This Sources Sought opportunity from Department Of Defense was posted on March 14, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Concrete Repair Projects - Blackwater Dam, Webster, New Hampshire- Everett Dam, Weare, New Hampshire

Closed
W912WJ23X0026Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 16 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 16 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 16 hours ago

DEADLINE

in about 14 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 16 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 21 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

MA, USA

Set-Aside

SBA

Documents

2

Blackwater Dam Overall Plan

PDF, High priority: read this firstspecifications
High

Everett Dam Overall Plan

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New England
Contacts1 person available
OfficeCONCORD, MA, 01742-2751, USA
Office AddressCONCORD, MA, 01742-2751, USA

Full Description

Show more
The U.S. Army Corps of Engineers, New England District is issuing this Sources Sought Announcement for two separate concrete repair projects. One of the projects will be located within the Merrimack River Basin located at Blackwater Dam in Webster, New Hampshire, and the other will be located at Everett Dam in Weare, New Hampshire. This announcement is to determine interest, availability, and capability of 8(a), HUBZone, Service-Disabled Veteran-Owned, Women-Owned and Small Business concerns for these projects. The NAICS code for this procurement is 237990 with a size standard of $45M. The Blackwater Dam project is planned to be issued in the late Spring of 2023 with Construction to take place in the Summer of 2024 to accommodate the dry season during the summer months for low water condition. The estimated construction for this project is between $500,000.00 and $1,000,000.00. The Everett Dam project is planned to be issued in the summer of 2023 with Construction to take place in Spring of 2024 to accommodate the dry season during the summer months for low water condition. The estimated construction cost for this project is between $250,000.00 and $500,000.00. The work of this project consists primarily of repairing deteriorating concrete of the flood control structures. Blackwater Dam, Webster, NH Blackwater Dam is located in the Town of Webster, New Hampshire, on the Blackwater River, 10 miles upstream of the confluence of the Blackwater River and Contoocook River. It is located in central New Hampshire, about 15 miles north of the Town of Penacook, New Hampshire. The dam consists of a rolled earth fill embankment and concrete non-overflow section, outlet works and an uncontrolled concrete ogee weir spillway. Construction of the project began in the spring of 1940 and was completed in November 1941. Fiber Reinforced Plastic (FRP) liner was placed in 1964 which provided for lining of the conduits, conduit entrances and discharge apron with a fiberglass cloth and epoxy resin. This lining was installed to provide a smooth surface in the conduits and to prevent further erosion and spalling of the concrete. At various locations around and inside the conduits, this FRP liner has delaminated and broken off, some taking away the concrete surface that it adhered to. See Attachment 1. Scope of the repairs for Blackwater Dam consists of: Inlet nosing at conduit entrances: Remove deteriorated FRP liner, remove existing concrete to sound concrete (4 deep nominal), install rebar anchors and welded wire fabric reinforcing, and apply polymer modified concrete thick patch (4 nosing total). Flow control conduits (3 conduits): Remove deteriorated FRP surface liner on all four sides of the conduits. Apply 2 thick polymer concrete patch upon removal of existing concrete on all walls and floor surfaces. As needed, patch spalled concrete on ceiling area upon removal of the liner. Spillway apron downstream of the conduit: Remove deteriorated FRP liners and apply, as needed, patch to spalled concrete. Work in the conduit area will require a phased temporary flow diversion structure to direct stream flow to a single open conduit while working on two that are kept dry during the low flow construction window. Based on the construction window with historically the low water season for the year, the Government anticipates concrete removal for repair works inside the conduits by hydro-demolition with associated pumping and waste treatment self-contained mechanical units. At the non-overflow sections of the dam, work consists of removal of previously patched areas that are deteriorating and applying new polymer concrete patches to be followed by the application of penetrating sealer to the exposed concrete area. Everett Dam, Weare, NH Everett Dam is a flood risk management reservoir situated on the Piscataquog River in the Town of Weare, New Hampshire and about 15 miles above the confluence with the Merrimack River. The Everett reservoir is part of a 2-reservoir system with nearby Hopkinton Lake; the entire system is divided into three storage areas - two located in the Contoocook River watershed and one in the Piscataquog River watershed. The sub-areas, connected by 2 canals, act as separate reservoirs during minor floods and as a single reservoir during moderate and/or major floods. Combined with Hopkinton Dam, the Hopkinton-Everett Reservoirs are operated to reduce flooding on the main stem of the Contoocook, the Piscataquog and the Merrimack Rivers. The Everett Dam is a 2,000-foot-long embankment dam composed of rolled earth fill with rock slope protection, with a 175-foot-long concrete ogee weir spillway located on the left abutment. See Attachment 2. Scope of the repair for the Everett Dam consists of: Inlet Weir Structure: Repair of selected deteriorated concrete shoulders holding the timber weir logs and repair of localized scoured wall and floor slab. Work may include removal of existing unsound concrete, restoration of any impacted reinforcing, and application of polymer modified concrete patches over the affected area. Conduit ceiling: Immediately downstream of the inlet splitter, repair previously patched area on the ceiling. Being part of a two-reservoir system, Everett Dam water level can be lowered during the restricted working window of the dry summer season to allow work within the inlet structure and conduit ceiling. The Government anticipates that this work may be completed with handheld mechanical tools to remove the deteriorated concrete. Waste management of the controlled removal and repair will be required for the work in the areas above. Bridge pier base: Repair of deteriorated concrete on a previously patched area at the base of a bridge pier where it sits on the ogee weir. Work can be done in the dry during low precipitation season. Control Tower structure: Repair of localized concrete delamination adjacent to a window and sealing of surface crack on the exterior concrete wall of the control tower structure. As stated above, all in-water work will have a time of year restriction where flow or water level is anticipated to be at the minimum. Strict construction waste management will be implemented to prevent contamination into an active stream/reservoir. Interested firms should submit a capabilities package to include the following: business classification (i.e. HUBZone, small business, etc.), as well as qualifications and experience of both the firm and its repair technicians in performing the work components stated above. Please include at least two specific examples of the firm's experience performing the work requirements stated above. The projects must have been performed within the last seven years. Please indicate the team subcontractor(s) (if any), including their prior experience and qualifications (both the firms and their repair technicians), which will be used to support the offeror's effort and their experience must also have been performed within the last seven years. Proof of bonding capability is required. Responses are limited to twenty pages. Responses are due by April 04, 2023. Responses should be emailed to: ahmed.ismael@usace.army.mil Phone Contact: (978) 318-8814 Interested firms shall provide the above documentation in one original form and one copy. The Government will not pay for any material provided in response to this market survey nor return the data provided. This notice is for information purposes only and is not a request to be placed on a solicitation mailing list nor is it a Request for Proposal (RFP) or an announcement of a solicitation. The results of this survey will be considered to be in effect for a period of one year from the date of this notice.

More opportunities from Department Of Defense → W2SD Endist New England

Same awarding agency

NAICS: 237310
New
Federal
Guardrail Installation, Mansfield Hollow Lake, Mansfield, CT
Solicitation # W912WJ27QA003
Solicitation W912WJ27QA003 is a Request for Quotations issued by the Department of Defense, W2SD Endist New England, for the installation of approximately 250 linear feet of new pressure-treated wooden guardrail at the Mansfield Hollow Dam in Mansfield Center, Connecticut. This firm-fixed-price contract is a total small business set-aside under NAICS code 237310, with an estimated construction magnitude between $25,000 and $100,000. The project requires the contractor to provide all equipment, materials, and labor, ensuring posts are set three feet below and three feet above finished grade, spaced every six feet on center and secured with carriage bolts. The period of performance is 210 calendar days from the notice to proceed, with work hours restricted to Monday through Friday, 7:00 AM to 3:30 PM. To be considered responsive, vendors must maintain an active registration in SAM.gov and submit a comprehensive quote including technical documentation, price, and past performance from the last three years. Key safety and compliance requirements include adherence to USACE EM 385-1-1 standards and the submission of an Accident Prevention Plan, Activity Hazard Analysis, and Site Safety and Health Officer designation letter within 21 days of the notice to proceed. Fieldwork cannot commence until all submittals are approved. Award will be based on the most advantageous offer considering price, technical capability, and past performance. Payments will be processed electronically through the Wide Area WorkFlow system.
Highway, Street, and Bridge Construction

POSTED

about 16 hours ago

DEADLINE

in 10 days
View Details
NAICS: 236220
New
Federal
Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT
Solicitation # W912WJ26RA008
Solicitation W912WJ26RA008 is a firm-fixed-price construction project for the Phase A2 Chilled Water Plant Replacement and Site Utility Upgrades at the VA Medical Center in West Haven, Connecticut. The scope includes the demolition of the existing chilled water plant and the construction of a new multi-story facility featuring chillers, cooling towers, pumps, and a new fuel tank farm. Site utility upgrades involve replacing fire protection and domestic water mains, creating utility main loops for chilled water, steam, condensate, and fire protection, and installing redundant electrical feeders and new water storage tanks. The project must adhere to DVA Physical Security Resiliency Design Requirements and is expected to achieve USGBC LEED Silver certification. Because the work occurs within an active medical campus, strict coordination is required to minimize operational impacts. The estimated contract value ranges from 75 million to 150 million dollars. Award is based on a best-value tradeoff process, with non-price factors—Past Performance, Management Approach, and Small Business Participation—combined being significantly more important than price. A minimum small business participation rate of 10 percent is mandatory for eligibility. Due to campus integration needs, the government has issued several justifications for other than full and open competition to require brand-name products from Johnson Controls, Siemens, and Assa Abloy, as well as specific SCADA programming services from AMAZ Consulting. Proposals must be submitted electronically via the PIEE solicitation module in both native and PDF formats.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 17 days
View Details
NAICS: 237990
New
Federal
Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, Maine
Solicitation # W912WJ27BA003
Solicitation W912WJ27BA003 is a sealed bid invitation for the maintenance and advance maintenance dredging of the Isle au Haut Thoroughfare Federal Navigation Project in Maine. This 100 percent small business set-aside project, under NAICS 237990, has an estimated value between 1 million and 3 million dollars. The scope of work involves the mechanical removal of approximately 3,355 cubic yards of highly compacted coarse sand, gravel, cobbles, and small boulders to achieve a depth of -7 feet Mean Lower Low Water, with an allowable overdepth bringing the maximum depth to -8 feet. All dredged material must be transported and disposed of at the Flake Island Ocean Disposal Site, located approximately 0.9 nautical miles northwest of the project site. Performance is restricted to an environmental window between September 15, 2026, and March 1, 2027, to protect benthic resources and federally managed species. The contractor is required to maintain a production rate of at least 4,000 cubic yards every 30 calendar days, operating 24 hours a day and seven days a week. Award will be based on the lowest price for the total estimated amount of mobilization and dredging line items, with a 10 percent price evaluation preference for HUBZone small business concerns. Key requirements include the provision of performance and payment bonds, the submission of a Contractor Quality Control Plan, and the hosting of a partnering session within 45 days of award. All proposals must be submitted electronically via the Procurement Integrity Enterprise Environment portal.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 21 days
View Details
NAICS: 238290
New
Federal
Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT
Solicitation # W912WJ27QA001
The U.S. Army Corps of Engineers New England District is soliciting quotes for the installation and commissioning of a new power system for the Dike B Operator unit at Mansfield Hollow Dam in Mansfield Center, Connecticut. This fixed-price project, estimated between $25,000 and $100,000, is a total set-aside for small businesses under NAICS code 238290. The scope of work includes site preparation, the construction of a reinforced concrete generator pad, installation of secure perimeter fencing, and the procurement and installation of a standalone propane-powered generator and fuel storage tank. Additionally, the contractor must perform final electrical integration into the existing sluice gate operator unit and control panel, including the installation of a 100 Amp NEMA 3R pedestal-mount panelboard and a 480V to 120/240V step-down transformer. The period of performance is 300 days from the Notice to Proceed, with work restricted to weekdays from 7:00 AM to 3:30 PM. All work must comply with the National Electric Code and the USACE Safety and Health Requirements Manual EM 385-1-1. To be considered responsive, vendors must have an active SAM.gov registration and submit a completed solicitation survey detailing their experience, certifications, and past performance from the last three years. Quotes are due by November 5, 2026, and will be evaluated based on technical capability, price, and past performance. Payment will be processed electronically through the Wide Area WorkFlow system.
Other Building Equipment Contractors

POSTED

6 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS