Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Massachusetts was posted on July 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wastewater Treatment Tank Installation

Closed
BD-27-1627-BOS17-BOS17-131015State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between $80,000,000 and $100,000,000, with a solicitation expected around March 15, 2027. Construction is scheduled to begin in September 2027 and last approximately two years, spanning two dredging seasons from September 1, 2027, to August 31, 2029. The work is divided into two primary sequences: the construction of a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, including an access channel, and the subsequent maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth. The total scope involves mechanically dredging approximately 5,500,000 cubic yards of material using closed clamshell buckets. Specifically, 3,200,000 cubic yards will be removed to create the CAD cell, with material placed at Port Edgewood Basin, Fox Point Reach CAD cells, Prudence Island, and the Rhode Island Sound Disposal Site. The remaining 2,300,000 cubic yards of maintenance material will be placed within the newly constructed Edgewood Shoals North CAD cell. To meet strict environmental windows and project timelines, the contractor must maintain a production rate of at least 300,000 cubic yards every 30 calendar days, operating 24 hours a day, 7 days a week. Interested firms must submit a capabilities package by November 26, 2026, demonstrating experience with these production rates and open water placement in New England during winter months.
W2SD Endist New England

POSTED

about 3 hours ago

DEADLINE

in about 1 month

General Info

Place of Performance

Washington Street Holliston, MA, 01746, USA

Set-Aside

NONE

Documents

7

BD-27-1627-BOS17-BOS17-131015 Wastewater Treatment Tank Installation

HTML, High priority: read this firstifb
High

BD-27-1627-BOS17-BOS17-131015 Wastewater Treatment Tank Installation

HTML, High priority: read this firstifb
High

BD-27-1627-BOS17-BOS17-131015 Wastewater Treatment Tank Installation

HTML, High priority: read this firstifb
High

BD-27-1627-BOS17-BOS17-131015 Wastewater Treatment Tank Installation IFB

HTML, High priority: read this firstifb
High

BD-27-1627-BOS17-BOS17-131015 Wastewater Treatment Tank Installation IFB

HTML, High priority: read this firstifb
High

IFB Holliston Wastewater System Upgrades Phase 1A Addendum 1

PDF, High priority: read this firstamendment
High

Wastewater Treatment Plant Concrete Tank Installation IFB

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → BOS17 - Board of Selectmen
Contacts1 person available
OfficeWashington Street Holliston, MA, 01746, USA
Office AddressWashington Street Holliston, MA, 01746, USA
Contacts
Chris MeoPurchaser

More opportunities from Massachusetts → BOS17 - Board of Selectmen

Same awarding agency

NAICS: 237110
SLED
WWTP Yard Piping Phase 1D
Solicitation # BD-27-1627-BOS17-BOS17-134664
The Town of Holliston, Massachusetts, is soliciting bids for the WWTP Yard Piping Phase 1D project, which involves the installation of approximately 1,200 linear feet of PVC piping serving three wastewater effluent tanks and treatment units at the Wastewater Treatment Plant located at 100 Linden Street. The scope of work includes the installation of six concrete ADA ramps with detectable warning panels at specific crosswalks on Washington Street. Technical requirements specify that gravity piping must undergo low air pressure testing per Section 40 23 00, while pressure dosed force mains do not require hydrostatic testing. The contract will be awarded to the lowest responsive and responsible bidder based on the total quote amount. To be considered, bidders must provide at least three references for similar projects completed within the last five years and submit several certifications, including a Certificate of Good Faith and Non-Collusion, a Certificate of Tax Compliance, and a Certification Regarding Labor Harmony and OSHA Training. The project is governed by the laws of the Commonwealth of Massachusetts and requires compliance with prevailing wage rates under Massachusetts General Laws, chapter 149. All employees must have completed a 10-hour OSHA-approved construction safety and health course. Contractors are required to maintain comprehensive commercial general liability insurance with limits of 1 million dollars per occurrence and 3 million dollars annual aggregate, naming the Town of Holliston as an additional insured. Payment terms are set at thirty days from the receipt of an invoice, and all payments are subject to appropriation certification by the Town Accountant. The contractor must guarantee the quality of workmanship and materials for one year following final payment. Sealed bids are due by 10:00 AM on November 12, 2026, at the Town Manager's Office in Holliston.
Water and Sewer Line and Related Structures Construction

POSTED

7 days ago

DEADLINE

in 15 days
View Details
NAICS: 237110
SLED
Holliston WWTP Phase 1D - Yard Piping
Solicitation # BD-27-1627-BOS17-BOS17-134222
The Town of Holliston is soliciting open market bids for the Holliston Wastewater Treatment Plant Phase 1D Yard Piping project. The scope of work involves the installation of approximately 1,200 linear feet of PVC piping, extending from the plant foundation wall to two feet into the interior of various tank pipe sleeve connections. Key deliverables include the furnishing and installation of yard piping, wall penetration coring, sleeves, interior piping, and full site restoration. All work must be completed within six weeks of contract authorization and must adhere to OSHA, National Electrical Code, and Massachusetts State Building Codes, as well as local Conservation District regulations for erosion and sediment control. The contract will be awarded as a lump sum to the lowest responsive and responsible bidder. To be considered, submitters must provide at least three references for similar work completed within the last five years and certify that all onsite employees have completed a 10-hour OSHA construction safety course. Bidders must also comply with Massachusetts prevailing wage laws and provide a certificate of tax compliance. Required insurance includes comprehensive commercial general liability with minimum limits of 1 million dollars per occurrence and 3 million dollars annual aggregate, naming the Town of Holliston as an additional insured. Written quotes, including a signed Certificate of Good Faith and Non-Collusion, are due by 10:00 AM on October 30, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

22 days ago

DEADLINE

in 2 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS