Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Commercial Overhead and Walk-through Door Contractor

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract agreement involves the supply and installation of commercial doors for projects managed by prime contractors for Smith County Emergency Services District No. 2. The scope of work specifically requires the installation of five 14'x14' black electric overhead doors equipped with openers, as well as eight black 6-panel 36"x80" commercial metal walk-through doors. The contractor is responsible for ensuring all units are weather-sealed and fully operational upon delivery. All associated electrical work must strictly adhere to local building codes. This opportunity is categorized under NAICS code 238990 and is managed through the Texas Support Services Facilities division. Interested parties must submit their responses by the deadline of December 10, 2026.

General Info

Supply and install commercial overhead and walk-through doors for Smith County ESD 2.

Documents

This scope was carved out of 2026-RFP-252.

The full solicitation package (9 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Provide and Construct One (1) 40' Wide x 60' Long x 18' Tall Tube Steel Building and/or One (1) 60' Wide x 60' Long x 18' Tall Tube Steel Building on Existing Concrete Slab(s).

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Support Services > Facilities
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs electric overhead and commercial metal walk-through doors for prime contractors on Smith County Emergency Services District No. 2 projects. Installs five 14'x14' black overhead doors with electric openers and eight black 6-panel 36"x80" commercial metal walk-through doors. All electrical work must meet local building codes. Delivers fully operational, weather-sealed doors.

Similar Contracts

Same NAICS industry code

More opportunities from Texas → Support Services > Facilities

Same awarding agency

NAICS: 238110
New
SLED
Grade for and construct a concrete slab(s), driveway(s), and parking lot(s) and prep for modular home(s) and tube steel building(s)
Solicitation # 2026-RFP-250
Smith County Emergency Services District No. 2 is soliciting proposals under solicitation 2026-RFP-250 for the grading and construction of concrete slabs, driveways, and parking lots at two new fire stations: Dixie Station 71 and Winona Station 26. The scope of work focuses on creating permanent infrastructure for emergency apparatus access, personnel parking, and visitor parking, as well as providing the concrete foundations necessary for temporary apparatus bays and modular living quarters. While the foundations are included in this RFP, the actual procurement and installation of the modular homes and bays will be handled through separate solicitations. The District will use a weighted scoring system to determine the best value, with 15% of the total score based on the construction timeline and 5% based on references. Proposals must be submitted via the District's electronic procurement portal by December 10, 2026. Contractors are required to maintain Workman's Compensation Insurance and must provide Performance and Labor and Materials Payment Bonds for 100% of the proposal amount if the total exceeds $25,000.00. All work must adhere to strict quality-control and quality-assurance standards, with specific requirements for material packaging, weatherproofing, and ADA-compliant parking markings. Administrative requirements include the use of AIA Documents G702 and G703 for invoicing, with final payments requiring additional affidavits and surety consents. Vendors must provide several certifications via a Vendor Questionnaire, including E-Verify compliance, non-boycott of Israel and energy companies, and verification that no former District executives have an interest in the contract. Performance schedules must be detailed, with a maximum activity duration of 20 days and a minimum of 15 days allocated for startup and testing.
Poured Concrete Foundation and Structure Contractors

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS