Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Conceptual Design Engineer (Civil/Water Resources)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity is for a Conceptual Design Engineer specializing in Civil and Water Resources to support prime contractors on flood mitigation projects for the Public Works Engineering Department of the City of Santa Maria in California. The selected professional will be responsible for developing conceptual engineering alternatives and preliminary designs, advancing preferred options to a 10 percent conceptual design, and creating planning-level cost estimates. Technical requirements for the role include proficiency in AutoCAD and Civil 3D, and the candidate must hold a Professional Engineer license. The primary deliverables for this engagement are an alternatives analysis report and a 10 percent conceptual design. Interested parties must respond by October 19, 2026.

General Info

PE licensed Conceptual Design Engineer for Santa Maria flood mitigation projects by October 19, 2026.

Documents

This scope was carved out of RFP - Drainage Study.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

City of Santa Maria Drainage Study

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works Engineering Department of City of Santa Maria
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Develops conceptual engineering alternatives and preliminary designs for flood mitigation for prime contractors on City of Santa Maria projects. Advances preferred alternatives to a 10% conceptual design and prepares planning-level cost estimates. Uses AutoCAD and Civil 3D. Requires Professional Engineer (PE) license. Delivers a 10% conceptual design and alternatives analysis report.

Similar Contracts

Same NAICS industry code

More opportunities from California → Public Works Engineering Department of City of Santa Maria

Same awarding agency

NAICS: 541330
New
SLED
City of Santa Maria Drainage Study
Solicitation # RFP - Drainage Study
The City of Santa Maria Public Works Engineering Department is soliciting proposals for professional engineering services to develop a Citywide Drainage Study and Flood Mitigation Master Plan. The project involves conducting watershed-based analysis, hydrologic and hydraulic modeling, and identifying infrastructure deficiencies to create cost-effective flood mitigation strategies. The selected consultant will be responsible for advancing a preferred alternative to a 10 percent conceptual design. All work must be performed under the responsible charge of a Professional Civil Engineer licensed in the State of California. The contract is intended to span 18 months, with proposals due by October 19, 2026, and a planned award date of November 17, 2026. The selection process is based on a 100-point evaluation system focusing on organization and approach, qualifications, staff availability, and past experience. Award is granted to the most qualified consultant at the City's sole discretion. Contractors must comply with California Labor Code requirements, including registration under section 1725.5, workers' compensation certification under section 3700, and adherence to prevailing wage rates. Payment is structured based on the conclusion of assigned tasks, with a restriction that total payments cannot exceed 90 percent of the not-to-exceed cost until the City accepts all final deliverables, which include a final master plan, GIS databases, and hydraulic models. The agreement is governed by the laws of the State of California with jurisdiction in Santa Barbara County.
Engineering Services

POSTED

6 days ago

DEADLINE

in 22 days
View Details
NAICS: 541330
SLED
PS&E for the ATP Cycle 6 - Active Santa Maria Safe Routes to School Corridor Improvements
Solicitation # RFP - ATP Cycle 6
The City of Santa Maria Public Works Engineering Department is soliciting professional engineering services for the final design and preparation of Plans, Specifications, and Estimate (PS&E) for the Active Transportation Program (ATP) Cycle 6 Active Santa Maria Safe Routes to School Corridor Improvements. The project focuses on enhancing safety, connectivity, and mobility for students traveling to local schools and colleges through the implementation of bicycle facilities, ADA-compliant curb ramp upgrades, and trail improvements. The scope includes project management, design validation of 30 percent concept plans, and environmental requirements such as supplemental Phase II environmental sampling and the preparation of hazardous materials design-basis memorandums. The procurement follows a qualifications-based selection process where price is not an evaluation factor for ranking; instead, the city will rank firms based on technical qualifications and negotiate fees with the highest-ranked firm. Proposals are due by October 9, 2026, and must include a technical proposal and a separate sealed fee schedule. The project timeline begins with the design phase in January 2027, with the design phase ending in January 2028, construction award following in February 2028, and final project closeout expected by December 2029. Selected contractors must adhere to Caltrans Local Assistance Procedures Manual standards and California prevailing wage requirements.
Engineering Services

POSTED

9 days ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS