Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Martindale Mines Road Stream Crossing and Well Abandonment/Remediation Project (Lake or Streambed Alteration Agreement No. EPIMS-ALA-58605-R3)

Forecast
EPIMS-ALA-58605-R3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has executed Lake or Streambed Alteration Agreement EPIMS-ALA-58605-R3 with David Martindale for the Martindale Mines Road Stream Crossing and Well Abandonment/Remediation Project. Located in Alameda County within the Upper Arroyo Mocho watershed, the project is designed to remediate environmental impacts from cannabis cultivation activities that resulted in a Notice of Violation. The work is classified as a Class 4 Categorical Exemption for minor land alterations and must adhere to state and county abandonment guidelines. The scope of work consists of two specific encroachments. The first involves the abandonment of an existing well, which includes removing the impoundment, water pump, motor, pump column, bowl assembly, and existing water pipes. This process requires grout abandonment, capping the well to match existing specifications, and backfilling the excavation with compacted material to restore the natural streambed and native conditions. The second encroachment involves installing a low water crossing at the access road, which requires removing approximately 160 square feet of fill from the stream bed for off-site disposal and installing various gradations of river-rocks to stabilize the bed and minimize scour erosion. Project administration is managed by Kari Gahan, Senior Environmental Scientist with the Bay Delta Region office.

General Info

Authorization for well abandonment and streambed restoration at 23250 Mines Road under state environmental regulations.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

Place of Performance

Livermore, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Contacts1 person available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake or Streambed Alteration Agreement EPIMS Notification No. EPIMS-ALA-58605-R3, pursuant to Section 1602 of the Fish and Game Code to David Martindale. The project is limited to 2 encroachments. Encroachment one (1) is abandonment of an existing well. Work for this encroachment will include removal of the impoundment, water pump, fill, debris from the diversion site, restoration of the natural streambed, and removal of any existing water pipe. Work will follow state and county abandonment guidelines. The project will include removing the motor, pump column, bowl assembly and other existing well components. After the well has been properly filled, including sufficient time for sealing material in the excavation to set, the excavation shall be backfilled to finish grade with compacted material, to conform to native conditions. After grout abandonment, cap well, material and cap size to match existing. Encroachment two (2) is to install a low water crossing. Work for this encroachment consists of installing a low water crossing at the access road. Fill will be removed from the stream bed, approximately 160 square feet (ft²) in surface area. Fill will be disposed of off-site. River-rocks shall be installed in the re-established flowline to facilitate natural bed and channel, and to avoid or minimize scour erosion in the stream. Placement of rocks will be at various gradations and sizes to allow rocks to lock together and form a stabilized bed. The encroachments are associated with the remediation of cannabis cultivation activities that resulted in a Notice of Violation.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 19 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

about 22 hours ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS