This Solicitation opportunity from Nebraska was posted on August 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Concrete Foundation S-26-20
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Lincoln Electric System is soliciting bids for the Concrete Foundation S-26-20 project at the 30th & A Substation in Lincoln, Nebraska, identified as Bid #100-26, with a submission deadline of August 25, 2026 at 2:00 PM CST. This procurement, conducted under a two-step unsealing process, requires all bids to be submitted exclusively through the LES Online Procurement System, with no paper copies accepted. The scope encompasses the installation of concrete foundations for the transformer replacement, including mobilization, demolition, auger-cast pile installation, oil containment structures, drainage piping, crushed rock placement, and precast fire wall pier foundations. Specific work must occur during a scheduled substation outage, with a preliminary start date of October 12, 2026, and bidders are required to propose their own completion date. All bids must adhere strictly to the incorporated Contract Documents, which include Instructions to Bidders, Performance and Labor and Material Payment Bonds, General and Special Conditions, Technical Specifications, Drawings, and all written modifications. Contractors must comply with stringent technical, legal, and administrative requirements. Concrete work must meet ACI 301 and applicable building codes, with material specifications governed by ASTM standards for reinforcing and aggregates. Reinforcing steel must be shipped with permanently attached, non-removable plastic or metal tags matching Shop Drawing mark numbers, and mechanical splices require protective plastic caps. Testing and inspection are overseen by an independent agency hired by the Owner, with compressive strength criteria requiring average three-test results to meet or exceed the 28-day design strength and no individual test falling more than 500 psi below. Core testing must average at least 85% of specified strength with no single core below 75%. Bidders must conduct an onsite inspection and are held fully responsible for understanding site conditions. Key personnel, including drilled pier installers and foremen, must have five years’ experience on similar projects, while precast engineers must be licensed Nebraska professionals. Payment will be based on actual unit quantities using unit prices listed in the proposal sheet, though pricing details are currently unspecified. Bonds, required in an amount not less than the contract price, must be submitted with the signed contract and remain in force for at least one year after final payment. The contract is subject to federal and Nebraska labor laws, including non-discrimination provisions under the Nebraska Fair Employment Practice Act and the Civil Rights Act of
General Info
Place of Performance
NE, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
You must log in to register for Bid Events and to view Bid Question and Response information.
More opportunities from Nebraska → Lincoln Electric System
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
