Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Routine Maintenance and Restoration Program

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The East Bay Regional Park District is undertaking a culvert replacement and ecological restoration project at the Stewartville Trail crossing over Sand Creek in Antioch, California, under its Routine Maintenance and Restoration Program. The existing culvert, dislodged during 2023 storms, will be replaced with a 60-inch-diameter by 30-foot-long corrugated metal pipe culvert, accompanied by headwall and tail-wall rock slope protection, energy dissipators, and downstream ecological stabilization measures. These include planting native vegetation and installing willow fascines to combat stream incision and restore riparian habitat. The project is governed under the California Environmental Quality Act, with a Negative Declaration issued and mitigation measures approved by the Central Valley Regional Water Quality Control Board, ensuring compliance with state environmental standards. All work is occurring within the Black Diamond Mines Regional Preserve and Contra Loma Regional Park in Contra Costa County. The contract, identified by solicitation number 5B07CR00271, was posted on September 11, 2025, and falls under NAICS code 237990 for other heavy and civil engineering construction. No federal acquisition regulation clauses, pricing data, payment details, or contract type specifications were identified in the documentation, indicating this is a state-level project managed without federal procurement structures. Point of contact includes Brook Vinnedge as Ecological Services Coordinator and Nicholas Savino as an Environmental Scientist with the Central Valley Regional Water Quality Control Board. While environmental compliance, mitigation performance, and monitoring are key requirements, there are no publicly available details regarding contract value, delivery schedules, invoicing methods, inspection procedures, or offeror certifications. The project emphasizes ecological restoration alongside infrastructure repair, aligning with the District’s broader maintenance goals and state environmental stewardship obligations.

General Info

Replace culvert and restore ecology at Stewartville Trail with native vegetation and rock protections under state environmental compliance.

Agency

California → East Bay Regional Park District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Antioch, CA

Set-Aside

NONE

Documents

(2)

Notice of Determination for BD_UC_701 Culvert Replacement Project

PDFnotice-of-determination

Notice of Determination for CL_RST_701 Pond Restoration Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → East Bay Regional Park District
Contacts2 people available
OfficeN/A
Organization / Agency
California → East Bay Regional Park District
Office AddressN/A
Contacts
Nicholas SavinoEnvironmental Scientist
Brook VinnedgeEcological Services Coordinator

Full Description

Show more
The existing culvert on the Stewartville Trail crossing Sand Creek was dislodged during storms in 2023, leaving the access road impassable. The project will replace the culvert with a 60-inch-diameter by 30-foot-long CMP culvert, and install new headwall rock slope protection (RSP), tail-wall RSP, and energy dissipators. Additionally, low-tech restoration activities, including planting native vegetation and installing willow fascines, will be conducted downstream to address downstream incision.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details