Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Johnson Cosumnes Mitigation Bank Floodplain Restoration Project

Forecast
Permit No. 19943State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Johnson Cosumnes Mitigation Bank Floodplain Restoration Project, managed by the Central Valley Flood Protection Board, involves the construction of a 204-acre mitigation bank in Sacramento County, California. Located at 8700 Twin Cities Road near the confluence of Laguna Creek and the Cosumnes River, the project aims to restore wetland, riparian, and riverine habitats within the Cosumnes River floodway. Of the total area, 200 acres are intended to qualify for mitigation bank credits. The scope of work includes selectively notching agricultural berms along the mainstem and west branch of the Cosumnes River, constructing shallow swales and secondary pilot channels to improve floodplain flow, and implementing erosion control and revegetation efforts. Additionally, the project requires the redistribution of 30,200 cubic yards of native material to create an undulating floodplain surface. This project is classified under NAICS code 237990 and is currently listed as a forecast with a posted date of September 12, 2025. It has been granted a statutory exemption from the California Environmental Quality Act under Section 21080.56, as it focuses on restoring habitat for native fish and wildlife, a status concurred with by the California Department of Fish and Wildlife. Administrative oversight is provided by the Central Valley Flood Protection Board and Sacramento County, with key points of contact including Jordan Robbins and Julie Newton.

General Info

204-acre floodplain restoration in Sacramento County to create 200 credits via hydrologic reconnection and native habitat recovery.

Agency

California → Central Valley Flood Protection Board

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Central Valley Flood Protection Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → Central Valley Flood Protection Board
Office AddressN/A

Full Description

Show more
To construct a 204-acre mitigation bank, 200 acres of which quality for mitigation bank credits, by selectively notching the existing agricultural berms along the Cosumnes River ‘mainstem’ and the Cosumnes River ‘west branch’ and constructing a series of shallow swales and secondary pilot channels to promote flow onto and across the floodplain for the development, restoration, and protection of wetland, riparian, and riverine habitat within the Cosumnes River floodway. The project also includes revegetation, re-distributing 30,200 cubic yards of native material to form an undulating floodplain surface, and placement of erosion control.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 19 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

about 22 hours ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS