Concrete Supply for Foundations and Pads

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract is for the supply of ready-mix concrete to support tank foundations, equipment pads, and site improvements in accordance with specified project mix designs. It is classified as a subcontract under NAICS code 327320 and is issued by the BOS17 - Board of Selectmen in Massachusetts, with performance required at Washington Street in Holliston, ZIP code 01746. Bidders must submit responses by the deadline of July 17, 2026, at 3:00 PM, following the posting date of July 1, 2026. The solicitation is managed through the CommBuys platform, and while no set-aside designation is specified, the work is critical to infrastructure development at the designated location. All concrete must meet the technical requirements outlined in the project’s mix design to ensure structural integrity and compliance with engineering standards.

General Info

Supply ready-mix concrete to Washington Street, Holliston, MA, by July 17, 2026, per project mix designs.

Place of Performance

Washington Street Holliston, MA, 01746, USA

Set-Aside

NONE

Documents

This scope was carved out of BD-27-1627-BOS17-BOS17-131015.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Wastewater Treatment Tank Installation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → BOS17 - Board of Selectmen
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of ready-mix concrete for tank foundations, equipment pads, and site improvements per project mix design.

More opportunities from Massachusetts → BOS17 - Board of Selectmen

Same awarding agency

NAICS: 237110
New
SLED
WWTP Yard Piping Phase 1D
Solicitation # BD-27-1627-BOS17-BOS17-134664
The Town of Holliston, Massachusetts, is soliciting bids for the WWTP Yard Piping Phase 1D project, which involves the installation of approximately 1,200 linear feet of PVC piping serving three wastewater effluent tanks and treatment units at the Wastewater Treatment Plant located at 100 Linden Street. The scope of work includes the installation of six concrete ADA ramps with detectable warning panels at specific crosswalks on Washington Street. Technical requirements specify that gravity piping must undergo low air pressure testing per Section 40 23 00, while pressure dosed force mains do not require hydrostatic testing. The contract will be awarded to the lowest responsive and responsible bidder based on the total quote amount. To be considered, bidders must provide at least three references for similar projects completed within the last five years and submit several certifications, including a Certificate of Good Faith and Non-Collusion, a Certificate of Tax Compliance, and a Certification Regarding Labor Harmony and OSHA Training. The project is governed by the laws of the Commonwealth of Massachusetts and requires compliance with prevailing wage rates under Massachusetts General Laws, chapter 149. All employees must have completed a 10-hour OSHA-approved construction safety and health course. Contractors are required to maintain comprehensive commercial general liability insurance with limits of 1 million dollars per occurrence and 3 million dollars annual aggregate, naming the Town of Holliston as an additional insured. Payment terms are set at thirty days from the receipt of an invoice, and all payments are subject to appropriation certification by the Town Accountant. The contractor must guarantee the quality of workmanship and materials for one year following final payment. Sealed bids are due by 10:00 AM on November 12, 2026, at the Town Manager's Office in Holliston.
Water and Sewer Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 16 days
View Details
NAICS: 237110
SLED
Holliston WWTP Phase 1D - Yard Piping
Solicitation # BD-27-1627-BOS17-BOS17-134222
The Town of Holliston is soliciting open market bids for the Holliston Wastewater Treatment Plant Phase 1D Yard Piping project. The scope of work involves the installation of approximately 1,200 linear feet of PVC piping, extending from the plant foundation wall to two feet into the interior of various tank pipe sleeve connections. Key deliverables include the furnishing and installation of yard piping, wall penetration coring, sleeves, interior piping, and full site restoration. All work must be completed within six weeks of contract authorization and must adhere to OSHA, National Electrical Code, and Massachusetts State Building Codes, as well as local Conservation District regulations for erosion and sediment control. The contract will be awarded as a lump sum to the lowest responsive and responsible bidder. To be considered, submitters must provide at least three references for similar work completed within the last five years and certify that all onsite employees have completed a 10-hour OSHA construction safety course. Bidders must also comply with Massachusetts prevailing wage laws and provide a certificate of tax compliance. Required insurance includes comprehensive commercial general liability with minimum limits of 1 million dollars per occurrence and 3 million dollars annual aggregate, naming the Town of Holliston as an additional insured. Written quotes, including a signed Certificate of Good Faith and Non-Collusion, are due by 10:00 AM on October 30, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

21 days ago

DEADLINE

in 3 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS