Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Apple Campus 2

Forecast
20110820055State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Apple Campus 2 project, managed by the City of Cupertino, involves modifications to the Apple Park campus in Cupertino, California. These updates, approved on September 3, 2025, under the Tenth Addendum to the Final Environmental Impact Report, focus on infrastructure enhancements without expanding the campus boundary or increasing the number of employees and parking spaces. The scope of work includes the installation of three new electric generators and six battery storage units within the utility yard, the construction of a 13-foot retaining wall for noise attenuation and grading, and the relocation of nine parking spaces from the Apple South Parking Structure to a new area northwest of the Central Utility Plant to maintain the existing parking supply. The project is expected to be completed over approximately 12 months, encompassing site preparation, grading, utility yard expansion, equipment installation, and commissioning. Key operational details include the removal of 3,000 cubic yards of cut material and the requirement that all construction staging occur within the campus to avoid street closures. All existing trees along the southern boundary will be protected. The City of Cupertino has certified that these modifications result in no significant environmental effects, and all original mitigation measures from the Final EIR remain in effect.

General Info

Apple Park adds generators, batteries, retaining wall; no boundary expansion, no parking increase, all work within existing disturbed areas.

Agency

California → City of Cupertino

Place of Performance

East Homestead Road (N), North Tantau Ave. (E), I-280 (S), North Wolfe Road (W) Zip 95014, Cupertino, CA, 95014

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Cupertino
Contacts2 people available
OfficeN/A

Full Description

Show more
The Apple Campus 2 Project Final Environmental Impact Report (Final EIR) was certified by the City of Cupertino on October 15, 2013. The approved Apple Campus 2 (now called Apple Park) project included demolition of all existing structures within the project site and the construction of 3,420,000 square feet of office, research, and development uses; 245,000 square feet of auditorium, fitness center, and valet parking reception uses; 92,000 square feet of utility plants; and parking and ancillary buildings. The impacts associated with the modified project were analyzed in the Final EIR. Modifications to the Apple Park campus were proposed and included in the Site Plans and Project Application submitted to the City of Cupertino (City) by Apple Inc. (project sponsor) in July 2025 and were analyzed in the Tenth Addendum to the Final EIR. The minor changes requested in the Application involve: (1) the installation of three new electric generators and six new battery storage units, along with associated infrastructure improvements, within and adjacent to the existing utility yard footprint; (2) the removal of nine parking spaces within the Apple South Parking Structure to accommodate conduit routing, with construction of nine replacement stalls northwest of the Central Utility Plant to maintain the current parking supply; and (3) the construction of a 13-foot retaining wall around the proposed Battery Yard to accommodate site grading and provide noise attenuation. The modified project would not expand the campus boundary, result in ground disturbance outside of the previously evaluated area, or increase the number of employees or parking spaces on campus. All trees along the southern boundary of the project site would be protected in place. Construction would occur over approximately 12 months and include site preparation, grading, utility yard expansion, equipment installation, and commissioning. Approximately 3,000 cubic yards of cut material would be hauled off site, and all construction staging would occur within the Apple Park campus with no anticipated street closures.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 20 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

about 23 hours ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS