Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Mullins Boatlift/Pier (Lake Alteration Agreement EPIMS Notification No. LAK- 57427-R2)

Forecast
LAK-57427-R2State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has executed Lake Alteration Agreement EPIMS Notification No. LAK-57427-R2, pursuant to Section 1602 of the Fish and Game Code, for project applicant Scott Barnett. Located at 9407 Konotti Bay Rd in Kelseyville, California, the project involves the construction of a 10 foot by 20 foot swim platform and a 17 foot by 30 foot covered boat lift, both connected to a 5 foot by 35 foot pier via 3 foot by 24 foot gangways. The structures will be supported by 13 pilings of 8 inch diameter, installed using a free fall hammer method with a soft start. To minimize environmental impact, the agreement prohibits digging or drilling and requires the pier to be attached to an existing seawall. All construction activities must be conducted within the lake using barges and pontoon boats, with material staging and launching occurring at 1 Clearlake Avenue or 1624 Parallel Dr. The project is categorically exempt under California Code of Regulations Title 14, sections 15303 and 15304, as it consists of minor land alterations and small accessory structures without the removal of significant vegetation. Administrative oversight is provided by Environmental Scientist Claire Bryant and Environmental Program Manager Tanya Sheya.

General Info

Scott Barnett authorized to build swim platform, boat lift, and pier on Clear Lake with no excavation, under state permit.

Agency

California → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova

Place of Performance

CA, 95451

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova
Office AddressN/A

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake Alteration Agreement EPIMS Notification No. LAK-57427-R2, pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Scott Barnett. The project is limited to construction of a 10 foot by 20 foot swim platform and a 17 foot by 30 foot covered boat lift, each connected to a 5 foot by 35 foot long pier using 3 foot by 24 foot gangways. The platform, boat lift and piers will be supported by a total of 13, 8 inch diameter pilings, driven using a free fall hammer method with a soft start. No digging or drilling will be used. The pier will be attached to an existing seawall. No vegetation is present in the impacted areas. All construction activities will be performed in the lake with the use of pontoon boats and barge. 1 Clearlake Avenue or 1624 Parallel Dr will be used for launching and staging materials on the barge.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 20 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

about 23 hours ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS