Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Miller Road Trench Soil Management Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Miller Road Trench Soil Management Project, identified as project number 21215-10, is led by the East Bay Municipal Utility District to support the proactive replacement and rehabilitation of critical water system infrastructure in Alameda County. The project involves the continued operation of two primary sites: the Miller Road stockpile site for the import, temporary storage, and periodic removal of trench soil, and a separate rock and sand stockpile site used for backfill materials. These operations are designed to accommodate an increase in annual pipeline replacement from 20 to 25 miles to approximately 30 miles by 2030. The scope of work includes the use of excavators, D6 and D8 dozers, water trucks, and sweepers for stockpile management and off-haul events. Operational activities include daily trench soil imports, biweekly backfill material imports, and periodic off-haul events occurring every one to five years. The project has undergone environmental review under the California Environmental Quality Act, resulting in a Mitigated Negative Declaration certifying that no significant adverse environmental impacts will occur, provided that mitigation measures for transportation and wildfire are implemented. Compliance requirements include adherence to the Stormwater Pollution Prevention Plan, the Habitat Conservation Plan for erosion control, and strict hazardous materials management in accordance with RCRA, U.S. DOT, OSHA, and CAL OSHA regulations. Additionally, the project requires a performance bond for future remediation and mandates that off-haul contractors follow enforceable provisions regarding vehicle idling, dust control, and load covering.

General Info

EBMUD manages trench soil and backfill storage and hauls for pipeline expansion, with strict environmental compliance and weekday operations only.

Place of Performance

2 miles north of the intersection of Miller Road and Redwood Road, CA, 94546

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Interested Companies (1)

Panorama EnvironmentalSan Francisco, CA

Full Description

Show more
The Miller Road stockpile site supports EBMUD's efforts to proactively replace and rehabilitate critical water system infrastructure. Annual pipeline replacement is estimated to increase from 20 to 25 miles per year to approximately 30 miles per year by 2030. There is a need to increase the stockpiling and storage of materials to support this increase in pipeline replacement needs. The Project involves the continued operation of the Miller Road stockpile site, including import, temporary storage, and periodic removal of trench soil. The Project also includes continued operation of the rock and sand stockpile site located approximately 1 mile south of the Miller Road soil stockpile site on EBMUD-owned property within the Project site. Materials from the rock and sand stockpile site are used to backfill trenches from the pipeline construction and maintenance activities. Continued operation of the rock and sand stockpile site includes import, temporary storage, and removal of these backfill materials. The Project includes a gradual increase in the volume of trench soil stockpiled at the Miller Road site, routine removal of stockpiled trench soil (off-haul events), and an increase in the Import and off-haul of backfill materials to and from the rock and sand stockpile site.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 20 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

about 23 hours ago

DEADLINE

in 29 days
View Details

More opportunities from California → East Bay Municipal Utility District

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS