This Sources Sought opportunity from Department Of Defense was posted on January 14, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bar Harbor Breakwater Repair

Closed
W912WJ25X0005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Agricultural INNOVATION Farm Project for San Marcos Unified SD
Solicitation # 2026-21
The San Marcos Unified School District is soliciting bids for the Agricultural INNOVATION Farm Project (Solicitation 2026-21) located at 99 Cassou Rd, San Marcos, California. The project scope involves the demolition of an abandoned electrical pole, water pump, and fencing, followed by the installation of underground water and electrical utilities, irrigation lines, a gravel service road, shade structures, storage containers, arbors, and designated planting areas. Work must be performed in strict accordance with the technical specifications, project drawings, and soil report. The estimated period of performance begins December 1, 2026, with a required completion date of April 1, 2027. The contract will be awarded to the lowest responsible bidder. Qualified bidders must hold a valid California Contractor's License and be registered with the California Department of Industrial Relations (DIR), as the project is subject to prevailing wage requirements. Submission requirements include a bid bond for 10 percent of the contract amount, a non-collusion declaration, and references, all submitted via the OpenGov e-procurement portal by November 2, 2026. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract value and adhere to a 3 percent Disabled Veteran Business Enterprise (DVBE) participation goal. All materials must be delivered in original packaging and comply with UL 969 marking and labeling standards.
Curriculum and Instruction

POSTED

about 13 hours ago

DEADLINE

in 4 days
NAICS: 237990
New
SLED
Water Treatment Plant Maintenance Package ‘A’ Degasifier Package (Project No. 25-4261A)
Solicitation # IFB-395-26-JM
The City of Hollywood, Florida, is soliciting bids under IFB-395-26-JM (Project No. 25-4261A) for the Water Treatment Plant Maintenance Package A Degasifier Package. The project involves the replacement of packing media in three degasifiers (units 2, 3, and 4) at the Water Treatment Plant located at 3441 Hollywood Boulevard. The scope of work includes power washing vessel interiors, replacing media support grids and differential pressure gauges, vessel disinfection, and resealing access doors. To maintain continuous plant operations, work must be performed on one unit at a time. The project requires a prime contractor holding an active Florida General Contractor license, a project manager with at least five years of experience in similar projects, and a factory-trained service technician for field performance testing. The contract follows a strict timeline with substantial completion required within 180 calendar days and final project closeout within 210 calendar days from the Notice to Proceed. Bidders must provide a bid guaranty of 5 percent of the bid amount, and the successful awardee must provide performance and payment bonds equal to 100 percent of the contract price. Award will be granted to the lowest responsive and responsible bidder. Key financial terms include a City Contingency Allowance of 86,000 dollars, with mobilization and demobilization capped at 5 percent and 2 percent of the cost, respectively. The final bid submission deadline was extended to November 18, 2026, at 3:00 PM via the OpenGov e-Procurement Portal.
Public Utilities

POSTED

about 15 hours ago

DEADLINE

in 20 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Bar Harbor, ME, USA

Set-Aside

NONE

Documents

1

Draft Design Plans - Mount Desert Narrows / Bar Harbor Breakwater

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Sources Sought

Deadline changed

Response deadline changed from Dec 20, 2024 to Jan 24, 2025.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New England
Contacts1 person available
OfficeCONCORD, MA, 01742-2751, USA
Office AddressCONCORD, MA, 01742-2751, USA

Full Description

Show more
The U.S. Army Corps of Engineers, New England District is issuing a Sources Sought Announcement for repairs to the breakwater in Bar Harbor, Maine. This announcement is to determine the interest, availability, and capability of Small and Large Business concerns for this project. The NAICS code for this procurement is 237990 with a size standard of $45M. The contract solicitation is planned to be issued in the fall of 2025 with construction to take place over an 8-month period beginning in the spring of 2026. The estimated construction cost is between $10,000,000 and $25,000,000. The proposed work consists of repairing the rubblemound breakwater which extends approximately 2400 feet southwest from Bald Porcupine Island and across Porcupine Dry Ledge towards Mount Desert Island. Bald Porcupine Island is located about one mile southeast of the main Bar Harbor waterfront on Mount Desert Island. The work includes dismantling, removing, stockpiling, reworking and reinstalling existing armor stone as well as acquiring and installing new armor in the breakwater repair areas. The repaired areas must be properly interlocked and be within specified design tolerances. The breakwater is about 2400 feet in length, however, the repair area will on encompass the 750-foot section between Bald Porcupine Island and Porcupine Dry Ledge (Repair Zone 1), as well as, 700 feet of the breakwater beyond Dry Ledge (Repair Zone 2). The repairs will restore the structure to a design top elevation of +11.4 feet at Mean Lower Low Water (MLLW), with a crest width of 10 feet. Repair Zone 1 will have slopes of 1.5:1 and in Repair Zone 2 the slopes will be 1:1 leeward and 1.5:1 seaward. The breakwater was initially constructed between 1889 and 1917 and no repairs have occurred since construction was completed. The breakwater protects an anchorage and the wharves in Bar Harbor from easterly and southeasterly swells. The protected area is used by cruise ships, commercial/charter fishing boats, and recreational vessels. Bald Porcupine Island and Porcupine Dry Ledge are uninhabited and are owned by the National Park Service. Repair Zone 1, between Bald Porcupine Island and Porcupine Dry Ledge, is comprised of 3 to 10-ton armor stone and is in poor condition. An estimated 8,400 tons of new 6 to 10-ton armor stone will be needed to repair this breakwater. Repair Zone 2, southwest of Porcupine Dry Ledge, is comprised of 3 to 10-ton armor stone and is in fair condition. An estimated 4,600 tons of new 6 to 10-ton armor stone will be needed to repair this breakwater. New 6 to 10-ton armor stone will also be required to repair about six small areas outside Repair Zone 1 and 2. Some relevant information for the new armor stone: New armor stones sizes: 6-10 tons New stone unit weight: at least 162 pounds per cubic foot. A six ton stone is approximately 5ft x 5ft x 3ft and a 10 ton stone is approximately 6ft x 5ft x 4ft. Maximum aspect ratio (greatest dimension:least dimension): not greater than 3:1. New stone shape: irregular and angular. No slabs, rounded stones or wedged-shaped stones. Lab testing required: specific gravity, unit weight, absorption, and freeze/thaw. Field testing required: drop test. Specific work tasks are intended to reconstruct severely deteriorated areas of the breakwater to its authorized dimensions. These tasks include the recovery and resetting of displaced armor stone, and delivery and installation of approximately 10,000 to 14,000 tons of new 6 to 10-ton armor stone. Existing gaps in the structures will be filled, and the structures brought up to their design elevations, crest widths and slopes. Repairs will require substantial moving and rehandling of existing stones to obtain the required interlocking placement and construction tolerances. The completed repairs will provide a crest width of 10 feet and crest elevation of 11.4 feet at MLLW. Repair Zone 1 will have slopes of 1.5:1 and in Repair Zone 2 the slopes will be 1:1 leeward and 1.5:1 seaward. Given the nature and characteristics of this structure, it is anticipated that all repair and improvement construction activities will have to be performed from marine based plant. Access to the breakwater by land is unavailable and no work should be completed from the crest of the breakwater. Environmental coordination and permitting is being completed by the U.S. Army of Engineers, New England District. Low tide water depths in the vicinity of the structure range from 12 to 50 feet, and the average tidal range is approximately 11 feet. No spudding or anchoring into the existing structure is permitted. The U.S. Army Corps of Engineers, New England District is looking for responses to the questions below from BOTH SMALL AND LARGE BUSINESSES: What constructability challenges does industry identify with delivery of stone and staging, considering no staging options are available on site? What constructability challenges does industry identify with performing the work, considering difficulty accessing the structure, water depths, large tidal range, and weather conditions? What constructability challenges does industry identify with constructing side slopes of 1H:1V from a marine based plant? What constructability challenges does industry identify with re-handling stone that is covered in algae/barnacles (see photos)? What constructability challenges does industry identify with obtaining enough stone from quarries (assumes award in late November and start around April)? Would industry benefit from a site visit if organized by the Government? Responses will determine the likeliness of this happening. Draft drawings showing a concept design plan, cross sections, photographs, and a draft Specification Section 01 11 00 SUMMARY OF WORK are included to help provide more context for responses to questions. Interested firms should submit a capabilities package to include the following: business classification (i.e. HUBZone, etc.), answers to questions above, type of equipment the firm is proposing to use on the project, two (2) example projects performed by the firm in the last ten (10) years (including Points of Contact for those projects) showing experience with the proposed equipment and stone size handled for each project, and bonding capacity. Please indicate the team subcontractor(s) (if any), including their prior experience and qualifications meeting the same qualifications listed above, which will be used to support the bidder's effort. Firms may use subcontractor experience to demonstrate experience with the requirements, but the role and work performed by each team member (prime and subcontractors) on projects demonstrating that team member's experience shall be the same as the role for that team member for this project. Responses should include experience of Foreman and Crane Operators working on stone structures. Bid bond will need to be provided with the bid. Responses are limited to twenty pages and due by January 24, 2025. Responses should be emailed to: contact@example.gov The Government will not pay for any material provided in response to this market survey nor return the data provided. This notice is for information purposes only and is not a request to be placed on a solicitation mailing list nor is it a Request for Proposal (RFP) or an announcement of a solicitation. The results of this survey will be considered to be in effect for a period of one year from the date of this notice. Government Agency URL: www.nae.usace.army.mil Government Agency URL Description: New England District, Corps of Engineers

More opportunities from Department Of Defense → W2SD Endist New England

Same awarding agency

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS