Sutter Bypass Pumping Plant Rehabilitation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sutter Bypass Pumping Plant Rehabilitation Project, managed by the California Department of Water Resources, involves infrastructure improvements at three pumping plant locations along the East Levee of the Sutter Bypass in Sutter County. Under Streambed Alteration Agreement Notification Number 1600-2020-0170-R2, the California Department of Fish and Wildlife has extended the agreement to allow for critical rehabilitation work. Previous activities included the demolition of abandoned control buildings at Pumping Plants 1 and 2, the extension of gravity drain pipes across all three sites, conduit installation, and the reconstruction of the levee, toe road, and sump basin at Pumping Plant 3. Remaining work under the extension focuses on the removal of existing concrete footings and aprons and the installation of new concrete footings, aprons, and stop-log structures at all three pumping plants. Additional requirements include the replacement of riprap at all sites, the installation of fill materials for access ramps, the offsite disposal of spoils, and the restoration of all disturbed project areas. A Notice of Determination has confirmed that the project will not have a significant environmental effect within the jurisdiction of the California Department of Fish and Wildlife, provided that specific mitigation measures are implemented.

General Info

California DWR rehabilitates Sutter Bypass pumping plants with environmental compliance and structural upgrades.

Agency

California Water Resources, Department of

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

2020-0170-R2 Notice of Determination for Sutter Bypass Pumping Plant Rehabilitation Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Annalise MetzgerEnvironmental Scientist

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has extended Streambed Alteration Agreement Notification Number 1600-2020-0170-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Department of Water Resources (DWR), as represented by Mitra Emami. Activities completed under this Agreement include: demolished abandoned control buildings at Pumping Plant (PP) No. 1 and No. 2, extended gravity drain pipes at all three PP, reconstructed levee and toe road at PP No. 3, conduit installation, and filled sump basin at PP No. 3. Work to be completed under this extension includes: removal of existing concrete footing and apron and installation of new concrete footing, apron, and stop-log structures at Pumping Plant (PP) #1 and #2; removal of existing concrete footing and apron and installation of new concrete footing, apron, and stop-log structures at PP #3; removal of existing riprap and installation of new riprap at all PP; depositing spoils offsite; installation of fill materials for access ramps at all PP; and restoration of disturbed project areas.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 6 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 18 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS