Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Miller Road Trench Soil Management Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Miller Road Trench Soil Management Project is an ongoing operational initiative by the East Bay Municipal Utility District (EBMUD) to support the expansion of water infrastructure rehabilitation efforts across its service area. As pipeline replacement goals increase from 20 to 25 miles annually toward 30 miles by 2030, the project ensures adequate stockpiling and management of materials, primarily trench soil and backfill aggregates like rock and sand. Operations occur across two adjacent EBMUD-owned sites: the Miller Road site handles temporary storage and periodic off-haul of excavated trench soil, while a nearby site one mile south manages the import, storage, and removal of backfill materials used to refill trenches after pipeline work. The project involves a planned ramp-up in material volumes, including more frequent off-haul events for soil and increased imports and removals of backfill, all coordinated to align with construction schedules. Activity is restricted to weekday operations, with off-haul events typically spanning one month, and material transport occurs along designated routes to minimize community disruption, particularly near schools and residential areas. Environmental and operational compliance are central to the project’s execution. All activities are governed by strict mitigation measures outlined under the California Environmental Quality Act (CEQA), including a Mitigation Monitoring and Reporting Program requiring real-time oversight by EBMUD inspectors during every off-haul event. Contractors must adhere to dust control protocols, including covered truckloads, speed restrictions, idling limits, and weekly street sweeping along haul routes. Air quality impacts are modeled using CalEEMod v2022.1, with noise emissions required to stay below 66 dBA and ideally under 58 dBA at receptor locations. Soil must be characterized to ensure no contaminated material enters the stockpiles, and all transport complies with Stormwater Pollution Prevention Plan requirements. The project also includes protections for special-status species such as Crotch’s bumble bee, burrowing owl, San Joaquin kit fox, and California red-legged frog, with measures in place to avoid harm to their habitats. While no formal contract pricing, FAR clauses, or evaluation factors are provided, the operational scope is supported by enforceable site-specific conditions, including driver acknowledgments, route coordination with local agencies, and potential penalties for violations ranging from warnings to permanent site banishment. EBMUD retains full oversight as the lead agency, with Gus Cicala serving as the primary point of contact, and project documentation is publicly accessible via EBMUD’s website with adoption of the Final

General Info

EBMUD manages trench soil and backfill storage and hauls for pipeline expansion, with strict environmental compliance and weekday operations only.

Agency

California → East Bay Municipal Utility District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

2 m north of Miller Road and Redwood Road, Castro Valley, Alameda, Alameda, CA

Set-Aside

NONE

Documents

(4)

Miller Road Trench Soil Management Project Initial Study/Mitigated Negative Declaration Final August 2025

PDFmitigated-negative-declaration

Miller Road Trench Soil Management Project Notice of Completion

PDFnotice-of-completion

Notice of Determination - Miller Road Trench Soil Management Project

PDFnotice-of-determination

Miller Road Trench Soil Management Project Final MND Notice of Availability

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → East Bay Municipal Utility District
Contacts1 person available
OfficeN/A
Organization / Agency
California → East Bay Municipal Utility District
Office AddressN/A
Contacts
Gus CicalaSenior Civil Engineer

Interested Companies (1)

Show more
Panorama Environmental
San Francisco, CA

Full Description

Show more
The Project involves the continued operation of Miller Road trench soil stockpile site, including import, temporary storage, and periodic off-hauls of trench soil excavated from EBMUD pipeline construction and maintenance activities. In addition to the trench soil, the Project includes continued operation of the rock and sand stockpile site involving import, temporary storage, and removal of these backfill materials used for backfilling trenches from the pipeline construction and maintenance activities.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Town of Chelsea Accessibility Ramp RFP
Solicitation # 75037
The Town of Chelsea is seeking qualified contractors to remove and replace an accessibility ramp at Town Hall with a new structure that fully complies with current ADA standards while maintaining visual harmony with the building’s historic character. The preferred design enables direct access from the main sidewalk and requires detailed proposals specifying material choices such as composite or pressure-treated lumber, along with the style of posts and balusters. Contractors must evaluate the condition of existing foundations and footings, replacing any that are structurally inadequate, and are responsible for all field measurements, demolition, and proper disposal of the old ramp. Site preparation is essential, including modifying the ground as needed to ensure stable installation, and all work must be performed with care to protect adjacent buildings, landscaping, and utilities from damage during construction. Bids must be submitted by August 28, 2026, under solicitation number 75037, with all technical and compliance details clearly outlined in the proposal. The project is administered by the Vermont Department of Economic Development, and inquiries should be directed to Grants@chelseavt.us or 802-625-2023. While the solicitation is open to all eligible contractors, there is no set-aside designation, and the place of performance is in Chelsea, Vermont. Proposals will be evaluated based on adherence to accessibility requirements, design compatibility with the historic structure, thoroughness of the scope, and the quality of material and construction plans presented.
Department of Economic Development

POSTED

about 10 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237990
New
Columbia Canal Embankment Repair Services
Solicitation # columbia-canal-embankment-repair-services
The City of Columbia is seeking contractors for the repair of the Columbia Canal embankment in Richland County, South Carolina, under solicitation number CIPDR 4241. This effort is targeted at restoring and stabilizing critical infrastructure along the canal, with work to be performed at the designated site in Columbia. The solicitation is set aside exclusively for small business concerns, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone firms, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses, ensuring opportunities for historically underrepresented and certified small entities. The North American Industry Classification System code for this project is 237990, indicating it falls under other heavy and civil engineering construction. Interested parties must submit responses by August 26, 2026, with inquiries directed to Chandler Worley of Phillips Heavy, Inc., the designated point of contact. The project has been posted through the U.S. Small Business Administration’s contracting portal and is administered under the agency’s efforts to promote equitable access to federal and municipal construction opportunities. While specific technical requirements are not detailed here, contractors are expected to have proven experience in civil earthwork, erosion control, and embankment stabilization to meet the structural and safety demands of the canal infrastructure. Further details and application instructions are available via the provided public link.
Phillips Heavy, Inc

POSTED

about 10 hours ago

DEADLINE

in 18 days
View Details