Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Confined Space Welding Repair of Barge 600 Spud Well

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract involves performing structural welding repairs and reinforcement on a leaking spud well located within a confined space on Barge 600. The work includes tasks such as cutting access to the affected area, installing steel reinforcements to restore structural integrity, and safely disposing of lead-based paint present on the structure. The project requires specialized skills in confined space welding and adherence to safety protocols due to the hazardous environment. The contract is designated as a Total Small Business Set-Aside under the Small Business Administration (SBA) guidelines, specifically aligned with NAICS code 238211, which pertains to structural steel and precast concrete contractors. It is issued by the Department of Defense through the W071 Endist Omaha office, with the place of performance in Omaha. This subcontract provides an opportunity for qualified small businesses to support critical maintenance and safety upgrades on military assets.

General Info

Structural welding repairs and reinforcement on leaking spud well, confined space, SBA small business set-aside.

NAICS

238211

Place of Performance

Omaha, NE, USA

Set-Aside

SBA

Documents

This scope was carved out of W9128F26QA017.

The full solicitation package (12 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Barge & Bucket Repair for the Missouri River Project Office

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Perform structural welding repairs and reinforcement on a leaking spud well within a confined space on Barge 600, including cutting access, installing steel reinforcements, and disposing of lead-based paint.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 237120
New
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total Small Business Set-Aside. The scope of work involves comprehensive repairs and upgrades to the AVGAS fueling system, including the installation of a sampling gauge hatch, a mechanical gauge, and an automatic tank gauge system. Physical improvements include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additional requirements include repairing the remote containment basin drainage, replacing asphalt and concrete pavement in multiple areas, relocating a generator with a new concrete pad, and the demolition and replacement of the POL operation building. The project will be awarded using the Lowest Price Technically Acceptable (LPTA) method, with technical evaluations focusing on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict quality control standards, including a three-phase control process and final acceptance through punch-out, pre-final, and final inspections. Required deliverables include as-built drawings, and the contractor must provide performance and payment bonds within 10 days of award. Optional CLINs are included for the remediation of petroleum-contaminated soil, lead-based paint, and asbestos-containing materials.
Oil and Gas Pipeline and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 26 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS