Reach 123 - Haskell Canyon Channel Restoration Project #2469-01
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → Los Angeles County Public Works
NAICS
237990 - Other Heavy and Civil Engineering ConstructionView NAICS
Place of Performance
Copper Hill Drive and Old Spanish Trail, Santa Clarita, CA, 91390Set-Aside
NONE
Timeline
Organization & Contact Information
Show more
AgencyCalifornia → Los Angeles County Public Works
Contacts2 people available
OfficeN/A
Organization / Agency
California → Los Angeles County Public Works
Office AddressN/A
Contacts
Interested Companies (1)
Show more
Ruth Villalobos & Associates
Ontario, CA
Full Description
Show more
The proposed Project consists of the one-time clean out of Reach 123 to restore it to its as-built condition. The proposed Project footprint is approximately 10.86 acres and will consist of sediment and vegetation removal and potential minor repair to the side levees and storm drain outlets.
The proposed Project would be conducted in one phase that is expected to begin Fall 2025 and last approximately four (4) months. The proposed Project objectives include removal of vegetation, debris, excess sediment and grading to achieve designed drainage standards. Construction equipment proposed to be used during the proposed Project include 21 off-highway trucks, 2 rubber-tired dozers, 3 tractor/loader/backhoes, 3 excavators, and 3 portable toilets with a hand wash station. Approximately 37,560 cubic yards (CY) of material would be cut, and approximately 1,444 CY of material would be backfilled, resulting in a net cut of approximately 36,166 CY of material. The debris and vegetation material removed would be disposed of approximately 8.5 miles away at the Chiquita Canyon Landfill in the City of Santa Clarita, and the excess sediment material cut would be hauled to the May Sediment Placement Site in the City of Sylmar approximately 18 miles south of the proposed Project. The Channel may require repairs to the concrete slopes and will be determined once the sediment and vegetation are removed and the slopes become fully visible for inspection. Onsite proposed Project activities would occur from 7:00 a.m. through 4:00 p.m. Monday through Saturday (Saturdays as needed) with a total of 36 construction workers and a maximum of 150 construction trips per day. Ingress, egress, and staging areas would be located on the existing access roads on both sides of the Channels banks along the entire proposed Project footprint.