Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

General Waste Discharge Requirements for Commercial Lily Bulb Operations in the Smith River Plain

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The North Coast Regional Water Quality Control Board has established the General Waste Discharge Requirements for Commercial Lily Bulb Operations in the Smith River Plain to protect and restore water quality objectives within the North Coast Basin Plan. This initiative addresses the potential for pollutants to enter surface water and groundwater through irrigation runoff, stormwater, pesticide and fertilizer application, sediment erosion, and the removal of riparian vegetation. Under these requirements, participating enrollees must assess, plan, and implement site-specific management practices to control discharges from their operations. Managed by the Regional Water Quality Control Board in Santa Rosa, California, the project ensures that commercial lily bulb activities in the Smith River Plain adhere to environmental standards to mitigate ecological impact.

General Info

Water quality requirements for commercial lily bulb operations in the Smith River Plain.

Agency

California → Regional Water Quality Control Board, Region 1 - North Coast, Santa Rosa

NAICS

924110 - Administration of Air and Water Resource and Solid Waste Management ProgramsView NAICS

Place of Performance

Smith River Plain Hydrologic Subarea and Coastal Terrace, CA, 95567

Set-Aside

NONE

Documents

(4)

Notice of Determination_SCH2024100484

PDF

2026 Environmental Filing Fee Cash Receipt - 2024100484

PDF

Summary of Revisions and Response to Comments

PDF

FEIR_GWDRs for Commercial Lily Bulb Operations in the Smith River Plain

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 1 - North Coast, Santa Rosa
Contacts1 person available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 1 - North Coast, Santa Rosa
Office AddressN/A
Contacts
Brenna SullivanEngineering Geologist

Full Description

Show more
The North Coast Regional Water Quality Control Board, as the Lead Agency, has prepared a Final Environmental Impact Report (EIR) for general waste discharge requirements regulating the discharge of waste from commercial lily bulb operations in the Smith River Plain, “General Waste Discharge Requirements for Commercial Lily Bulb Operations in the Smith River Plain” (Lily Bulb Order). The purpose of the Lily Bulb Order is to protect and restore beneficial uses and achieve water quality objectives specified in the North Coast Basin Plan. Lily bulb operations have the potential to discharge pollutants to surface water and groundwater from stormwater and irrigation runoff, the application of pesticides and fertilizer, erosion of sediment, and removal and suppression of riparian vegetation. The proposed WDRs will require Enrollees to assess, plan, and implement a suite of site-specific actions and management practices to control discharges from lily bulb operations.

Similar Contracts

Same NAICS industry code

NAICS: 924110
SLED
Cost Recovery Provision in the Proposed Addendum to the Cooperative Agreement Between the South Coast AQMD and the Ports of Long Beach and Los AngelesThe South Coast Air Quality Management District (SCAQMD) will manage a $40 million funding commitment from the Ports of Long Beach and Los Angeles to develop regional off-port zero-emission truck charging and fueling infrastructure supporting drayage trucks registered in the Ports Drayage Truck Registry. Each port is required to contribute $20 million, with SCAQMD responsible for administering, distributing, and monitoring the use of these funds to ensure alignment with regional air quality goals. A Memorandum of Understanding (MOU) between SCAQMD and each port must be executed, containing defined elements including recitals, transparent project selection criteria, procedures for handling uncommitted funds, mandatory reporting, public engagement processes, and a specified term for the agreement. SCAQMD is permitted to recover up to 10 percent of the total project cost as an administrative fee to cover fund management and oversight expenses, ensuring operational sustainability without exceeding this cap. The infrastructure projects must be located within the South Coast Air Basin, encompassing Los Angeles, Orange, Riverside, and San Bernardino counties, with SCAQMD based in Diamond Bar, California, serving as the central administrative entity. There is no formal solicitation number or standard federal contract type; the arrangement is structured as a cooperative agreement addendum with no referenced FAR clauses, procurement evaluation factors, or traditional contracting elements such as CLINs, delivery schedules, or inspection protocols. The initiative is grounded in environmental compliance under CEQA Guidelines Section 15273 and aims to accelerate the deployment of zero-emission logistics infrastructure in support of regional air quality improvement objectives.
South Coast Air Quality Management District

POSTED

7 days ago

DEADLINE

N/A
View Details
NAICS: 924110
SLED
Permit Amendment to change the statuses of multiple groundwater wells.The State Water Resources Control Board is initiating a permit amendment to update the operational status of six groundwater wells in California, specifically to reflect changes in their use and availability. Three wells—Calderwood/Marconi Well 13, Larch/Northrop Well 77, and Evergreen Well N1—are slated to be reclassified from Active to Inactive, indicating they will no longer be in regular use and will be formally taken out of service. Additionally, three other wells—Northrop/Dornajo Well 68, Field Well N8, and Cypress Well N20—will transition from Active to Standby status, meaning they remain available for future use but are currently not extracting water, typically due to operational adjustments or reduced demand. The amendment is administrative in nature, targeting regulatory records to ensure compliance with current water management practices, and does not involve new construction or extraction capacity changes. The action is managed under the authority of the California State Water Resources Control Board, with the primary point of contact being Austin Peterson, District Engineer, and Michael Simi, Operations Manager, who oversee permitting and operational compliance. The amendment is listed as a forecast with a posted date of August 4, 2026, and is associated with the Sacramento, California region. The regulatory update supports accurate water resource tracking and allocation by reflecting the current and projected operational realities of the wells within the state’s managed groundwater system. No procurement, funding, or competitive bidding is involved, as this is strictly a status adjustment to existing permits.
State Water Resources Control Board

POSTED

10 days ago

DEADLINE

N/A
View Details
NAICS: 924110
SLED
FY27 MDAR GRANT- Natural Disaster Recovery Grant II (NDR2)
Solicitation # BD-27-1002-1003-001-132016
The FY27 MDAR Grant, specifically the Natural Disaster Recovery Grant II (NDR2), is a non-competitive recovery program administered by the Massachusetts Department of Agricultural Resources. The program provides funding for the repair or replacement of agricultural infrastructure, including greenhouses, irrigation systems, aquaculture tanks, and maple tubing, that was damaged by weather events occurring between January 1, 2023, and December 31, 2024. To be eligible, the damage must represent at least 15 percent of the asset's value, and all restoration work must be completed by September 30, 2027. Applications must be submitted electronically via the designated state portal by September 30, 2026. Awards are based on verified eligibility and documented losses, such as crop, timber, or infrastructure loss, rather than a competitive bidding process. The grant is governed by the Commonwealth of Massachusetts Terms and Conditions and USDA General Terms. Key administrative requirements include mandatory enrollment in Electronic Funds Transfer for payments, use of the COMMBUYS system for invoicing, and compliance with the Supplier Diversity Program. Additionally, contractors must adhere to HIPAA privacy rules regarding protected health information and are prohibited from using the official Commonwealth seal in promotional materials.
1003 - MDAR Admininstration

POSTED

11 days ago

DEADLINE

in about 2 months
View Details
NAICS: 924110
SLED
SB 1013 Addition of New Beverage Containers Permanent RegulationsIn 2022, California enacted Senate Bill 1013 to expand the Beverage Container Recycling Program by including new types of beverage containers eligible for redemption, specifically targeting wine, distilled spirits, and wine and distilled spirit coolers with alcohol content exceeding 7 percent by volume, which were previously excluded. This legislative change updated the existing framework established under the Public Resources Code and the California Code of Regulations, adjusting the scope of covered beverages beyond the traditional categories of aluminum, glass, plastic, and bimetal containers that had been limited to low-alcohol and non-alcoholic drinks. The bill also maintained the existing redemption value structure of five cents for containers under 24 ounces and ten cents for those 24 ounces or larger, while extending those rates to the newly covered items. The Department of Resources Recycling and Recovery, known as CalRecycle, is tasked with implementing administrative procedures to operationalize these changes and ensure compliance across retailers, processors, and consumers. CalRecycle has initiated regulatory development to formalize the necessary processes for handling the expanded program, including updates to payment systems, reporting requirements, and recycling center operations to accommodate the additional beverage types. The proposed regulations aim to clarify responsibilities for all participants in the recycling chain, maintain program integrity, and support increased recycling rates and environmental outcomes. While the legislation was passed in 2022, the regulatory implementation remains under active development, with public notice and comment periods anticipated as part of the formal rulemaking process. The regulations are expected to be finalized and adopted in the coming years, with CalRecycle’s Regulations Unit serving as the primary point of contact for stakeholder inquiries and public engagement. This expansion represents a significant evolution of California’s longstanding Bottle Bill, aligning it with current market trends and consumption patterns while reinforcing the state’s commitment to waste reduction and resource recovery.
California Resources Recycling and Recovery, Department of (CalRecycle)

POSTED

21 days ago

DEADLINE

N/A
View Details
NAICS: 924110
SLED
Adopt Emergency Regulations to Amend Title 22, California Code of Regulations, Division 4.5, Chapter 11, Appendix X, Subsection (c) and Chapter 10, Subsection 6The California Department of Toxic Substances Control is proposing an emergency rulemaking amendment to expand the list of Covered Electronic Devices (CEDs) under Title 22 of the California Code of Regulations, adding five new device categories that exhibit hazardous waste characteristics when discarded. These include portable gaming devices with integrated screens, home surveillance monitors with screens, smart mirrors capable of displaying video, digital picture frames that display video, and smart remote controllers with integrated screens. The amendment is based on analytical testing conducted by DTSC’s Environmental Chemistry Lab, which confirmed that components from these devices exceed California’s threshold concentrations for toxic metals such as copper, lead, and nickel, thereby classifying them as hazardous waste under state regulations. This action builds upon the foundational framework of the Electronic Waste Recycling Act of 2003 and its 2005 amendments, which established a fee-based system funded by consumers at point of purchase and administered by the California Department of Tax and Fee Administration, with proceeds directed to approved recyclers through CalRecycle. The regulatory update aims to close gaps in the existing CED definition by ensuring emerging electronic products with video display capabilities are included in the recycling program, thereby increasing proper e-waste recovery rates and reducing the illegal dumping of hazardous materials in landfills. DTSC retains authority under state law to presume hazardous waste status for such devices, and the amended regulations will clarify compliance obligations for retailers, collectors, and recyclers across all California counties. While no federal contracting mechanisms, pricing structures, or procurement clauses are involved, the rulemaking is a statewide regulatory enforcement action coordinated through DTSC’s Hazardous Waste Management Program, with public documentation and submissions managed via the Office of Land Use and Climate Innovation in Sacramento.
California Toxic Substances Control, Department of

POSTED

24 days ago

DEADLINE

N/A
View Details
NAICS: 924110
SLED
2027 Local & Regional Water Supply Planning Grant Program
Solicitation # RFA-124677
The 2027 Local & Regional Water Supply Planning Grant Program, identified by solicitation number RFA-124677, is a non-competitive funding opportunity administered by the Virginia Department of Environmental Quality to support local governments, regional planning units, and related stakeholders in developing Regional Water Supply Plans aligned with § 62.1-44.38:1 of the Code of Virginia and 9VAC25-780. This grant program is specifically designed for public entities and does not involve procurement of goods or services from the private sector, and applications must not be submitted through eVA. The initiative aims to enhance water supply resilience across the state by empowering communities to plan strategically for long-term water needs. Applications are due by August 14, 2026, at 10:00 PM Eastern Time, following the posting of the solicitation on July 20, 2026. The program is statewide in scope, with performance and eligibility extending across all regions of Virginia. All inquiries should be directed to Renee Bishop at the Department of Environmental Quality via email at renee.bishop@deq.virginia.gov or phone at 804-836-5852. Additional information and the application portal can be accessed through the official UI link provided, and applicants are expected to comply fully with state regulatory requirements in the development and submission of their regional water supply plans.
Department of Environmental Quality

POSTED

25 days ago

DEADLINE

in about 13 hours
View Details