Concrete Boat Ramp Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of 26-0075-MA.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Seminole Boat Ramp

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Public Works
ContactsNo contacts available
OfficeN/A
Organization / AgencyFlorida → Public Works
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs reinforced concrete launching bays for prime contractors on City of Clearwater Public Works marine projects. Pours 4,000 PSI concrete using caissons or pumps and installs epoxy-coated rebar. Creates slip-reduction grooves extending to the -5.0 ft contour. Provides shop drawings and calculations for design. Delivers eight finished concrete boat ramps capable of 30-ton loads.

Similar Contracts

Same NAICS industry code

NAICS: 238110
New
SLED
26-0126-2 Concrete Replacement at the Chatham County Aquatic Center
Solicitation # 26-0126-2
Solicitation 26-0126-2 is a one-time purchase contract issued by Chatham County, Georgia, to remove and replace approximately 1,800 square feet of concrete patio beneath the canopy entrance at the Chatham County Aquatic Center in Savannah. The scope of work includes subgrade preparation, installation of a moisture barrier, and the pouring of a reinforced concrete slab at least 4 inches thick with a minimum 3,000 PSI and a broom finish. Additionally, the contractor must install an underground drainage system using Schedule 40 PVC piping to route roof downspout water away from the structure. Key technical requirements include a specific grading slope, the use of a #3 rebar grid or heavy-duty welded wire mesh, and mandatory water testing of drain lines prior to concrete placement. The contract will be awarded to the responsible bidder who provides the best value based on price, responsibility, and past performance. Bidders must submit all required documentation, including Forms A-I and E-Verify affidavits, via the online procurement portal by November 6, 2026. Mandatory requirements for the selected contractor include maintaining liability and workman's compensation insurance, holding a current Chatham County Tax Certificate, and adhering to a 30% combined MBE/WBE participation goal. Payments are processed within 30 days of receiving an approved invoice, and work may only begin after the issuance of a written contract and a Notice to Proceed from the Purchasing Director.
Chatham County

POSTED

about 13 hours ago

DEADLINE

in 29 days
View Details

More opportunities from Florida → Public Works

Same awarding agency

NAICS: 541330
New
SLED
2702RFQ - Daytona Beach Replacement Pier Consultant
Solicitation # 2702RFQ
The City of Daytona Beach is seeking a highly qualified professional engineering consultant for the Daytona Beach Replacement Pier project. The objective is to design a new pier to replace the existing 1925 timber-framed structure, which has been found to not meet current design codes. The project requires a comprehensive design package including pier geometry, substructure and superstructure design, foundation layout, and demolition plans. A critical requirement is to maintain the historical value of the existing restaurant and preserve its location over the water; consequently, the new pier will be constructed independently, though the consultant must evaluate and provide recommendations for the restaurant's substructure. The selected consultant must complete all design and permitting phases within approximately 18 months, delivering conceptual renderings and construction plans at 60, 90, and 100 percent completion. Key requirements include compliance with FWC sea turtle lighting guidelines, FEMA funding requirements, and ADA standards. Award selection is based on best value, heavily weighting related experience in ocean environment concrete pier projects, the qualifications of a Florida-registered Professional Engineer as Project Manager, and expertise in pier constructability. The project is subject to various Florida Statutes and federal regulations, including prohibitions on contracting with foreign countries of concern and strict adherence to drug-free workplace and E-Verify certifications.
Engineering Services

POSTED

about 17 hours ago

DEADLINE

in 27 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS