Miller Road Trench Soil Management Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Miller Road Trench Soil Management Project, identified as project number 21215-10, is led by the East Bay Municipal Utility District to support the proactive replacement and rehabilitation of critical water system infrastructure in Alameda County. The project involves the continued operation of two primary sites: the Miller Road stockpile site for the import, temporary storage, and periodic removal of trench soil, and a separate rock and sand stockpile site used for backfill materials. These operations are designed to accommodate an increase in annual pipeline replacement from 20 to 25 miles to approximately 30 miles by 2030. The scope of work includes the use of excavators, D6 and D8 dozers, water trucks, and sweepers for stockpile management and off-haul events. Operational activities include daily trench soil imports, biweekly backfill material imports, and periodic off-haul events occurring every one to five years. The project has undergone environmental review under the California Environmental Quality Act, resulting in a Mitigated Negative Declaration certifying that no significant adverse environmental impacts will occur, provided that mitigation measures for transportation and wildfire are implemented. Compliance requirements include adherence to the Stormwater Pollution Prevention Plan, the Habitat Conservation Plan for erosion control, and strict hazardous materials management in accordance with RCRA, U.S. DOT, OSHA, and CAL OSHA regulations. Additionally, the project requires a performance bond for future remediation and mandates that off-haul contractors follow enforceable provisions regarding vehicle idling, dust control, and load covering.

General Info

EBMUD manages trench soil and backfill storage and hauls for pipeline expansion, with strict environmental compliance and weekday operations only.

Agency

California → East Bay Municipal Utility District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

2 miles north of the intersection of Miller Road and Redwood Road, CA, 94546

Set-Aside

NONE

Documents

(4)

Miller Road Trench Soil Management Project Initial Study/Mitigated Negative Declaration Final August 2025

PDFmitigated-negative-declaration

Miller Road Trench Soil Management Project Notice of Completion

PDFnotice-of-completion

Notice of Determination - Miller Road Trench Soil Management Project

PDFnotice-of-determination

Miller Road Trench Soil Management Project Final MND Notice of Availability

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → East Bay Municipal Utility District
Contacts2 people available
OfficeN/A
Organization / Agency
California → East Bay Municipal Utility District
Office AddressN/A
Contacts
Gus CicalaSenior Civil Engineer

Interested Companies (1)

Show more
Panorama Environmental
San Francisco, CA

Full Description

Show more
The Miller Road stockpile site supports EBMUD's efforts to proactively replace and rehabilitate critical water system infrastructure. Annual pipeline replacement is estimated to increase from 20 to 25 miles per year to approximately 30 miles per year by 2030. There is a need to increase the stockpiling and storage of materials to support this increase in pipeline replacement needs. The Project involves the continued operation of the Miller Road stockpile site, including import, temporary storage, and periodic removal of trench soil. The Project also includes continued operation of the rock and sand stockpile site located approximately 1 mile south of the Miller Road soil stockpile site on EBMUD-owned property within the Project site. Materials from the rock and sand stockpile site are used to backfill trenches from the pipeline construction and maintenance activities. Continued operation of the rock and sand stockpile site includes import, temporary storage, and removal of these backfill materials. The Project includes a gradual increase in the volume of trench soil stockpiled at the Miller Road site, routine removal of stockpiled trench soil (off-haul events), and an increase in the Import and off-haul of backfill materials to and from the rock and sand stockpile site.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 8 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 20 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS