Comprehensive Everglades Restoration Plan, Broward County Water Preserve Areas, Contract 2, C-11 Impoundment and Mitigation Area A, Broward County, Florida

Closed
W912EP25Z0012Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 8 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 8 hours ago

DEADLINE

in 25 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Weston, FL, USA

Set-Aside

NONE

Documents

57

01_DRAFT_CNT2_Plans_1General_Part2

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_1General_Part4 - General Sheet Notes

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_1General_Part5

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_1General_Part6 - Conceptual Drainage Opening Slurry Wall Treatment

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_2Survey_Part1 - Survey Symbols and Reference Notes

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_2Survey_Part2 - Boundary Survey Plans

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_2Survey_Part3 - Boundary Survey Plan

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_2Survey_Part5 - Topgraphic Survey Plan

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_3Geotech_Part1 - Muck Probe Location Plan

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_3Geotech_Part5 - Core Boring Location Table

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_4Civil_Part10 - Borrow Area Plan

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_4Civil_Part13 - Native Species Planting Plan

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_4Civil_Part15 - General Notes and Slurry Wall Summary

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_4Civil_Part17

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_4Civil_Part18 - General Notes

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_4Civil_Part2

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_4Civil_Part23 - L-S14 Levee Plan

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_4Civil_Part28

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_4Civil_Part29 - Surveillance and Monitoring Plan

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_4Civil_Part32

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_4Civil_Part33

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_4Civil_Part7 - Construction Plans

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_4Civil_Part8 - Civil Engineering Plans

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_4Civil_Part9 - Site Facilities and Borrow Area Plans

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_5Structural

PDF, High priority: read this firstspecifications
High

01_DRAFT_CNT2_Plans_6Mechanical

PDF, High priority: read this firstspecifications
High

A-506A Gated Culvert Electrical Specification Plan

PDF, High priority: read this firstspecifications
High

C-11 Impoundment Plan and Profile - Civil Plans

PDF, High priority: read this firstspecifications
High

C-11 Surveillance and Monitoring Program - Instrumentation Table

PDF, High priority: read this firstspecifications
High

CERP Contract 2 C-11 Impoundment and Mitigation Area A - Technical Specifications MOD003

PDF, High priority: read this firstspecifications
High

CF0019 - D-511 Embankment Plans

PDF, High priority: read this firstspecifications
High

CF0020 - D-511 Embankment Plans

PDF, High priority: read this firstspecifications
High

Contract 2 MOD003 - Instrumentation Plans (S506A)

PDF, High priority: read this firstspecifications
High

Contract C-11 Canal MI-1 Construction Report Rev A

PDF, High priority: read this firstspecifications
High

Contract CF0032 - Plans 4Civil Part 27

PDF, High priority: read this firstspecifications
High

Contract PNA - Plans 2Survey Part 6

PDF, High priority: read this firstspecifications
High

Core Boring Location Plan - 01_DRAFT_CNT2_Plans_3Geotech_Part4

PDF, High priority: read this firstspecifications
High

D-511 Embankment Plans (STA 145+00 to 238+00)

PDF, High priority: read this firstspecifications
High

L-512 and L-514 Levee Plans

PDF, High priority: read this firstspecifications
High

L-512 Levee Plan and Profile (STA 680+00 to 700+00)

PDF, High priority: read this firstspecifications
High

Mitigation Area A - Invasive Plant Species Management Plan (CE0001)

PDF, High priority: read this firstspecifications
High

Mitigation Area A - Native Species Planting Plan

PDF, High priority: read this firstspecifications
High

Topographic Survey Plan - Griffin Road (V-0004)

PDF, High priority: read this firstspecifications
High

USACE Construction Plans - Geotechnical Part 3

PDF, High priority: read this firstspecifications
High

US Army Corps of Engineers Hand Auger Location Plan (A1)

PDF, High priority: read this firstspecifications
High

W912EP24R0003 - CERP Broward County Water Preserve Areas Project

PDF, High priority: read this firstspecifications
High

W912EP24R0003 - CERP Broward County Water Preserve Areas Project, Contract 2

PDF, High priority: read this firstspecifications
High

W912EP24R0003 - Contract 2 Surveillance and Monitoring Plan

PDF, High priority: read this first2 pages · specifications
High

W912EP24R0003 - General Civil Notes (C-0001)

PDF, High priority: read this first1 page · specifications
High

ZM00003 - Civil Plans

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

special-notice

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
Contacts2 people available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA

Full Description

Show more
COMPREHENSIVE EVERGLADES RESTORATION PLAN, BROWARD COUNTY WATER PRESERVE AREAS, CONTRACT 2, C-11 IMPOUNDMENT AND MITIGATION AREA A, BROWARD COUNTY, FLORIDA THE PROVIDED DOCUMENTATION IS PUBLISHED FOR INFORMATIONAL PURPOSES ONLY. THIS IS NOT A SOLICITATION REQUEST FOR A PROPOSAL OR BID. BE ADVISED. This notice provides DRAFT documentation for Plans and Specifications pertaining to a future procurement for the COMPREHENSIVE EVERGLADES RESTORATION PLAN, BROWARD COUNTY WATER PRESERVE AREAS, CONTRACT 2, C-11 IMPOUNDMENT AND MITIGATION AREA A, BROWARD COUNTY, FLORIDA project. The DRAFT documents are provided for INFORMATIONAL PURPOSES ONLY. All documents released as part of this notice are deemed DRAFT for purposes of the aforementioned future procurement. Only versions of the Plans and Specifications provided with the release of an ACTUAL SOLICITATION (and amendments thereof) shall be utilized by the Government for source selection purposes. Be advised that not all documents released as part of this notice are marked as DRAFT: It is the responsibility of interested parties to refer to versions of the Plans and Specifications released as part of an ACTUAL SOLICITATION when submitting bids or proposals on the future procurement. The Government may consider comments and inquiries while preparing the final plans and specifications. The Government reserves the right not to incorporate comments or any suggested changes. The following is a description of the upcoming procurement: The Broward County Water Preserve Area (BCWPA), Contract 2 project consists of a portion of the overall C-11 Impoundment project. Contract 2 consists of construction of dam and levee embankment, a mitigation area, water control structures, environmentally sensitive area (ESA) systems, lake backfill, drainage conveyance, ancillary features, and associated clearing, grubbing, planting, borrow, and material processing. Contract 2 is the second of three construction phases (combined with an initial land clearing Contract 2.1 and future Contract 3) to complete the overall C-11 Impoundment component of the BCWPA project. The overall completed C-11 Impoundment will be an above-ground earthen reservoir targeted to have a total storage of 4,600 acre-feet with an effective interior area of approximately 1,053 acres and a normal pool water storage depth of approximately 4.7 ft. The Contract 2 dam embankment (D-511) will have an approximate height of 15ft (crest elevation of 18.8 ft NAVD88). The Contract 2 portion of D-511 embankment will include roughly 4,800 ft of slurry wall along the southern alignments between stations 111+00 to 146+00 (east) and stations 204+00 to 218+00 (west). The slurry wall will be 41 ft tall (EL 6.0 ft NAVD88 to EL -35.0 ft NAVD) with a typical width of 2.5 ft. The proposed Mitigation Area - A, is located north of the impoundment. It will 113 acres of wetland marsh. Water levels within the mitigation area will fluctuate approximately 1.0 ft above average ground elevation (5.3 ft NAVD88). The levees surrounding the mitigation area will have an approximate height of 3 ft (crest elevation of 7.3 ft NAVD88). Contract 2 includes 12 total Water Control Structures: - Gated Culverts S-506A, S-508B, S-508D, and S-511 - Ungated Culverts S-500A, S-505E, S-506B, S-508A, and S-509 - Fixed, Broad-crested Weirs S-505B, S-505C, and S-505F There are two environmentally sensitive areas (ESAs) which are to be protected during construction and ultimately excluded from the project by means of embankment alignment. The ESAs will be protected from disturbance during construction and will be avoided by completed project features. Contact 2 includes a requirement to backfill the existing Central Lake and an existing borrow area. These features are existing quarry pits estimated to be up to 55 feet deep and filled with water. Backfill of the Central Lake and Borrow Area will primarily consist of onsite muck material. However, the Contractor will be provided approximately 10,800 cubic yards of stockpiled limerock aggregate, located adjacent to SW 26th Street and the proposed construction staging area, which is approved to be placed in Central Lake. Contract 2 will require continuous stormwater management and conveyance of an approximate two square-mile drainage area north of the project site, which flows southward through the project site, plus any stormwater generated within the Contract 2 limits for the duration of the contract. Since stormwater flows will ultimately need to pass south through the future Contract 3 project limits for discharge into the C-11 Canal, stormwater management will include the following control requirements: - Stormwater system will convey a 100-year storm to the existing A/5 Canal outfall at the C-11 Canal. - Contractor will construct a temporary shallow drainage diversion ditch from the eastern C-511 Canal to the existing A/5 canal. The diversion ditch will be located along the boundary between the Contract 2 and Contract 3, in a zone of temporary construction limit for future resumption by others. - Contractor must not construct S-505F broad-crested weir until the eastern section of C-511 and the temporary diversion ditch to the existing A/5 canal are complete. Other project features and activities include clearing, grubbing, planting, borrow, material processing, boat ramps, soil cement embankment armoring, emergency stockpiles, instrumentation and monitoring stations, wetland preservation/protection, erosion control, and debris disposal. In preparation for the formal solicitation, please see the draft plans and specifications attached. Interested parties are highly encouraged to review the Draft documents and submit any questions via ProjNet. Technical inquiries and questions relating to this DRAFT plans and specification are to be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org) No Later Than (NLT) 14 March 2025 at 5:00PM, EST. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team. Any questions not directly addressed by 14 March will be addressed during advertisement. All timely questions and approved answers will be made available through ProjNet. The Project ID Number is: (SAJ305) CERP Broward County Water Preserve Areas (BCWPA) (BCWPA C-11 CNT2 Impoundment and Mitigation Area A) The Bidder Inquiry Key is: P437TE-HNNN86 Specific Instructions for ProjNet Bid Inquiry Access from ProjNet home page: 1. Identify the Agency. This should be marked as USACE. 2. Email. Enter the email address you would like to use for communication. 3. Key. Enter the Bidder Inquiry Key listed above. 4. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form. 5. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system. 6. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system. Specific Instructions for Future ProjNet Bid Inquiry Access from ProjNet home page: 1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in. 2. Identify the Agency. This should be marked as USACE. 3. Email. Enter the email address you used to register previously in ProjNet. 4. Key. Enter the Bidder Inquiry Key listed above. 5. Click Continue. A page will then open asking you to enter the answer to your Secret Question. 6. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system. Interested offerors shall provide feedback via the above website on this announcement NLT March 14, 2025 (5:00 p.m. Eastern Standard Time). DISCLAIMER: THE SOLE PURPOSE OF THIS NOTICE IS TO PROVIDE INFORMATION FOR CONTRACTORS TO REVIEW PRIOR TO ISSUANCE OF THE OFFICIAL SOLICITATION AND TO OBTAIN FEEDBACK AND QUESTIONS.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

3 days ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS