Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Pipe Replacement Deferred Maintenance Program – Additional Locations

Forecast
39-09022025-253State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Pipe Replacement Deferred Maintenance Program - Additional Locations is a project managed by the San Joaquin County Department of Public Works to address threats to levee integrity and reduce catastrophic flooding risks. The project focuses on three levee locations, with one site on Bear Creek and two on North Paddy Creek. The primary objective is to remove and replace aging drainage pipes and appurtenant structures, specifically targeting those greater than 6 inches in diameter located below the levee freeboard. All replacement work must be designed and constructed in accordance with Title 23 and United States Army Corps of Engineers design standards, utilizing reinforced concrete pipe backfilled with controlled low-strength material. Environmental considerations are a critical component of the project due to the rural setting and the presence of protected wildlife. Because the project area may contain nesting migratory birds and the threatened Swainson's Hawk, a pre-construction survey is recommended for any work scheduled between February 15th and September 1st to ensure compliance with the Migratory Bird Treaty Act and California state regulations. The project is categorized under NAICS code 237990 and is currently identified as a forecast with a Notice of Exemption filed under CEQA. Administrative oversight is provided by Fatima Gutierrez, Assistant Planner for San Joaquin County.

General Info

Replace aging drainage pipes at three levees in San Joaquin County to mitigate flood risk and comply with environmental and engineering standards.

Agency

California → San Joaquin County

Place of Performance

Eight Mile Road, Harney Lane, Kettleman Lane, Jack Tone Road, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Joaquin County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Joaquin County
Office AddressN/A

Full Description

Show more
PIPE REPLACEMENT DEFERRED MAINTENANCE PROGRAM – ADDITIONAL LOCATIONS Project Description Project Location: Three levee locations, one on Bear Creek and two on North Paddy Creek. See attached Vicinity Map. Project Justification: The California Department of Water Resources (DWR) Deferred Maintenance Project (DMP) was initiated in 2017 to evaluate, repair, and/or rehabilitate documented levee pipe penetrations. The purpose of this project was to address known threats to levee integrity, enhance emergency response capabilities, and reduce the potential for catastrophic flooding. DWR evaluated pipe penetrations, assessed pipe conditions, and prioritized rehabilitation and repair of pipe penetrations that presented the greatest flood risk. Levee pipe penetrations below the levee freeboard and greater than 6 inches in diameter are the highest risk. Scope of Work: The project will consist of: 1. Removing and replacing existing aging drainage pipes and appurtenant structures. 2. Designing and constructing the replacement pipes to comply with Title 23, and the United States Army Corps of Engineers (USACE) design standards. 3. Reconstructing each drainage pipe with reinforced concrete pipe and backfilled with controlled low-strength material (CLSM). Environmental Setting: In these portions of the San Joaquin County, land usage varies but it is primarily rural. There are many large trees adjacent to the project area. Nesting and migratory birds, protected by the Migratory Bird Treaty Act, may nest within these trees. Furthermore, the Swainson’s Hawk, a raptor species of concern within the State of California and listed as threatened may nest adjacent to or within the project area. A pre-construction survey for nesting Swainson’s Hawks and other migratory birds is recommended if construction is scheduled to occur from February 15th to September 1st. Beneficiaries: The public will see increased safety and fewer hazards with these well-maintained pipes. Overall, there will be reduced maintenance concerns and more reliability within the project area.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 20 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

about 23 hours ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS