Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Illana Pond Spillway Improvements (Project) (Notification of Lake or Streambed Alteration, No. EPIMS-MEN-59015-R1C)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Illana Pond Spillway Improvements project, associated with Notification of Lake or Streambed Alteration No. EPIMS-MEN-59015-R1C, involves critical infrastructure enhancements to an existing on-stream pond located in the North Fork Noyo River watershed in Mendocino County, California. Situated approximately 8 miles northwest of Willits, the project is approved by the California Department of Fish and Wildlife and is being carried out by permittee Guillermo Illana. The work is classified as a categorical exemption under Class 1 of the California Code of Regulations, title 14, section 15301, as it focuses on repair and maintenance with negligible expansion of use. The technical scope of work is limited to one encroachment and consists of the excavation of material from the existing spillway followed by the installation of a riprap spillway measuring 6 feet wide, 2 feet deep, and 10 feet long. Additionally, the project requires the installation of a velocity dissipator measuring 8 feet wide and between 8 to 12 feet in length. Administrative oversight is provided by Environmental Scientist Penny Lancaster of the California Department of Fish and Wildlife.

General Info

Minor spillway repair with riprap and dissipator at Willits pond, exempt from environmental review, managed by CDFW.

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

approximately 8 miles NW of the town of Willits, Willits, CA

Set-Aside

NONE

Documents

(1)

EPIMS-MEN-59015-R1C Illana Pond Spillway Improvements Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
Contacts
Penny LancasterEnvironmental Scientist
Guillermo IllanaPlease contact Penny Lancaster of CDFW

Full Description

Show more
The Project is limited to one encroachment for improvements to the spillway of an existing on-stream pond. Work for the spillway will include excavation of material from the existing spillway, and installation of a 6-foot-wide, by 2-foot-deep and 10-foot-long riprap spillway, and 8-foot-wide by 8 to 12-foot long velocity dissipator.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes the dredging and ocean disposal of approximately 4,260 cubic yards of material, with disposal at an approved offshore site south of Oahu. Additionally, the contractor will perform revetted mole repairs involving clearing and grubbing, vegetation and root removal, stone rework, and filling voids with additional stone. The estimated value of the work ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This solicitation is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Bidders must provide a bid guarantee and are required to furnish performance and payment bonds upon award. Key deliverables include pre- and post-dredge multi-beam surveys conducted by a third-party qualified surveyor and the submission of an operations plan within 30 days of the Notice to Proceed. The contract mandates strict adherence to USACE accuracy standards and quality control measures, including a punch-out inspection and final acceptance inspection. Liquidated damages for delays are set at 2,297 dollars per calendar day. Bids must be submitted in sealed envelopes to the Fort Shafter office, as electronic submissions are not permitted.
Healy Tibbitts Builders, Inc.

POSTED

about 4 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237990
New
SLED
Reclamation District No. 1600 DMP Drainage Pipe Replacement ProjectReclamation District 1600 is undertaking the Deferred Maintenance Program Drainage Pipe Replacement Project in Yolo County, California. The project consists of the in-kind replacement of a single 48-inch gravity drainage pipe located southeast of Knights Landing along the Tule Canal at Levee Mile 0.36. The primary objective is to maintain the existing pipe size, function, and alignment to ensure the continued conveyance of water from agricultural lands east of Woodland to the Tule Canal within the Yolo Bypass. Construction is scheduled to begin on August 3, 2026, with a phased timeline including mobilization, site preparation, excavation and demolition, pipe installation, levee restoration, and final demobilization. The project has undergone a comprehensive environmental review under the California Environmental Quality Act, resulting in a Mitigated Negative Declaration. This assessment determined that there are no significant unmitigable environmental impacts, provided that specific avoidance and minimization measures are implemented. Key requirements for the contractor include mandatory worker environmental awareness training, the installation of temporary exclusion fencing to protect aquatic habitats, the execution of a Spill Prevention, Containment, and Countermeasure Plan, and adherence to strict in-water work windows. Additionally, the contractor must utilize vibratory pile drivers for cofferdams and maintain daily inspections of silt curtains to control turbidity in compliance with Basin Plan standards and Cal-OSHA safety requirements.
Reclamation District 1600

POSTED

about 13 hours ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS