Conditional Use Permit Case No. 298, Map 103-21

Forecast
PLN25-00172State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Conditional Use Permit Case No. 298, Map 103-21, under permit number PLN25-00172, authorizes the construction of a new two-story, 15,239-square-foot multipurpose building at the Kern County Probation Youth Detention Center. The project is located at 1831 Ridge Road in Bakersfield, California, situated on a 15.6-acre parcel with an R-1 Single-Unit Dwelling Zone Classification. The project is designated as exempt under Section 15183 of the State CEQA Guidelines as a special situation. The Kern County Planning Commission is the approving agency, with administrative oversight provided by the Kern County Planning and Natural Resources Department. Key personnel include Planner I Robert Williams, Architect Cesar Juarez, and Senior Architect Glenn Hartzell. A total of 2,965.00 dollars in permit fees has been paid via journal entry to cover fire review, legal description review, and CEQA posting, among other administrative costs. A public hearing for the project is scheduled for March 26, 2026.

General Info

Kern County approves two-story 15,239 sq ft multipurpose building at Youth Detention Center under conditional use permit.

Place of Performance

Mount Vernon Ave., Bakersfield, CA, 93305

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Kern County
Contacts3 people available
OfficeN/A
Organization / AgencyCalifornia → Kern County
Office AddressN/A
Contacts
Robert WilliamsPlanner I
Glenn HartzellSenior Architect

Full Description

Show more
A Conditional Use Permit to allow the addition of a two (2) story, 15,239-square-foot, multipurpose building at the existing Kern County Probation Youth Detention Center (Section 19.18.030.G), on a 15.6-acre parcel, R-1 (Single-Unit Dwelling) Zone Classification.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 8 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a project to repair and modernize the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, exterior wall systems, interior reconfiguration, and new finishes. Technical upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, updated electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires hazardous materials abatement and site improvements, including paving, drainage upgrades, and repairs to water, sanitary, and storm systems. The contract has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Award will be based on the lowest price for two primary exhibit line items: building renovation and paving removal and replacement. Proposals are due by November 23, 2026. Bonding requirements are tiered, with proposals of 150,000 dollars or more requiring bid, payment, and performance bonds. The project is subject to the Davis-Bacon Act, the Buy American Act, and ADA accessibility guidelines. Quality control will be managed through a three-phase system, and final acceptance requires a series of inspections, including functional operating tests for exhaust systems and potential destructive testing for firestopping.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 13 days
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. All work must comply with NFPA-101 Life Safety Code, ADA, OSHA, and EPA regulations, as well as local Massachusetts building codes. The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Award will be based on best value, with evaluation weighted toward price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit and provide a detailed cost breakdown, a 90-day bid guarantee, and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act and specific federal wage and sick leave requirements, including a minimum wage of 13.65 per hour for covered workers. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 4 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged areas to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as common areas and mechanical rooms. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in mechanical rooms, along with the temporary disconnection and re-installation of HVAC equipment, furnaces, and water heaters. The contractor is responsible for all labor, materials, equipment, and supervision, ensuring the protection of the occupied building and the testing of all restored mechanical, plumbing, electrical, and life-safety systems. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Proposals must include detailed relevant experience, a comprehensive work plan addressing phasing and safety, and itemized pricing by room and trade. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Awarded contractors must provide payment and performance bonding for the full project value, as well as proof of general liability and worker's compensation insurance, within ten days of award. A minimum one-year workmanship warranty is required upon final acceptance by CSD.
Career Systems Development Corporation

POSTED

about 4 hours ago

DEADLINE

in 9 days
View Details

More opportunities from California → Kern County

Same awarding agency

NAICS: 236210
SLED
Airport Commerce Center Industrial Project by ACC Bakersfield JV, LLC.
Solicitation # PP24405
The Airport Commerce Center Industrial Project, managed by ACC Bakersfield JV, LLC and the Kern County Planning and Natural Resources Department, involves the development of approximately 110 acres of privately owned land in unincorporated Kern County, California. The project scope includes the construction of four industrial warehouse buildings totaling 1,505,440 square feet, which is divided into 625,446 square feet for warehousing, 393,624 square feet for cold storage, 335,826 square feet for food and beverage industrial manufacturing or assembly, and 150,544 square feet of office space. Additionally, the project will feature two quick-serve restaurants totaling approximately 9,410 square feet. To implement this development, several land use entitlements are required, including a General Plan Amendment to change 13.76 acres from General Commercial to Service Industrial, a Zone Classification Change for approximately 22.32 acres to Medium Industrial, and a Precise Development Plan. The project also includes the vacation of two drainage easements covering 10.24 acres. The development is subject to the California Environmental Quality Act and the Americans with Disabilities Act. Administrative oversight is provided by the Kern County Planning and Natural Resources Department, with key coordination handled by Nicole Menchaca.
Industrial Building Construction

POSTED

27 days ago

DEADLINE

N/A
View Details
NAICS: 237210
SLED
Tentative Parcel Map 12666
Solicitation # PLD26-00002
Tentative Parcel Map 12666, identified by permit number PLD26-00002, authorizes the division of a 20,744.38 square foot net parcel located on the east side of Gilbert Street in the Lamont area of Kern County, California. The project divides the original land into two smaller parcels measuring 9,958.20 square feet and 10,786.18 square feet, both of which comply with the Metropolitan Bakersfield General Plan R-1 Low Density Residential zoning requirement of a minimum 6,000 square foot net lot size. Approved on August 11, 2026, the project is exempt under Section 15183 of the State CEQA Guidelines. Total fees paid for the permit amount to 5,438.00 dollars, covering costs for the tentative parcel map, map checking, electronic permit maintenance, and land development. The project is subject to several strict conditions of approval and regulatory obligations. Key deliverables include a final map in substantial conformance with the tentative map, a title guarantee, a Tax Collectors Certificate, and an Assessors Tax Estimate. Environmental and safety requirements mandate dust mitigation through soil spraying, restriction of grading to low-wind periods, and a 15 mph construction speed limit. Fire safety standards require automatic sprinklers for new residential construction and fire access roads meeting California Fire Code Section 503.2. Additionally, the applicant must coordinate with Underground Service Alert before excavation and adhere to specific noise restrictions to protect nearby residential dwellings. Discovery of archaeological resources or human remains requires an immediate halt to work and notification of the appropriate authorities.
Land Subdivision

POSTED

3 months ago

DEADLINE

N/A
View Details
NAICS: 221117
SLED
Euismod Energy Storage Project by Euismod Project LLC and Euismod Project I, LLC.
Solicitation # PP26401
The Euismod Energy Storage Project, managed by Euismod Project LLC and Euismod Project I, LLC under solicitation PLN25-00046, involves the development of a battery energy storage system (BESS) facility in southeastern Kern County, California. The project will utilize lithium-ion batteries to store approximately 1,150 megawatts (MW) or 9,200 megawatt-hours (MWh) of electricity from the regional grid on a 120-acre site. Infrastructure includes battery energy storage arrays, collector substations, SCADA systems, microwave communications towers, O&M buildings, and SCE tie-line and substation infrastructure. The project requires several land-use entitlements from the Kern County Planning and Natural Resources Department, including a Zone Change Case, Conditional Use Permits, Zone Variance, and Nonsummary Street Vacations. The project is subject to rigorous environmental and safety standards, including compliance with the California Environmental Quality Act (CEQA), OSHA standards, and NFPA 70E for electrical work. Key operational requirements include the implementation of a Storm Water Pollution Prevention Plan (SWPPP) and adherence to NFPA 72 for fire alarm system testing. Construction is expected to employ approximately 150 onsite workers utilizing union labor with wages meeting or exceeding IRS prevailing wage standards. Environmental reviews have highlighted potential impacts on aesthetics, air quality, biological resources, and wildfire risks, while specific mandates are in place for the protection of tribal cultural resources and the handling of human remains according to State Health and Safety Code Section 7050.5.
Biomass Electric Power Generation

POSTED

3 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS