Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

General Waste Discharge Requirements and General Water Quality Certification for Rural Road and Watercourse Construction and Reconstruction in the North Coast R

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Barker Creek Roads Sediment Treatment project, executed under Lake and Streambed Alteration Agreement EPIMS-SHA-60312-R1, is designed to mitigate road-sourced sediment pollution entering Barker Creek from the Barker Valley Road system in Hayfork, California. Funded by the CDFW Cannabis Restoration Grant Program, the project addresses ecological issues caused by a shift from rural to industrial road use, which has increased turbidity and sediment loading. The scope of work includes upgrading or installing 12 corrugated metal pipe culvert crossings to accommodate 100-year flows, installing or maintaining approximately 38 rolling dips across four miles of road, reshaping the road prism to improve drainage, and providing armoring at culvert inlets, outlets, and footprints. Additionally, a sediment basin measuring 23 feet by 12 feet and 3.5 feet deep will be installed upslope from site BV-SC-03 to capture roadside ditch runoff. The project is overseen by the Regional Water Quality Control Board, Region 1, and the Watershed Research and Training Center, with construction planned for 2026 pending the attainment of implementation funds. A Notice of Determination issued on September 9, 2025, confirms that the project has been approved with associated mitigation measures and a monitoring plan, concluding that there are no significant environmental impacts within the jurisdiction of the California Department of Fish and Wildlife. The effort is categorized under NAICS code 237990 and is linked to State Clearinghouse Number 2023120022.

General Info

CDFW to install culverts, rolling dips, and sediment basin in Barker Valley to reduce erosion and sediment pollution by 2026.

Agency

California → Regional Water Quality Control Board, Region 1 - North Coast, Santa Rosa

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Hayfork, CA

Set-Aside

NONE

Documents

(1)

EPIMS-TRI-60312-R1 Barker Creek Roads Sediment Treatment Notice of Determination

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 1 - North Coast, Santa Rosa
Contacts3 people available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 1 - North Coast, Santa Rosa
Office AddressN/A
Contacts
Dyana JudnickEnvironmental Scientist
Leslie MounivongWatershed Stewardship Program Environmental Compliance Specialist
Shannon StrongEnvironmental Scientist

Full Description

Show more
Project Description: The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-SHA-60312-R1), pursuant to Fish and Game Code section 1602, to the project Applicant, The Watershed Research and Training Center as represented by Leslie Mounivong. The project is limited to the Barker Valley Road system which contains culvert crossings, poor road shaping and drainage, and has changed from infrequent rural use to frequent industrial use which has resulted in the native surface road becoming a significant source of sediment pollution into Barker Creek. The geologic formation comprising the Barker Valley area leads to flashier rain runoff and contributes to high turbidity yield when eroded. Barker Creek suspended sediment loads were recorded as 50 - 100 tons/square mile in 2002 (Graham Mathews and Associates 2003) which was attributed to the road network and the effects of land use in the privately held portions of the watershed. Road-source sediment loading in Barker Creek has been an ecological issue for over 30 years. Funded by the CDFW’s Cannabis Restoration Grant Program, the Barker Creek Roads Sediment Treatment project proposes to reduce hydrologic connection of the Barker Valley Road system to Barker Creek and halt the worsening road-sourced sediment pollution. The project will achieve this goal by upgrading or installing 12 culvert crossings to accommodate 100-year flows; installing or maintaining approximately 38 rolling dips over four (4) miles of road; reshaping the road prism to improve drainage; armoring at culvert inlets, outlets, around the footprint of culvert crossings, and existing road ditches; and installing a sediment basin. All culvert upgrades and installations will use corrugated metal pipe (CMP). Construction is planned for 2026; however, this depends on the attainment of implementation funds. The engineering plans describe existing site conditions and the proposed improvements. A sediment basin will be installed upslope from site BV-SC-03; the sediment basin will be 23 feet in length by 12 feet in width and 3.5 feet in depth and will capture sediment from roadside ditch runoff.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The scope of work includes the dredging and ocean disposal of approximately 4,260 cubic yards of material, vegetation clearance, and stone rework for the revetted mole. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone Small Businesses, who are eligible for a price evaluation preference. Bidders must submit physical sealed envelopes by the deadline, as electronic submissions are prohibited. Required documentation includes SF 1442, the CLIN schedule, representations and certifications, and a bid guarantee. The contractor must provide key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Performance will be measured through pre- and post-dredge multi-beam surveys conducted by a third-party surveyor, and the contract includes liquidated damages of 2,297 dollars per calendar day of delay. Compliance with the Davis-Bacon Act and strict environmental and safety standards is required throughout the execution of the work.
Healy Tibbitts Builders, Inc.

POSTED

about 7 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project is a construction effort by Santa Rosa County, Florida, designed to remedy severe creek bank erosion and enhance storm resiliency. The scope of work involves the excavation of unsuitable materials and the stabilization of approximately 100 linear feet of streambank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. The project also includes an optional component, Bid Alternate A, which covers the repair of a damaged seawall along the western shore of the creek. All work must adhere to Santa Rosa County and FDOT standards, with technical oversight provided by Mott MacDonald. The contract is structured as a lump sum agreement with a substantial completion deadline of 120 calendar days and final completion within 150 calendar days from the notice to proceed. Financial terms include a 5% retainage on payments and liquidated damages of 1,685 dollars per day for delays. Bidders must provide a bid guarantee of 5% of the total price, and performance and payment bonds are required for contracts exceeding 200,000 dollars. The project is subject to various federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act for prevailing wages, and Florida Statutes Chapter 119 regarding public records. A reimbursement agreement with the Florida Fish and Wildlife Conservation Commission provides a maximum compensation limit of 375,000 dollars for the stabilization efforts.
Engineering

POSTED

about 10 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price construction contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include demolition, clearing and grubbing, excavation, placing embankment, installing separator geotextiles, placing graded stone, and turf establishment and maintenance. Bids are due by October 19, 2026, at 10:00 a.m., with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on unit prices, provided they are reasonable and balanced. The contractor must adhere to EM 385-1-1 safety standards and the Davis-Bacon Act for prevailing wages. Performance requirements include submitting a preliminary project schedule within 15 days and an initial schedule within 42 days of the Notice to Proceed. The contract includes liquidated damages of $4,295.00 per calendar day of delay and requires the use of approved testing laboratories for quality control. A project labor agreement is not required for this acquisition.
W07V Endist New Orleans

POSTED

about 11 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS