Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Noyo Center Marine Ecosystem Resiliency Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Noyo Center Marine Ecosystem Resiliency Project will advance resilience efforts at the Marine Field Station in Noyo Harbor, Fort Bragg, by implementing dock repairs as a direct extension of prior authorization. This phase follows earlier work that included studies and conceptual designs to adapt the facility and its infrastructure to sea level rise, as well as the preparation of 60 percent design plans for retrofitting the station and initiating aquaculture programs aimed at restoring the nearshore kelp forest ecosystem. The dock repair component is critical to ensuring safe and sustainable operational access to marine resources and supporting ongoing ecological restoration initiatives. The project is managed by the California State Coastal Conservancy with Amanda Townsel serving as the primary point of contact, and all work will be conducted at the established site in Mendocino County, where the Field Station serves as a hub for marine research and coastal conservation.

General Info

Dock repairs at Noyo Harbor to support marine resilience and kelp restoration, managed by California Coastal Conservancy.

Agency

California State Coastal Conservancy

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

32430 and 32420 North Harbor Drive, Fort Bragg, CA, 95437

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia State Coastal Conservancy
Contacts1 person available
OfficeN/A
Organization / Agency
California State Coastal Conservancy
Office AddressN/A
Contacts
Amanda TownselProject Manager

Full Description

Show more
The project will expand upon the previous authorization to include dock repair implementation at the Noyo Center’s Marine Field Station located at Noyo Harbor in Fort Bragg, Mendocino County. The previous authorization includes conducting studies and preparing conceptual designs for sea level rise adaptation of the Field Station and associated infrastructure, preparing 60% designs for retrofitting the Field Station, and implementing aquaculture programs to restore the nearshore kelp forest ecosystem.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Town of Chelsea Accessibility Ramp RFP
Solicitation # 75037
The Town of Chelsea is seeking qualified contractors to remove and replace an accessibility ramp at Town Hall with a new structure that fully complies with current ADA standards while maintaining visual harmony with the building’s historic character. The preferred design enables direct access from the main sidewalk and requires detailed proposals specifying material choices such as composite or pressure-treated lumber, along with the style of posts and balusters. Contractors must evaluate the condition of existing foundations and footings, replacing any that are structurally inadequate, and are responsible for all field measurements, demolition, and proper disposal of the old ramp. Site preparation is essential, including modifying the ground as needed to ensure stable installation, and all work must be performed with care to protect adjacent buildings, landscaping, and utilities from damage during construction. Bids must be submitted by August 28, 2026, under solicitation number 75037, with all technical and compliance details clearly outlined in the proposal. The project is administered by the Vermont Department of Economic Development, and inquiries should be directed to Grants@chelseavt.us or 802-625-2023. While the solicitation is open to all eligible contractors, there is no set-aside designation, and the place of performance is in Chelsea, Vermont. Proposals will be evaluated based on adherence to accessibility requirements, design compatibility with the historic structure, thoroughness of the scope, and the quality of material and construction plans presented.
Department of Economic Development

POSTED

about 10 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237990
New
Columbia Canal Embankment Repair Services
Solicitation # columbia-canal-embankment-repair-services
The City of Columbia is seeking contractors for the repair of the Columbia Canal embankment in Richland County, South Carolina, under solicitation number CIPDR 4241. This effort is targeted at restoring and stabilizing critical infrastructure along the canal, with work to be performed at the designated site in Columbia. The solicitation is set aside exclusively for small business concerns, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone firms, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses, ensuring opportunities for historically underrepresented and certified small entities. The North American Industry Classification System code for this project is 237990, indicating it falls under other heavy and civil engineering construction. Interested parties must submit responses by August 26, 2026, with inquiries directed to Chandler Worley of Phillips Heavy, Inc., the designated point of contact. The project has been posted through the U.S. Small Business Administration’s contracting portal and is administered under the agency’s efforts to promote equitable access to federal and municipal construction opportunities. While specific technical requirements are not detailed here, contractors are expected to have proven experience in civil earthwork, erosion control, and embankment stabilization to meet the structural and safety demands of the canal infrastructure. Further details and application instructions are available via the provided public link.
Phillips Heavy, Inc

POSTED

about 10 hours ago

DEADLINE

in 18 days
View Details