POINT LOMA WASTEWATER TREATMENT PLANT SLOPE FAILURE EMERGENCY
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → City of San Diego
NAICS
237990 - Other Heavy and Civil Engineering ConstructionView NAICS
Place of Performance
San Diego, CASet-Aside
NONE
Timeline
Organization & Contact Information
Show more
AgencyCalifornia → City of San Diego
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of San Diego
Office AddressN/A
Contacts
Full Description
Show more
A visual Inspection of the PLWWTP facility revealed voids within a brow ditch and a failed slope caused by the January 2024 rain events. The project will repair and replace sections of the brow ditch and existing retaining wall, stabilize and revegetate
the failed slope, and construct a rockfall protection wall to protect the facility from falling debris along the slope. Failure to conduct these repairs and incorporate protective measures Increases the likelihood of future flooding and erosion, Impacts on essential public facilities, and threatens life and safety. The proposed work Is the minimum necessary to stabilize the failed slope and protect and ensure adequate operating capacity at the PLWWTP. Following completion of work, all areas impacted by the emergency will be restored to their pre-Impact condition
to the maximum extent feasible, including restoration of any environmentally sensitive habitat impacted by the project. Revegetation of areas disturbed by project work will be completed in accordance with the City's Landscape Standards. A portion of the project is located within the City's Multi-Habitat Planning Area (MHPA) and
will be required to comply with the City's Multiple Species Conservation Program (MSCP) General Planning Policies and Design Guidelines and Land Use Adjacency Guidelines, as specified In Section 1.4.3 of the MSCP Subarea Plan, A subsequent Site Development Permit (SDP) will be required per Section 143.0126 ·of the Land
Development Code if the emergency work permanently Impacts Environmentally Sensitive Lands.