpg

JPG

Specs - Page 99.jpg

JPG

Addendum #2 - Revised - Page 42.jpg

JPG

Plans - Page 39.jpg

JPG

Specs - Page 279.jpg

JPG

Specs - Page 252.jpg

JPG

Specs - Page 21.jpg

JPG

Specs - Page 601.jpg

JPG

Addendum #2 - Revised - Page 14.jpg

JPG

Bid Tabulation - Page 1.jpg

JPG

Addendum #2 - Revised - Page 18.jpg

JPG

Specs - Page 62.jpg

JPG

Specs - Page 538.jpg

JPG

Specs - Page 617.jpg

JPG

Specs - Page 494.jpg

JPG

Specs - Page 281.jpg

JPG

Specs - Page 651.jpg

JPG

Addendum #4 - Page 13.jpg

JPG

Specs - Page 337.jpg

JPG

Specs - Page 167.jpg

JPG

Plans - Page 26.jpg

JPG

Specs - Page 488.jpg

JPG

Specs - Page 591.jpg

JPG

Specs - Page 273.jpg

JPG

Specs - Page 154.jpg

JPG

Specs - Page 108.jpg

JPG

Specs - Page 286.jpg

JPG

Specs - Page 454.jpg

JPG

Specs - Page 240.jpg

JPG

Specs - Page 620.jpg

JPG

Specs - Page 464.jpg

JPG

Specs - Page 528.jpg

JPG

Specs - Page 420.jpg

JPG

Plans - Page 12.jpg

JPG

Addendum #4 - Page 19.jpg

JPG

Plans - Page 31.jpg

JPG

Plans - Page 28.jpg

JPG

Specs - Page 679.jpg

JPG

Specs - Page 430.jpg

JPG

Specs - Page 311.jpg

JPG

Specs - Page 668.jpg

JPG

Specs - Page 511.jpg

JPG

Addendum #3 Plans - Page 7.jpg

JPG

Specs - Page 551.jpg

JPG

Specs - Page 27.jpg

JPG

Specs - Page 495.jpg

JPG

Specs - Page 215.jpg

JPG

Specs - Page 654.jpg

JPG

Specs - Page 128.jpg

JPG

Specs - Page 388.jpg

JPG

Specs - Page 356.jpg

JPG

Specs - Page 547.jpg

JPG

Specs - Page 369.jpg

JPG

Specs - Page 19.jpg

JPG

Plans - Page 30.jpg

JPG

Specs - Page 638.jpg

JPG

Specs - Page 597.jpg

JPG

Specs - Page 185.jpg

JPG

Specs - Page 381.jpg

JPG

Specs - Page 117.jpg

JPG

Specs - Page 192.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Gig Harbor
Contacts1 person available
OfficeN/A
Organization / Agency
Washington → City of Gig Harbor
View Agency Profile
Office AddressN/A
Contacts
Stephanie Seibel Project Manager

Interested Companies (28)

Show more
Orion Marine Contractors
Federal Way, WA
Manson Construction
Seattle, WA
Transportation Systems
Sumner, WA

See All 28 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Constructing a new gangway and float system with utilities as shown in the Contract Drawings, and any other miscellaneous elements required to complete the Work as shown in the Contract Documents. The project shall include all other Work and shall be constructed in accordance with the applicable Drawings and Specifications, as described in the Contract Documents. Furnishing all labor, tools, equipment, materials, incidentals, superintendents, subcontractor coordination and overhead to construct the project. The Contractor will be expected to field multiple crews simultaneously, if required to perform the work. Three hundred (300) working days are allotted for this construction.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS