Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Washington Ave. SD Line

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Washington Ave. SD Line project is a minor storm drain infrastructure improvement by the City of San Leandro, California, designed to install a new storm drainage line along Thornton Street, connecting an existing inlet at the intersection of Washington Avenue and Thornton Street to a manhole at Thornton Street and Hays Street. The work is confined entirely within the existing right-of-way and is classified under a CEQA Categorical Exemption (Section 15301(C1)), confirming no significant environmental impact and eliminating the need for an environmental impact report. Administrative compliance is managed through the Alameda County Clerk’s office, with a required $50 filing fee and submission of five copies of environmental exemption documents either by mail or in person by the August 19, 2025 deadline. The lead point of contact is Iman M. Fawzy, Assistant Engineer, who serves as the project’s primary representative, with no formal contracting officer, COR, or COTR identified. Payment for fees must be made via check payable to Alameda County Clerk, but no contract value, line item pricing, or invoicing instructions are specified, indicating this is a forecasted project without a formal award or funded contract yet established. There is no mention of FAR clauses, federal acquisition regulations, military standards, packaging, marking, preservation, or evaluation factors, as the project is governed solely by state-level environmental compliance procedures under CEQA. The place of performance is clearly defined as San Leandro, CA, 94577, and no delivery, FOB, or performance schedule details beyond the filing deadline are provided, suggesting the activity is a local infrastructure enhancement executed under administrative oversight with minimal procurement formalities.

General Info

San Leandro installs storm drain line under CEQA exemption, filing deadline August 19, 2025, no contract value specified.

Agency

California → City of San Leandro

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Segment of Thornton Street between Washington Ave. and Hays St., San Leandro, CA, 94577

Set-Aside

NONE

Documents

(1)

Alameda County Notice of Exemption for Washington Ave. SD Line Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Leandro
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of San Leandro
Office AddressN/A
Contacts
Iman M. FawzyAssistant Engineer

Full Description

Show more
The Washington Ave. SD line project proposes to add a line of Storm drain along Thornton Street connecting an inlet and a manhole. The line will start at an inlet at the intersection of Washington ave and Thornton St. and will end at a manhole at the intersection of Thornton St. and Hays St.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details