Illana Pond Spillway Improvements (Project) (Notification of Lake or Streambed Alteration, No. EPIMS-MEN-59015-R1C)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves targeted improvements to the spillway of an existing on-stream pond located approximately eight miles northwest of Willits, California, within the North Fork Noyo River watershed. Work is limited to one encroachment and consists of excavating material from the existing spillway and installing a new riprap structure measuring six feet wide by two feet deep by ten feet long, along with an eight-foot-wide velocity dissipator extending between eight and twelve feet in length. The activity is classified as minor repair and maintenance under California Code of Regulations, Title 14, Section 15301, which provides a categorical exemption from environmental review because it does not expand the facility’s use or footprint. The project is managed by the California Department of Fish and Wildlife, Region 1 – Northern Region, with Penny Lancaster serving as the primary point of contact as an Environmental Scientist. No formal contract solicitation, pricing, or financial details are provided, and the document reflects a forecast notice rather than an active procurement. The place of performance is strictly defined as the pond site in Willits, with all inspection and acceptance occurring on-site under the oversight of CDFW. The work is not subject to federal acquisition regulations as no FAR clauses, contracting clauses, payment terms, or invoicing requirements are present, and the project operates under state environmental permitting authority with EPIMS-MEN-59015-R1C as the referenced alteration notification. No bids, proposals, or contractor qualifications are solicited in this document, and there are no specifications for packaging, marking, delivery terms, or socioeconomic set-asides.

General Info

Minor spillway repair with riprap and dissipator at Willits pond, exempt from environmental review, managed by CDFW.

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

approximately 8 miles NW of the town of Willits, Willits, CA

Set-Aside

NONE

Documents

(1)

EPIMS-MEN-59015-R1C Illana Pond Spillway Improvements Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
Contacts
Penny LancasterEnvironmental Scientist
Guillermo IllanaPlease contact Penny Lancaster of CDFW

Full Description

Show more
The Project is limited to one encroachment for improvements to the spillway of an existing on-stream pond. Work for the spillway will include excavation of material from the existing spillway, and installation of a 6-foot-wide, by 2-foot-deep and 10-foot-long riprap spillway, and 8-foot-wide by 8 to 12-foot long velocity dissipator.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.