Concrete Dam Construction (Main Structure)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Rancho California Water District involves the structural construction of a new straight-axis gravity concrete dam located in Temecula, California. The scope of work includes the installation of formwork, placement of reinforcement, and the execution of mass concrete pouring to deliver the completed dam structure. The project requires strict adherence to seismic and hydrologic remediation standards, as well as compliance with CEQA regulations and San Diego Water Board mitigation measures. This specialized construction effort falls under NAICS code 237990 and is designed to support prime contractors in meeting the technical and environmental requirements of the district.

General Info

Subcontract for structural construction of a concrete dam in Temecula, California.

Agency

Rancho California Water District

Place of Performance

Temecula, CA, 92592

Set-Aside

NONE

Documents

This scope was carved out of Vail Dam Seismic and Hydrologic Remediation Project [Project No. D1911].

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyRancho California Water District
ContactsNo contacts available
OfficeN/A
Organization / Agency
Rancho California Water District
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs structural construction of a new straight-axis gravity concrete dam for prime contractors on Rancho California Water District projects. Installs formwork, places reinforcement, and executes mass concrete pouring for a gravity dam structure. Adheres to seismic and hydrologic remediation standards, CEQA compliance, and San Diego Water Board mitigation measures. Delivers the completed straight-axis gravity concrete dam structure.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS