Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Concrete Flatwork & Curbing Subcontractor

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Concrete Flatwork and Curbing involves providing specialized installation services for Chicago Department of Transportation corridor improvement projects. The scope of work includes the forming and pouring of 5-inch and 8-inch Portland cement concrete sidewalks, the construction of ADA-compliant ramps featuring cast iron detectable warning tiles, and the installation of concrete base slabs and Type B-V.12 Combination Concrete Curb and Gutter systems. The opportunity is categorized under NAICS code 238110 and is intended for subcontractors working under prime contractors. Interested parties must submit their responses by the deadline of October 20, 2026, at 4:00 PM.

General Info

Subcontract for CDOT concrete flatwork, curbing, and ADA ramps due October 20, 2026.

Documents

This scope was carved out of 77412.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

1269498A: AUBURN GRESHAM CORRIDOR IMPROVEMENTS Section 1: 79th Street, Sangamon

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → Chicago Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs Portland cement concrete sidewalks, ADA ramps, and curb and gutter systems for prime contractors on Chicago Department of Transportation (CDOT) corridor improvement projects. Forms and pours 5-inch and 8-inch sidewalks, constructs ADA-compliant ramps, and installs Combination Concrete Curb and Gutter (Type B-V.12) and concrete base slabs. Uses cast iron detectable warning tiles. Delivers installed sidewalks, ADA ramps, and curb/gutter system.

Similar Contracts

Same NAICS industry code

NAICS: 238110
New
SLED
ADA Ramp
Solicitation # 173856
The Choctaw Nation Housing Authority is soliciting bids for the installation of an ADA-compliant concrete ramp at a residence located at 413 Burney, Colbert, OK 74733. The project requires the construction of a concrete ramp approximately 20 feet long with a minimum thickness of 4 inches, reinforced with 3/8 rebar or wire mesh, and finished with a broom texture. The ramp must feature black metal pipe handrails on both sides with a gripping surface between 34 and 38 inches, maintaining a 36-inch clear width between rails. The contractor is responsible for all measurements, material counts, permits, and line locates, ensuring all work meets or exceeds 2019 IRC standards. Site preparation includes the removal of a lattice fence, posts, steppingstones, and debris, with the final requirement to restore the yard to mowing condition. Bids must be submitted exclusively through the Housing Bid Board by 4:30 p.m. on October 24, 2026. To be considered valid, all quotes must be itemized and include a price expiration date. Preference in the award process will be given to Indian organizations and Indian-Owned economic enterprises. Additionally, Davis Bacon rules and requirements apply to this project if the total funding is $2,000 or above. Prospective contractors are required to visit the project site before bidding, as change orders for conditions identifiable during a site visit will not be approved. The estimated award date is November 24, 2026, with a start date to be negotiated upon award.
Choctaw Nation Housing Authority

POSTED

about 17 hours ago

DEADLINE

in 10 days
View Details

More opportunities from Illinois → Chicago Department of Transportation

Same awarding agency

NAICS: 237310
SLED
1269498A: AUBURN GRESHAM CORRIDOR IMPROVEMENTS Section 1: 79th Street, Sangamon
Solicitation # 77412
Solicitation 77412, Specification 1269498A, is a construction project issued by the Chicago Department of Transportation for the Auburn Gresham Corridor Improvements, Section 1. The scope of work focuses on infrastructure enhancements at 79th Street, from Sangamon Street to Fielding Avenue, and Halsted Street, from 78th Street to 80th Street. Key deliverables include the installation of combination concrete curb and gutter, Portland cement concrete sidewalks and ADA ramps, pavement removal and patching, and the application of hot-mix and warm-mix asphalt. The project also involves electrical and site work, including the installation of LED signal heads, removal of existing street lighting equipment, and the placement of litter receptacles and temporary chain link fencing. The contract will be awarded to the responsible bidder with the lowest Award Criteria Figure, determined by a canvassing formula that adjusts the base bid based on proposed minority and female employee utilization goals. Bidders must comply with Buy America requirements, prevailing wage rates, the Chicago Minimum Wage Ordinance, and the Illinois Human Rights Act. Required submissions include a 5 percent bid deposit, a notarized Bid Execution Page, and an Economic Disclosure Statement, with all proposals submitted electronically via the iSupplier system. Performance and payment bonds are required at 100 percent of the total base bid upon notification. Technical specifications mandate strict quality control for asphalt and concrete, with final acceptance overseen by the Engineer and the Commissioner. Specific packaging and marking standards are required for poles, split pedestal bases, and sign panels to ensure durability and traceability. Administrative requirements include the weekly submission of certified payrolls and the maintenance of a detailed field diary. Payments are city-funded and processed through the Bureau of Administration and Planning.
Highway, Street, and Bridge Construction

POSTED

7 days ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS