Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

COMPUTER,RACKMOUNT

Active
N0010426QJB96Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract pertains to the repair of COMPUTER,RACKMOUNT units under solicitation N0010426QJB96, with a required Repair Turnaround Time (RTAT) of 75 days measured from the physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility (CAV) system. The contract is firm-fixed-price, with all freight terms FOB Origin, and the Navy handles all freight logistics under the CAV Statement of Work. Inspection by Government Source Inspection (GSI) is mandatory, and final acceptance must occur within the specified RTAT; failure to meet this deadline results in a per-unit-per-month price reduction, capped at a specified maximum, without affecting the Government’s right to terminate for default. The contractor must ensure all repairs adhere to the manufacturer’s technical standards, maintain full documentation, and comply with MIL-STD-130 Rev N marking requirements. Any design, material, or part number changes require prior written approval from the NAVICP-MECH Contracting Officer, and substitutions must be clearly coded and justified. The contract enforces strict compliance with federal regulations including Buy American provisions, cybersecurity maturity certification requirements, and mandatory use of Workflow Pro (WFP) for payment and receiving. A small business subcontracting plan is required, and the contractor must provide pricing justification if the item has not been previously purchased by NAVSUP WSS or if pricing differs from historical rates. An option exists to increase the quantity of repairs within 365 days of award at the original unit price. The awardee must submit a quote including unit price, total price, and RTAT, and if the item is deemed beyond repair, a negotiated tear-down and evaluation fee not to exceed a specified amount may apply. All documentation, including proof of authorized distributor status, must be submitted with the offer, and CAGE codes for the awardee, inspection location, and any subcontractor facilities must be clearly identified. The solicitation is open to authorized distributors only, and all referenced technical documents must be obtained through designated government portals or official channels.

General Info

Firm-fixed-price repair contract for rackmount computers with 75-day RTAT, FOB Origin, GSI mandatory, strict compliance required.

Agency

Department Of Defense → Navsup Weapon Systems Support MechView Agency

NAICS

335313 - Switchgear and Switchboard Apparatus ManufacturingView NAICS

Place of Performance

PA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support Mech
Contacts1 person available
OfficeMECHANICSBURG, PA, 17050-0788, USA
Organization / Agency
Department Of Defense → Navsup Weapon Systems Support Mech
View Agency Profile
Office AddressMECHANICSBURG, PA, 17050-0788, USA

Full Description

Show more
CONTACT INFORMATION|4|N7M1.23|HP5|7712291604|KRISTEN.L.WARDECKER.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO INVOICE & RECEIVING||TBD|N00104|TBD|TBD|SEE SCHEDULE|SEE SCHEDULE|SEE SCHEDULE||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|KRISTEN WARDECKER| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| OPTION FOR INCREASED QUANTITY (MAR 1989)|1|365 DAYS FROM DATE OF AWARD| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule. ^^ All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's signed acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnaround Time (RTAT) of: 75 DAYS Government Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work. Your quote should include the following information: QUOTE AMOUNT AND RTAT Unit Price:__________ Total Price:__________ Repair Turnaround Time (RTAT): _______ days If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___ Return Material Authorization # (RMA), if applicable:__________ Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :__________________ IF ITEM NOT PREVIOUSLY PURCHASED BY NAVSUP WSS - or - PRICES INCREASED Provide the NSN of a similar item or, if current NSN is an upgrade part, provide the previous NSN. If previously sold to another buying activity or in the commercial marketplace, provide a copy of your company's invoice (redacted versions are acceptable). If pricing is not in line with historical pricing, provide the basis of your company's pricing. TESTING AND EVALUATION IF BEYOND REPAIR T&E fee/price (if asset is determined BR/BER): If an item is determined BR, and the contractor provides documentation that costs were incurred during evaluation and determination of BR, the contracting officer will negotiate a reduced contract price, not-to exceed (NTE) $___________associated with the repair effort to reflect the BR status of the equipment. The T&E fee (if asset is determined BR/BER) was determined/computed based on:______________________________________. AWARDEE INFO & PERFORMANCE LOCATION Awardee CAGE: __________ Inspection & Acceptance CAGE, if not same as ""awardee CAGE"": __________ Facility/Subcontractor CAGE (where the asset should be shipped), if not same as ""awardee CAGE"":__________ IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW New unit price:__________ New unit delivery lead-time:__________ The Government intends to add an option quantity to the resultant contract. In reference to the option quantity, the Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The Contracting Officer may exercise the option by written notice to the Contractor within the number of days in FAR 52.217-6 herein. Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree. IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late - any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction. If a price reduction is required due to unexcusable contractor delay, the Contracting Officer will implement the aforementioned price reduction via a ""reconciliation modification"" at the end of the contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. In reference to the above important note, the contractor provides the following price reduction amount per unit per month the contractor does not meet the RTAT: $__________, up to a maximum of: $_________. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the COMPUTER,RACKMOUNT . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The COMPUTER,RACKMOUNT repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;03956 4304694-1; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 Inspection/Testing Repaired Items - The Contractor shall perform all inspection and testing requirements as specified in the original manufacturer's specifications and drawings. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.2 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. 6.3 Notice To Distributors/Offerors - Consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation. If you desire to be considered as a potential source for award of this contract, proof of being an authorized distributor shall be provided on company letterhead signed by a responsible company official and sent with your offer to the Procurement Contracting Officer.

Similar Contracts

Same NAICS industry code

NAICS: 335313
New
Federal
CIRCUIT BREAKERThis contract pertains to the repair of a 3-pole, 2000-amp AC circuit breaker with specific technical specifications including a trip amp rating of LGTD STG2100 SHTTDSTG 2800 SHTTD BAND NO 3, identified by manufacturer drawing 199590 and CD sheet drawing 711022, under CAGE code 30086 and reference number 199590-711022. The solicitation, issued under Emergency Acquisition Flexibilities, mandates a strict Repair Turnaround Time (RTAT) of 194 days, measured from the physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility system. All repairs must adhere to the contractor’s approved technical manuals and government standards, with any design or part number changes requiring prior written approval from the NAVICP-MECH Contracting Officer, categorized under specific Code classifications. The contract requires Firm-Fixed-Price terms, and failure to meet the RTAT results in monthly price reductions per unit, capped at a specified maximum, without limiting the Government’s right to terminate for default. Government Source Inspection is mandatory, and all work must comply with MIL-STD 2073 packaging standards. The contract imposes rigorous quality assurance obligations, requiring contractors to maintain complete inspection records for 365 days after final delivery and to ensure full compliance with all requirements regardless of inspection provisions. All shipments are FOB Origin, with freight handled by the Navy under the CAV Statement of Work, and the contractor must accurately report transaction dates within five business days. The solicitation enforces Buy American and cybersecurity maturity model certification requirements, mandates compliance with Small Business Subcontracting Plan and Security Prohibitions, and requires adherence to the Mandatory Use of Workflow Pro Assist Module and Navy-specific payment instructions. Submission must include quote amount, RTAT, unit and total pricing, and comparison to new unit cost and lead time, with final award contingent on bilateral acceptance. Responses are due by August 5, 2026, and all inquiries are directed to Kevin C. Bilous at the Navy’s Mechanicsburg office.
Navsup Weapon Systems Support Mech

POSTED

about 3 hours ago

DEADLINE

in 7 days
View Details
NAICS: 335313
New
Federal
59--NQB-A-1600 CKT BRKRThis solicitation, identified as N0010426RBJ29, is a firm-fixed-price contract issued by the Naval Supply Systems Command Weapon Systems Support Mechanic for the procurement of a circuit breaker under NAICS code 335313. The closing date for proposals has been extended to 29 April 2026, with pricing valid for 90 days after the closing date unless otherwise specified. All technical documentation, including the Individual Repair Part Ordering Data (IRPOD), drawings, and specifications, must be accessed via a secured government website requiring pre-registration; no hard copies will be mailed. Compliance with detailed quality, packaging, and inspection requirements is mandatory, with the IRPOD serving as the primary source for technical and quality controls. The contract invokes strict order of precedence for conflicting documents, mandates adherence to specified document revisions, and prohibits the use of mercury or mercury-containing compounds. Contractors must maintain an approved inspection system and retain records for government review. Packaging must comply with MIL-PRF-23199 and related standards, with specific exceptions noted for green poly bags and the elimination of fire-retardant materials. Delivery of a Certificate of Compliance per DI-MISC-81356 is required at the time of material delivery for each unique item. The solicitation includes mandatory clauses on cybersecurity maturity, supply chain security, small business representation, equal opportunity for veterans and workers with disabilities, Buy American requirements, and federal acquisition regulations, all aligned with the latest FAR revisions. Offers must be submitted in full, signed form prior to the deadline, and must include complete responses to all applicable provisions, with proposals deemed invalid if incomplete. All contractual documents are considered issued upon electronic transmission. The point of contact for inquiries is Michael B. Duffy, with additional guidance available through the e-commerce support line.
Navsup Weapon Systems Support Mech

POSTED

about 3 hours ago

DEADLINE

in about 9 hours
View Details
NAICS: 335313
New
Federal
CIRCUIT BREAKERThis contract solicits repair services for a circuit breaker under a firm-fixed-price structure, with a mandatory Repair Turnaround Time (RTAT) of 150 days measured from physical receipt of the asset at the contractor’s facility, as recorded in the Commercial Asset Visibility (CAV) system. All repairs must comply with the original manufacturer’s specifications, drawings, and applicable military standards including MIL-STD-130 Rev N for marking, and any design or part number changes require prior written approval from the NAVICP-MECH Contracting Officer under specific code classifications. The Government requires Government Source Inspection and expects the contractor to maintain comprehensive inspection records for 365 days after final delivery. Freight is FOB Origin, and the Navy handles all transportation per the CAV Statement of Work. The contract includes an option to increase quantities at the originally quoted unit price, exercisable within the timeframes specified in FAR 52.217-6 or 52.217-7. Contractors must provide unit and total pricing, RTAT, and a comparison of repair cost versus new unit price and lead time, and must be authorized distributors of the original manufacturer, with proof submitted as part of their offer. All offers must address compliance with the Buy American Act, Small Business Subcontracting Plan, and security prohibitions under deviation 2026-O0025, while adhering to the Mandatory Use of Workflow Pro (WFP) Mod Assist Module and Navy-specific payment and reporting protocols. The solicitation is issued under a total small business set-aside and requires completion of Alternate A annual representations and certifications. The place of performance is not specified, but the awardee’s CAGE code and inspection location must be declared, with potential subcontractor CAGE codes noted if different. Documentation referenced must be accessed through official DoD sources such as DODSSP or Quicksearch, and distribution of Navy-provided materials is restricted per seven recognized distribution statement codes. The contracting officer retains the right to inspect, test, and reject nonconforming items at any time, and all work must be verified by formal Government acceptance within the RTAT framework. Responses are due by August 28, 2026, with the solicitation issued by the Navy’s Supply Support Center in Mechanicsburg, Pennsylvania.
Navsup Weapon Systems Support Mech

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 335313
New
DIBBS
CIRCUIT BREAKERThe contract specifies the procurement of a circuit breaker, part number MS25361-75, manufactured in compliance with SAE AS58091 Revision D dated 08/01/1999, with no commercial substitutes allowed without prior written government approval. The item is classified as a critical application item and must meet strict technical and quality standards as defined in the DLA Master List of Technical and Quality Requirements, with sampling to follow MIL-STD-1916 or ASQ H1331 Table 1 using zero-defect acceptance criteria unless otherwise stated. Mercury and mercury-containing compounds are strictly prohibited from direct contact with the hardware except in limited, explicitly defined exceptions such as functional batteries or instruments, with additional requirements for secondary containment and shockproofing for portable devices containing mercury. The use of Class I ozone-depleting substances is entirely prohibited in any phase of design, manufacturing, or testing unless approved in writing by the contracting officer, overriding any conflicting specification language. The item must be packaged, marked, and shipped in full compliance with MIL-STD-2073-1E and MIL-STD-129, with packaging code U, preserved using Method 41, and shipped FOB origin to the designated receiving warehouse in Tracy, California. Delivery is required within 147 days of contract award, with a mandatory ship date of January 5, 2027, and no variance in quantity allowed—exactly 12 units must be delivered. The NSN is 5925-01-080-1371, and all transportation details adhere to DLA procedures C19 and C20. The solicitation number is SPE7M5-26-T-356X, issued under NAICS code 335313 by the Department of Defense’s Active Devices Division, with a response deadline of August 10, 2026, and inspection and acceptance performed at the destination.
ACTIVE DEVICES DIVISION

POSTED

about 22 hours ago

DEADLINE

in 12 days
View Details

More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech

Same awarding agency

NAICS: 333611
New
Federal
CASE,COMPRESSOR,NONThis solicitation, issued under Emergency Acquisition Flexibilities, seeks repair services for the CASE, COMPRESSOR, NON, with a required turnaround time of 202 days from physical receipt of the asset at the contractor’s facility, as recorded in the Commercial Asset Visibility system. Only firm-fixed-price or not-to-exceed quotes for repair are acceptable; test and evaluation pricing alone will not be considered. The contract mandates strict adherence to Item Unique Identification standards under DFARS 252.211-7003, MIL-STD-130 Marking, and MIL-STD-2073 Packaging, with all work performed by an authorized repair source. Contractors must provide a monthly throughput capacity and acknowledge a 365-day induction expiration window after award, beyond which repairs require bilateral agreement. Failure to meet the turnaround time triggers a pre-defined per-unit, per-month price reduction, with no penalty for excusable delays such as government-caused holds, and potential termination for default remains reserved. All submissions must include unit and total repair prices, new unit cost, RTAT, T&E fee caps for BR/BER items, CAGE codes for award, inspection, and shipping facilities, a cost breakdown with profit rate, and an expiration date of at least 90 days. Submission is exclusively via email to KATE.C.HEIDELBERGER.CIV@US.NAVY.MIL, with mandatory compliance with Wide Area Workflow Payment Instructions and mandatory use of Workflow Pro’s Assist Module. The solicitation is a total small business set-aside issued under Deviation 2026-O0037, and the awardee must be an authorized distributor of the original manufacturer’s item, requiring proof of authorization on company letterhead. The contract incorporates military standards for inspection, quality assurance, and documentation retention for 365 days post-final delivery, and requires precise reporting of asset transactions in CAV within five business days of receipt. Distribution of technical data is controlled under OPNAVINST 5510.1 with designated distribution codes, and requests for “NOFORN” or “Official Use Only” documents must be submitted through proper channels. The contracting office is located in Mechanicsburg, PA, with performance tied to Navy CAV or Proxy CAV logistics, and all responses are due by August 28, 2026.
Turbine and Turbine Generator Set Units Manufacturing

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
48--VALVE, GLOBE, REGThis contract pertains to the procurement of a globe control valve under solicitation N0010426REA76, issued by the Naval Supply Systems Command Weapon Systems Support Mechanical division, and is structured as a firm-fixed-price agreement with mandatory compliance to specific military and industry standards. The contractor must adhere to detailed technical and quality assurance requirements outlined in the Individual Repair Part Ordering Data (IRPOD), which takes precedence over other contract documents in case of conflict, with an established order of precedence for resolving discrepancies among cited specifications, drawings, and standards. All technical data, including drawings, STRs, and repair part documentation, must be obtained from the secure logistics website, requiring pre-registration and password access, and contractors are prohibited from combining revisions of documents unless approved by the Contracting Officer. The contractor is required to implement and maintain a government-acceptable inspection system, retain complete inspection records, and comply with packaging specifications under MIL-PRF-23199 and MIL-STD-2073, particularly regarding cleanliness controls and the use of heat-sealed envelopes, while the use of fire retardant packaging is explicitly excluded. The contract requires submission of pre-manufacturing procedure packages and certified test and inspection reports within specified timelines—45 days after award and at contract end date respectively—and mandates separate submission packages for each unique contract, NSN, and item combination. All deliverables must conform to DD Form 1423 data requirements, including correct use of inspection and acceptance codes, distribution statements, and submission frequency indicators, with pricing governed by one of four data groups based on usage and development effort. The government retains the right to impose a stop-work order, and stringent security and cybersecurity maturity certifications apply. Vendor waivers or deviations from technical requirements must be formally submitted with full technical justification and supporting data, and must be reviewed by the Quality Assurance Representative before being forwarded to the Post-Award Contracting Officer. The offeror must submit a complete, signed proposal prior to the August 28, 2026 deadline, and pricing is valid for 60 days post-closing unless otherwise specified. Small business representation is required, mercury is prohibited in materials, and all contractual documents are considered issued upon electronic transmission. Failure to comply with any requirement, including those related to equal opportunity, security prohibitions, or cybersecurity certification, may result in disqualification or contract non-performance.
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 333998
New
Federal
JACKBOX SWITCHThis contract pertains to the manufacture of the JACKBOX SWITCH, identified by part number 62107-0001, under solicitation N0010426QAC19 issued by the Navsup Weapon Systems Support Mech office in Mechanicsburg, PA. The contract mandates strict adherence to military standards for design, marking, and configuration control, requiring compliance with MIL-STD-130 for mechanical parts, MIL-STD-1285 for electrical and electronic components, and MIL-STD-973 for configuration management, including formal submission of engineering change proposals, deviations, and waivers. All items must meet specified material and physical requirements, and the contractor bears full responsibility for quality assurance, including maintaining inspection records for 365 days after final delivery. Government source inspection per FAR 52.246-2 is required, and sampling does not permit submission of defective material. Delivery is mandated within 90 days, and packaging must conform to MIL-STD-2073 as referenced in the schedule. The procurement is subject to a total small business set-aside and includes cybersecurity maturity model certification requirements, priority rating for national defense use, and specific security prohibitions. The contractor must comply with all labeling and marking standards, and sourcing is restricted to vendors listed under OD36190; substitutions require prior government testing and approval. Documentation access for controlled items, including NOFORN and classified materials, must follow specified procedures through designated government offices. Payment instructions are routed through Wide Area Workflow using the provided email, and all contractual documents are considered officially issued upon electronic transmission. The contract incorporates current and applicable government regulations, deviations, and certifications effective through 2026, with the response deadline set for August 17, 2026.
All Other Miscellaneous General Purpose Machinery Manufacturing

POSTED

about 3 hours ago

DEADLINE

in 19 days
View Details
NAICS: 332919
New
Federal
REDUCER,PIPEThis contract, issued under solicitation number N0010426QFG37 by the Naval Supply Systems Command Weapon Systems Support at Mechanicsburg, Pennsylvania, is a combined solicitation for a pipe reducer designated as SPECIAL EMPHASIS material, Level I, due to its critical role in shipboard systems where failure could result in catastrophic loss of life, vessel, or critical systems. The item, a 1-1/2 x 1 inch NPS reducer, must comply strictly with Buships Drawing 803-1385945, Piece 2, and be manufactured from MIL-C-15726, alloy C71500 in Temper 060 or M20-Soft, with mandatory quantitative chemical and mechanical certification traceable to heat or lot numbers. All material must be permanently marked for traceability per MIL-STD-792, with exceptions for small surfaces requiring durable tags, and all certifications must be submitted via WAWF to Portsmouth Naval Shipyard under DODAAC N50286, with inspection and acceptance authority held by N39040 and notification via PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL. No material may be shipped without prior written acceptance. The contractor must maintain an ISO-9001 quality system aligned with ISO-10012 and ISO/IEC 17025 calibration standards, with documented procedures available for government audit, and must permit Government Quality Assurance at source. All welding and brazing, including repair and production, must follow S9074-AQ-GIB-010/248 or S9074-AR-GIB-010A/278, with procedures and welder qualifications submitted for Navy approval prior to any work. Weld filler metal must be certified with lot numbers and conformity statements, and all welds require NDT certification tied to joint and layer. The contract demands 100% verification of material certifications, traceability markings, and NDT reports, with zero-defect acceptance sampling per ANSI/ASQ Z1.4. Waivers and deviations must be formally submitted via email, classified as Critical, Major, or Minor, and approved by the Contracting Officer. The order is DO-rated under the Defense Priorities and Allocations System, subject to Emergency Acquisition Flexibilities, and mandates strict adherence to Buy American and Mercury-Free requirements. The full submission deadline
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
VALVE/ACTUATOR ASSYThis contract pertains to the repair of a VALVE/ACTUATOR ASSY under solicitation N0010426QLC26, issued by the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania. The Government requires a Repair Turnaround Time (RTAT) of 180 days, measured from the physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility system, to final Government acceptance. Delivery is FOB Origin, and all freight is managed by Navy CAV or Proxy CAV per NAVSUPWSSFA24 or NAVSUPWSSFA25. The contract mandates Government Source Inspection, and any failure to meet the RTAT without excusable cause will result in a per-unit, per-month price reduction, up to a specified maximum limit, with no limitation on other remedies including termination for default. The offering must include a firm-fixed-price quote with unit and total pricing, along with the proposed RTAT, and if longer than 180 days, an explanation of capacity constraints. The contract incorporates numerous mandatory clauses including Buy American Act requirements, cybersecurity maturity model certification, Small Business Subcontracting Plan, Security Prohibitions and Exclusions, and Mandatory Use of Workflow Pro (WFP) Mod Assist Module. All repairs must adhere to the original manufacturer’s specifications and drawings, and items must be marked in compliance with MIL-STD-130 Rev N. Substitutions of parts require prior written approval from the NAVICP-MECH Contracting Officer, with specific code classifications for changes. The contractor must maintain complete inspection records for 365 days after final delivery and ensure compliance with packaging standards under MIL-STD-2073. Only authorized distributors of the original manufacturer may bid, requiring proof of authorization on company letterhead. The Government reserves the right to exercise an option to increase quantities under the same unit price, and the contract is subject to reconciliation modifications for pricing adjustments due to delays. All technical documents provided are subject to distribution statements controlling accessibility, and NOFORN or Official Use Only documents require special requests through designated Navy channels.
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 3 hours ago

DEADLINE

in about 5 hours
View Details
NAICS: 332919
New
Federal
PARTS KIT,BALL VALVThis contract pertains to the repair and refurbishment of a ball valve parts kit designated as special emphasis material due to its critical role in shipboard systems, where failure could result in catastrophic consequences including loss of life or vessel. All work must comply with stringent quality requirements, including full traceability of materials from raw stock to final assembly, with mandatory certifications for chemical and mechanical properties of components such as the ball (SAE-AMS-6931 or centrifugally cast 6AL-4V titanium) and seats (Torlon 4503, 4203, or 4203L polyamide-imide per Electric Boat Specification 4147). The repair must restore items to "like new" or "A" condition, with strict limitations on rework—specifically, balls may only be reworked to a minimum diameter of 8.359 inches, and any defects exceeding specified tolerances must be dispositioned. All welds, brazing, and surface treatments must adhere to approved procedures, with submission of qualified processes and welder certifications prior to work commencement, and chemical testing required for surface coatings to meet strict iron/nickel content limits. Contractors must maintain a certified quality management system compliant with ISO-9001, ISO-10012, and ISO/IEC 17025, or alternatively MIL-I-45208 with MIL-STD-45662, and are subject to government quality assurance inspections at source. Material traceability is absolute: every component must bear a permanent, legible marking (MIL-STD-792), directly linking it to its certification data submitted via the Wide Area Work Flow (WAWF) system to Portsmouth Naval Shipyard (N50286) for review and approval prior to shipment. Certification data must be submitted at least 20 days prior to delivery and accepted before any material is released, with final delivery constrained to within 365 days of contract effective date. The contract mandates submission of not-to-exceed pricing, a beyond-repair cost estimate, and excludes shipping costs as government transportation is provided. Offers require a demonstrated quality control manual, and past performance is evaluated. All submissions must be electronic and traceable, and any deviations or waivers require formal approval from the Contracting Officer, classified as critical, major, or minor, with detailed justification. This is a Level I repair under a small business set-aside
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 334412
New
Federal
59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OFThis contract pertains to the repair and modification of a CIRCUIT CARD ASSEMBLY under a fixed-price arrangement with strict compliance requirements outlined by Department of Defense standards. The work must adhere to MIL-STD-130 for unique identification and MIL-STD-1686 for electrostatic discharge control, with repairs performed according to the contractor’s approved technical procedures and manufacturer specifications. The item must be marked properly, free of mercury contamination, and any substitution of parts requires prior written approval from the NAVICP-MECH Contracting Officer, with specific code classifications governing the nature of changes. The contractor is responsible for all inspections, must maintain detailed records for one year after final delivery, and ensure packaging complies with MIL-STD-2073. The contract includes a 1-year warranty on supplies, a mandatory requirement to use Workflow Pro (WFP) Mod Assist for payment processing, and compliance with Buy American and small business set-aside provisions. A 180-day option provision allows the government to increase the order quantity without re-solicitation, and pricing for this option must be included in the proposal. Evaluation for award will be based on the lowest aggregated total price including the option. The repair must be completed within an estimated 145-day RTAT period, encompassing both refurbishment and return shipment to the Navy. Additionally, distribution of technical documents is restricted under OPNAVINST 5510.1, with specific codes governing access, and only authorized distributors of the original manufacturer may submit offers. Security, export controls, and subcontractor compliance are tightly regulated, including prohibitions on mercury use and mandates for protective labeling if mercury is an essential component. All contractual documents are deemed issued upon electronic transmission, and failure to meet delivery timelines may result in enforceable penalties unless excused by extenuating circumstances.
Bare Printed Circuit Board Manufacturing

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332510
New
Federal
LOCKPLATE,F-R,2SThe contract pertains to the procurement of a Lockplate, F-R, 2S under solicitation N0010426QEC09, issued by the Naval Supply Systems Command Weapon Systems Support Mechanic, with a response deadline of August 28, 2026. Pricing is valid for 60 days after the closing date unless otherwise specified, and vendors must review the mandatory Individual Repair Part Ordering Data (IRPOD) available via the BPMI website, which requires pre-registration. The contract incorporates a hierarchy of governing documents, with contract amendments taking precedence over the schedule, terms and conditions, and then IRPOD, followed by technical specifications, drawings, and standards. Contractors must use referenced documents in their entirety and obtain prior written approval from the Contracting Officer for any deviations or use of later revisions. Compliance with cleanliness control standards such as MIL-STD-767 and MIL-STD-2041 is required where invoked, with packaging governed by MIL-PRF-23199 and MIL-DTL-24466 green poly bags under specific conditions, while fire-retardant packaging is no longer required. Mercury or mercury-containing compounds are strictly prohibited from contact with supplied hardware. Quality assurance requirements are defined in the IRPOD, and contractors must maintain complete inspection records accessible to the government throughout performance and beyond. All contractual documents are considered issued upon electronic transmission, email, or fax, with acceptance of the proposal forming a bilateral agreement. Technical data packages (TDPs) referenced via DD Form 1423 include detailed instructions on data submission, including delivery frequency, approval codes, distribution restrictions, and pricing groups, with specific codes governing inspection and acceptance authority at source or destination. Contractors must submit certified test and inspection reports per DI-QCIC-8872, in separate packages for each unique NSN and item nomenclature, and obtain PCO authorization prior to shipment. Distribution of technical documents follows DoDI 5230.24 with six defined codes limiting dissemination to U.S. government agencies, DoD contractors, or restricted entities. The contract mandates use of Wide Area Workflow for payment and requires compliance with cybersecurity maturity model certification levels, total small business set-aside provisions, and security exclusions. Transportation by sea and priority rating under national defense programs further apply. Vendor waivers or deviations must include full justification, technical data supporting the proposed change, and evaluation demonstrating no adverse impact on fit, form, or function
Hardware Manufacturing

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 335931
New
Federal
61--FUSE BLK/EMI A11, IN REPAIR/MODIFICATION OFThis contract solicitation, numbered N0010426QDB12, solicits repair services for the FUSE BLK/EMI A11 component under a firm-fixed-price arrangement, with a mandatory Repair Turnaround Time (RTAT) of 78 days measured from the physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility (CAV) system. All repairs must comply with the original manufacturer’s specifications, and the contractor is required to adhere to MIL-STD-130 Rev N for item marking and MIL-STD-2073 for packaging. The Government will conduct mandatory inspections, and the contractor must maintain complete inspection records for 365 days post-delivery. Freight is FOB Origin and managed by the Navy under the CAV Statement of Work; all quotes must include unit and total prices along with the proposed RTAT, and failure to meet the 78-day requirement necessitates disclosure of capacity constraints. Repair performance is subject to a detailed subcontracting plan, Buy American provisions, cybersecurity maturity certification, and compliance with Defense Federal Acquisition Regulation Supplement clauses, including the mandatory use of Workflow Pro and the release of offeror information under Navy protocols. The awardee must hold authorization as an official distributor of the original manufacturer, and proof of authorization must accompany the proposal. The contract includes strict prohibitions against unapproved design, material, or part number substitutions, with any changes requiring written approval from the NAVICP-MECH Contracting Officer and classification under specific Code designations. Pricing must account for all costs related to repairing items in unwhole, damaged, or incomplete condition, and if an item is deemed beyond repair, a negotiated teardown and evaluation fee not to exceed a specified amount may apply. The contract also incorporates clauses on security exclusions, annual representations, cybersecurity readiness, and small business subcontracting obligations. All technical documentation referenced must be obtained through official DoD sources, with distribution restrictions governed by seven defined codes and safeguarding requirements under OPNAVINST 5510.1. Proposals are due by August 18, 2026, and the award will be bilateral, requiring the contractor’s written acceptance before execution. The award will be managed by the Navy Supply Systems Command in Mechanicsburg, Pennsylvania, and all communication must be directed to the designated point of contact.
Current-Carrying Wiring Device Manufacturing

POSTED

about 3 hours ago

DEADLINE

in 20 days
View Details
NAICS: 334514
New
Federal
66--VENTURI METER, IN REPAIR/MODIFICATION OFThis contract solicitation, numbered N0010425QDE06, is for the repair and modification of a VENTURI METER under a firm-fixed-price structure, with a required Repair Turnaround Time (RTAT) of 175 days measured from the physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility (CAV) system. The Government mandates strict compliance with MIL-STD-130 for item marking and requires all repairs to adhere to manufacturer specifications, authorized technical orders, and approved repair standards. The CAGE code 53711 and reference number 6128170 identify the specific item to be repaired, and any changes to design, material, or part number must be formally approved via written change order, with specific codes documenting the nature of the modification. Contracting officers will inspect and accept repaired items, and all inspection records must be maintained for 365 days post-delivery. Freight is managed by the Navy, and the contractor must accurately report asset transactions in CAV within five business days. The solicitation includes a clause requiring proof of authorization as a distributor of the original manufacturer’s item, and pricing must encompass all costs associated with repairing potentially unwhole, damaged, or incomplete units. A Teardown & Evaluation fee may be negotiated if the asset is deemed beyond repair, capped at a not-to-exceed amount yet to be specified. The Government reserves the right to exercise an option to increase quantity under the terms of FAR 52.217-6, and all awards will be issued bilaterally, contingent upon the contractor’s written acceptance. Performance is governed by the Clause 52.222-90 inclusion following the FAR overhaul, and the contract aligns with the Buy American Act and Annual Representations and Certifications, with an induction expiration deadline set at 365 days. The response deadline is August 18, 2026, and all proposals must include unit price, total price, and actual RTAT, with deviations from the government's requirement requiring documented capacity constraints. The point of contact is Aryel A. Ryan, with communications directed to the provided Navy email address.
Totalizing Fluid Meter and Counting Device Manufacturing

POSTED

about 3 hours ago

DEADLINE

in 20 days
View Details
NAICS: 334412
New
Federal
CIRCUIT CARD ASSEMBThis contract pertains to the repair of CIRCUIT CARD ASSEMBLY items under an emergency acquisition authority, issued as a solicitation with the number N0010426QQB83 by the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania. The requirement mandates that all repairs adhere strictly to the original manufacturer’s technical specifications, drawings, and approved procedures, with compliance governed by MIL-STD-130 for marking and ANSI/ESD S20.20 for electrostatic discharge control. All work must be performed by authorized distributors of the original equipment manufacturer, who must submit proof of authorization with their quote. The contract requires a Firm-Fixed-Price structure, with the contractor responsible for inspection, testing, and documentation throughout the repair process, and all repairs must meet a designated Return to Repair Turnaround Time (RTAT) measured from physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility system. The contract stipulates that freight is FOB Origin and handled by the Navy under the Commercial Asset Visibility Statement of Work, with Government Source Inspection mandatory. Contractors must provide detailed pricing including unit and total costs, RTAT, and justification for any pricing outside historical norms, along with comparisons between repair costs and new purchase prices. If an item is deemed beyond repair, a separate testing and evaluation fee applies, capped at a specified amount. Modifications to part numbers, materials, or design require prior written approval from the contracting officer, classified under specific change codes. All records must be maintained for 365 days post-delivery. The order is issued under and incorporates by reference any existing Basic Ordering Agreement, with BOA terms prevailing in case of conflict. The contract also enforces Buy American requirements, security prohibitions, small business subcontracting obligations, and mandatory use of Workflow Pro for payment and documentation, with all submissions due by August 28, 2026.
Bare Printed Circuit Board Manufacturing

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details