Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Vail Dam Seismic and Hydrologic Remediation Project [Project No. D1911]

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Vail Dam Seismic and Hydrologic Remediation Project, managed by the Rancho California Water District, involves the construction of a new straight axis gravity concrete dam located immediately downstream of the existing Vail Lake Dam in unincorporated southwestern Riverside County, east of Temecula, California. The primary objective of the replacement dam is to maintain a storage capacity and maximum reservoir level essentially equal to the levels existing prior to water level restrictions, which will result in a slight increase in lake surface area of approximately 0.66 acre between the two structures. The project is subject to strict environmental and regulatory compliance, including a Clean Water Act section 401 water quality certification issued by the San Diego Water Board. As a responsible agency, the San Diego Water Board approved the project on September 15, 2025, following the adoption of mitigation measures and a monitoring plan based on an environmental impact report prepared under CEQA. The project is classified under NAICS code 237990 and is currently listed as a forecast.

General Info

Construct new dam downstream of Vail Lake to restore reservoir capacity with full environmental compliance.

Agency

Rancho California Water District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Highway 79 and Vail Oak Road, Temecula, CA, 92592

Set-Aside

NONE

Documents

(1)

Vail Dam Seismic and Hydrologic Remediation Project Notice of Determination

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyRancho California Water District
Contacts2 people available
OfficeN/A
Organization / Agency
Rancho California Water District
Office AddressN/A
Contacts

Full Description

Show more
The Applicant proposes to construct a new straight axis gravity concrete dam immediately downstream of the existing Vail Lake Dam. The replacement dam will be constructed so the resultant storage capacity and maximum reservoir level will be essentially equal to the capacity and elevation prior to the water level restriction, with a slight increase in lake surface area of approximately 0.66 acre between the existing dam and the proposed dam. The San Diego Water Board issued a Clean Water Act section 401 water quality certification (Certification No. R9-2025-0122) to the Project Applicant. The Applicant proposes to construct a new straight axis gravity concrete dam immediately downstream of the existing Vail Lake Dam. The replacement dam will be constructed so the resultant storage capacity and maximum reservoir level will be essentially equal to the capacity and elevation prior to the water level restriction, with a slight increase in lake surface area of approximately 0.66 acre between the existing dam and the proposed dam.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The scope of work includes the dredging and ocean disposal of approximately 4,260 cubic yards of material, vegetation clearance, and stone rework for the revetted mole. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone Small Businesses, who are eligible for a price evaluation preference. Bidders must submit physical sealed envelopes by the deadline, as electronic submissions are prohibited. Required documentation includes SF 1442, the CLIN schedule, representations and certifications, and a bid guarantee. The contractor must provide key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Performance will be measured through pre- and post-dredge multi-beam surveys conducted by a third-party surveyor, and the contract includes liquidated damages of 2,297 dollars per calendar day of delay. Compliance with the Davis-Bacon Act and strict environmental and safety standards is required throughout the execution of the work.
Healy Tibbitts Builders, Inc.

POSTED

about 8 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project is a construction effort by Santa Rosa County, Florida, designed to remedy severe creek bank erosion and enhance storm resiliency. The scope of work involves the excavation of unsuitable materials and the stabilization of approximately 100 linear feet of streambank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. The project also includes an optional component, Bid Alternate A, which covers the repair of a damaged seawall along the western shore of the creek. All work must adhere to Santa Rosa County and FDOT standards, with technical oversight provided by Mott MacDonald. The contract is structured as a lump sum agreement with a substantial completion deadline of 120 calendar days and final completion within 150 calendar days from the notice to proceed. Financial terms include a 5% retainage on payments and liquidated damages of 1,685 dollars per day for delays. Bidders must provide a bid guarantee of 5% of the total price, and performance and payment bonds are required for contracts exceeding 200,000 dollars. The project is subject to various federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act for prevailing wages, and Florida Statutes Chapter 119 regarding public records. A reimbursement agreement with the Florida Fish and Wildlife Conservation Commission provides a maximum compensation limit of 375,000 dollars for the stabilization efforts.
Engineering

POSTED

about 11 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price construction contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include demolition, clearing and grubbing, excavation, placing embankment, installing separator geotextiles, placing graded stone, and turf establishment and maintenance. Bids are due by October 19, 2026, at 10:00 a.m., with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on unit prices, provided they are reasonable and balanced. The contractor must adhere to EM 385-1-1 safety standards and the Davis-Bacon Act for prevailing wages. Performance requirements include submitting a preliminary project schedule within 15 days and an initial schedule within 42 days of the Notice to Proceed. The contract includes liquidated damages of $4,295.00 per calendar day of delay and requires the use of approved testing laboratories for quality control. A project labor agreement is not required for this acquisition.
W07V Endist New Orleans

POSTED

about 12 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS