Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Alamitos Bay Water Quality Enhancement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Long Beach

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

690 North Studebaker Road near Loynes Drive, Long Beach, CA, 90803

Set-Aside

NONE

Documents

(5)

Alamitos Bay Water Quality Enhancement Project Draft EIR Notice of Availability

PDFnotice-of-availability

2024051330_CDFW_Comment on Alamitos Bay Water Quality Enhancement Project DEIR

PDFcomment-letter

Alamitos Bay Water Quality Enhancement Project Notice of Completion

PDFnotice-of-completion

Summary Form for Environmental Document Submittal - Alamitos Bay Project

PDFsummary-form

Alamitos Bay Water Quality Enhancement Project Draft Environmental Impact Report

PDFenvironmental-impact-report

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Long Beach
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Long Beach
Office AddressN/A
Contacts
Shannon FialaSenior Project Manager

Interested Companies (1)

Show more
Environmental Science Associates
Los Angeles, CA

Full Description

Show more
The proposed project would maintain existing water circulation patterns in Alamitos Bay by replacing the existing once-through-cooling (OTC) pumps at AES Alamitos for power generating operations with a new pump system that is separate from power generating operations. OTC operations at AES Alamitos are anticipated to cease in December 2026, in accordance with current regulations from the State Water Resources Control Board. The proposed project would install new pumps to convey water from Alamitos Bay to the San Gabriel River Estuary, maintaining current circulation patterns and preventing water quality impacts to Alamitos Bay (including Marine Stadium and Colorado Lagoon). The proposed project includes installation of screens within the existing intake channel that will comply with regulatory criteria for fish impingement, fish entrainment, and trash removal. The new pumps will be installed within the intake channel of the existing AES Alamitos Unit 6. The new infrastructure would be installed within the intake channel as well as on land and require an anticipated construction duration of approximately 2 to 2.5 years. Construction activities are anticipated to require a Coastal Development Permit (CDP) from the California Coastal Commission (CCC), a Clean Water Act Section 404 permit from the US Army Corps of Engineers (USACE), and a Clean Water Act Section 401 Certification from the Los Angeles Regional Water Quality Control Board (LARWQCB). In addition, to operate the pumps, it is anticipated an NPDES discharge permit will be required from the LARWQCB.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 8 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 20 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS