Construct New Public Water Supply Well at Cape Cod Space Force Station
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The U.S. Army Corps of Engineers, New England District, is seeking interest from qualified small and disadvantaged businesses, including 8(a), HUBZone, Service-Disabled Veteran-Owned, and Women-Owned firms, for the design and construction of a new public water supply well at Cape Cod Space Force Station in Bourne, Massachusetts. This Sources Sought Notice aims to assess the capability and availability of interested contractors to undertake a Design-Build project scheduled for issuance in Winter 2026, with construction starting in Spring 2027. The project, estimated between $500,000 and $1,000,000, falls under NAICS code 237110, which covers water and sewer line and related structures construction. Work will be performed within a secure active-duty military base and involves adhering to Massachusetts Department of Environmental Protection (MassDEP) regulations for groundwater supply wells. The scope includes comprehensive design services involving civil, survey, mechanical, and electrical components, drilling a well approximately 400 feet deep with a gravel pack design, installing around 200 linear feet of potable water piping, and implementing a pump control panel capable of managing multiple pumps. The contractor will also be responsible for regulatory compliance, including obtaining MassDEP’s New Source Approval and ensuring continuous safe potable water service throughout construction. Respondents must submit experience packages demonstrating relevant projects completed within the last seven years, including at least one project in Massachusetts that followed MassDEP approval processes, and show proof of bonding capability. Submissions, limited to twenty pages, are due by July 3, 2026, with inquiries directed to Ann Murphy Adley at the New England District office in Concord, MA. This notice is for market research purposes and is not a solicitation or a request for proposals.
General Info
Agency
NAICS
Place of Performance
Bourne, MA, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Action Code: Sources Sought Notice
Subject: Construct New Public Water Supply Well at Cape Cod Space Force Station (CCSFS) in Bourne, Massachusetts
Solicitation Number: PANNAD-26-P-0000 032411
NACIS Code: 237110 (Water and Sewer Line and Related Structures Construction)
Response date: 3 July 2026
Place of Performance: CCSFS, Bourne, MA
US Army Corps of Engineers, New England District
696 Virginia Road
Concord, MA 01742-2751
The U.S. Army Corps of Engineers, New England District is issuing this Sources Sought Notice (SSN) for Construction Services to execute a Design-Build contract for the Construction of a New Public Water Supply Well project located at CCSFS, Bourne, MA. This announcement is to determine interest, availability and capability of 8(a), HUBZone, Service-Disabled Veteran-Owned, Women-Owned and Small Business concerns for this project. The NAICS code for this procurement is 237110 with a size standard of $45M. The project is planned to be issued in the Winter of 2026 with construction to begin in the Spring of 2027. The estimated construction cost is between $500,000 - $1,000,000.
The project will be constructed within the extents of CCSFS with most work taking place in an access controlled secure area. CCSFS is an active-duty military installation located in the northwest corner of Joint Base Cape Cod, on Flatrock Hill in Bourne, Massachusetts. The objective of this project is to enhance water security and resiliency at CCSFS by constructing a new water supply well to serve as the primary source for all occupants. There are currently two (2) water supply wells at the installation drilled in overburden near the base of a glacial deposit. The scope includes all work required to turn over a fully functional and Massachusetts Department of Environmental Protection (MassDEP) compliant water supply well to the Government. The project will require the Contractor to be the Designer of Record and complete all compliance tasks in accordance with MassDEP’s New Source Approval Process, MassDEP Drinking Water Regulations 310 CMR 22.00, and MassDEP policies for developing, testing, and design, as applicable, for new public groundwater supply drinking wells. Work for this project will likely include, but not limited to, the following:
- Design services to construct a new water supply well including all civil, survey, site, mechanical, and electrical details for integration into the existing water supply infrastructure.
- Facilitate and coordinate all regulatory compliance actions for MassDEP approval of the new water supply well in accordance with the MassDEP New Source Approval Process as described in the MassDEP Guidelines and Policies for Public Water Systems (as amended).
- Mobilize appropriate equipment and conduct drilling operations to develop a new well that meets project criteria such as a 400-foot depth with a gravel or filter pack design.
- Excavate and install 200 linear feet of new potable water piping from the well head to the existing treatment building and integrate piping with existing distribution headers.
- Install and program a new pump control panel capable of independently controlling and sequencing multiple water supply pumps.
- During construction all facilities will remain occupied, and the Contractor must maintain continuous, safe potable water service to the installation for the duration of the project using the existing drinking water wells.
Interested firms should submit a capabilities package to include the following: business classification (i.e. HUBZone, small business, etc.), as well as qualifications and experience in performing the work components stated above. Please include up to three (3) specific examples of the firm’s experience performing the work requirements stated above, with at least one (1) example of the firm’s experience in Massachusetts following the MassDEP New Source Approval Process such as drilling new public supply gravel-packed wells in deep overburden, prolonged pumping tests, and design and construction of active new groundwater supply water wells that required water treatment (i.e., Secondary Contaminants, organics, etc.). The projects must have been completed within the last seven (7) years. Please indicate the team subcontractor(s) (if any), including their prior experience and qualifications, specifically in Massachusetts, which will be used to support the offeror’s effort, and their experience must also have been performed within the last seven (7) years. Proof of bonding capability is required. Responses are limited to twenty (20) pages. Responses are due by July 3, 2026. Responses should be emailed to:
Ann Murphy Adley – ann.m.adley@usace.army.mil
Phone Contact: (978) 318-8255
Interested firms shall provide the above documentation in one original form and one copy. The Government will not pay for any material provided in response to this market survey nor return the data provided. This notice is for information purposes only and is not a request to be placed on a solicitation mailing list nor is it a Request for Proposal (RFP) or an announcement of a solicitation. The results of this survey will be considered to be in effect for a period of one year from the date of this notice.
Government Agency URL: www.nae.usace.army.mil