Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Former High Desert Hospital Site Demolition Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Former High Desert Hospital Site Demolition Project, managed by Los Angeles County Public Works, involves the complete demolition of the former High Desert Hospital and its surrounding ancillary structures. The scope includes the removal of 22 structures totaling over 300,000 square feet, including hospital buildings, modular units, trailers, and sheds, located at 44900 60th Street West in Lancaster, California. Following the demolition, the project requires the construction of two stormwater retention basins. The work will take place on 14.2 acres within a larger 361-acre county-owned site, and the final project state will leave no buildings or structures remaining. The project was approved on August 5, 2025, and is classified under NAICS code 237990. A Negative Declaration was prepared in accordance with CEQA, confirming that the project will not have a significant environmental effect. Administrative filing for the Notice of Determination was completed on August 14, 2025. Teresa Chan, Capital Projects Manager with the Public Agency Project Management Division, serves as the primary point of contact for the project.

General Info

Demolish 22 structures on 14.2-acre site, install stormwater basins, comply with CEQA Negative Declaration.

Agency

California → Los Angeles County Public Works

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

West Avenue I and 60th Street West, Lancaster, CA, 93536

Set-Aside

NONE

Documents

(1)

NOD Former High Desert Hospital Site Demolition Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles County Public Works
Contacts1 person available
OfficeN/A
Organization / Agency
California → Los Angeles County Public Works
Office AddressN/A
Contacts
Teresa ChanCapital Projects Manager

Full Description

Show more
The County of Los Angeles, acting through Public Works proposes to demolish the former High Desert Hospital and surrounding ancillary structures and construct two stormwater retention basins at the former High Desert Hospital site, located at 44900 60th Street West, in the City of Lancaster, California. All the facilities and structures, totaling 22 structures of more than 300,000 square feet of hospital, ancillary services, and miscellaneous ancillary structures (such as trailers, sheds, modular buildings, container, etc.), would be demolished. No buildings or structures would remain following the Project. The Project would occur on 14.2 acres and is located within an approximately 361-acre Los Angeles County (County) owned site. The Project site is not listed on a site that is included on any list compiled pursuant to Section 65962.5 of the Government Code for hazardous waste sites.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 22 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS