Boggs Tract Drainage

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Boggs Tract Drainage project, managed by the San Joaquin County Department of Public Works, aims to resolve poor storm drainage and roadway flooding near the intersection of West Main Street and Ventura Avenue in California. The project involves expanding an existing temporary retention pond located on parcels owned by the Port of Stockton to increase stormwater runoff capacity. Key deliverables include executing a property use agreement with the Port of Stockton and the contractor obtaining necessary Encroachment and Grading and Erosion Control permits from the City of Stockton. The project is classified under NAICS code 237990 and is currently listed as a forecast with a posted date of September 9, 2025. Due to the mixed residential and industrial environmental setting, specific protections are required for migratory birds and the threatened Swainson's Hawk. A pre-construction survey is recommended if work occurs between February 15th and September 1st. The project has been granted a categorical exemption from environmental filing fees under Section 15301(c) for existing facilities, as it enhances drainage without adding new vehicle lanes. Fatima Gutierrez, Assistant Planner, serves as the primary point of contact.

General Info

Expand retaining pond near Stockton to improve stormwater management with permits and environmental safeguards.

Agency

California → San Joaquin County

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Main Street, South Ventura Avenue, West Washington Street, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Boggs Tract Drainage Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Joaquin County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Joaquin County
Office AddressN/A
Contacts
Fatima GutierrezAssistant Planner

Full Description

Show more
Project Location: Near the intersection of West Main Street and Ventura Avenue. See attached Vicinity Map. Project Justification: There is currently poor storm drainage in the Boggs Tract area, and the roadways will flood in heavy rains. The existing retention pond was constructed as a temporary solution to collect stormwater runoff. This project will expand the existing pond to collect much more runoff. Scope of Work: The project will consist of: 1. Expanding an existing retention pond on Port of Stockton owned parcels on Ventura Avenue in Boggs Tract. 2. Executing an agreement with the Port of Stockton for use of the property. 3. Obtaining an Encroachment permit and Grading & Erosion Control permit from the City of Stockton by the Contractor. Environmental Setting: In these portions of the San Joaquin County, land usage is mixed between residential and industrial. There are many large trees adjacent to the project area. Nesting and migratory birds, protected by the Migratory Bird Treaty Act, may nest within these trees. Furthermore, the Swainson’s Hawk, a raptor species of concern within the State of California and listed as threatened may nest adjacent to or within the project area. A pre-construction survey for nesting Swainson’s Hawks and other migratory birds is recommended if construction is scheduled to occur from February 15th to September 1st. Beneficiaries: The public will see increased safety and fewer hazards with this expansion of an existing retention pond. Overall, there will be reduced maintenance concerns and more reliability within the project area.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 22 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS