Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

American River Watershed, California, Folsom Dam Raise Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves reinforcing the guide beams and corbels on the upstream side of the main Folsom Dam in California, a minor 0.03-acre structural enhancement classified under a categorical exemption per California Code of Regulations Title 14 Section 15301 for existing facilities. The work aims to ensure compliance with current public safety standards for the dam infrastructure, with no significant environmental impact anticipated. The Regional Water Quality Control Board, Region 5 – Sacramento, serves as the lead agency overseeing the project, while the U.S. Army Corps of Engineers is identified as the executor. The place of performance is definitively located at Folsom Dam in Folsom, California, with geographic coordinates provided, but no formal contract number, solicitation details, or contract type has been assigned beyond a forecast notice posted on September 16, 2025. No contract value, cost estimates, pricing structures, or financial accounting data such as TAS, AAC, or ACRN are disclosed in the available documentation. The project relies on an approved Notice of Exemption filed on September 5, 2025, which serves as the primary regulatory documentation, but no formal contract clauses from FAR Part 52, evaluation factors for award, packaging and marking requirements, invoicing methods, or payment details are included. Key points of contact include Jenna Yang, Water Resource Control Engineer, and Chad Caldwell, District Commander, though no Contracting Officer, COR, or COTR are formally designated. No representations, certifications, or socioeconomic status data from potential offerors are present, and no instructions for proposals, submission deadlines, or delivery terms such as FOB are specified. The project remains in a pre-solicitation forecast stage with no formal procurement process yet initiated, and all delivery, inspection, acceptance, and performance timelines remain undefined.

General Info

Reinforce Folsom Dam’s upstream guide beams and corbels under categorical exemption, no formal contract yet.

Agency

California → Regional Water Quality Control Board, Region 5 - Sacramento

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Folsom, CA

Set-Aside

NONE

Documents

(1)

5A34CR00923 CEQA Notice of Exemption for Folsom Dam Raise Project

PDFceqa-notice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 5 - Sacramento
Contacts2 people available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 5 - Sacramento
Office AddressN/A
Contacts
Jenna YangWater Resource Control Engineer
Chad CaldwellDistrict Commander

Full Description

Show more
The 0.03-acre Project consists of reinforcing the guide beams and corbels of the upstream side of the main Folsom Dam.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details