Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Tank Rehabilitation Project: Broderson One Tank Roof Replacement and Rehabilitation, Juniper Tank, Lower Las Brisas Two Tank, Lower Landmark One Tank, Continued

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Eastern Municipal Water District is undertaking a Tank Rehabilitation Project to address deteriorated coatings and corroded structural members across five key assets in Riverside County. The project focuses on the Broderson One, Juniper, Lower Las Brisas Two, Lower Landmark One, and Mills tanks. The primary objective is to extend the service life of these assets and ensure reliable water service for district ratepayers without increasing the overall capacity of the tanks. The scope of work includes the design and replacement of the Broderson One Tank roof, along with the installation of new roof vents and perimeter safety railings. Additionally, the project involves replacing cathodic protection systems and repairing or replacing corroded structural members for the Juniper, Lower Las Brisas Two, Lower Landmark One, and Mills tanks. Performance will take place at multiple locations across the district's service area, specifically in the cities of Homeland, Moreno Valley, Murrieta, and Riverside. The project is categorized as a repair and maintenance effort and is exempt under section 15301(a).

General Info

Rehabilitate five aging water tanks in Riverside County to ensure safety, structural integrity, and reliable water service.

Agency

California → Eastern Municipal Water District

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Eastern Municipal Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Eastern Municipal Water District
Office AddressN/A

Full Description

Show more
Title continued: Mills Tank Water tanks are key assets in Eastern Municipal Water District’s (EMWD) ongoing mission to provide reliable water service. Exterior inspections and interior dive inspections revealed several water tanks operating at sub-optimal conditions, including deteriorated coating and corroded structural members in several tanks. Proper maintenance is required to ensure optimal protection of district assets and extension of the tank’s service life. The purpose of this project is to rehabilitate the following tanks: Broderson One Tank, Juniper Tank, Lower Las Brisas Two Tank, Lower Landmark One Tank, and Mills Tank. The project includes the design and replacement of Broderson One Tank roof as well as installation of new roof vents, perimeter safety railing, replacement of cathodic protection system, and repair or replacement of corroded structural members for the Juniper, Lower Las Brisas Two, Lower Landmark One, and Mills Tanks. Beneficiaries of the project are EMWD ratepayers.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 20 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

about 23 hours ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS