Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Construction Administration Support (RFI & Submittal Review)

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Construction Administration Support focuses on managing the technical information flow for prime contractors working on street improvement projects for the City of Los Angeles Bureau of Engineering. The scope of work includes processing Requests for Information, reviewing shop drawings and submittals for plan compliance, and documenting construction meetings. The contractor is responsible for ensuring all work adheres to the LA City Complete Streets Design Guide, Supplemental Street Design Guide, and standards set by Metro and Caltrans. The project deliverables include responded RFIs, approved submittals, and permit compliance logs. Based on the provided data, the contract is categorized under NAICS code 541330 and is associated with the Engineering Bureau of Public Works in Los Angeles, California. There is no specified set-aside status for this opportunity.

General Info

Subcontract for construction administration support for Los Angeles street improvement projects.

Place of Performance

Los Angeles, CA, USA

Set-Aside

NONE

Documents

This scope was carved out of TOS No. 47.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

TOS No. 47 - DSDC Support Services for the San Fernando Road Widening at Balboa Road Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 3 documents on the prime contractFrom TOS No. 47 - DSDC Support Services for the San Fernando Road Widening at Balboa Road Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering Bureau, Public Works
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Manages technical information flow for prime contractors on City of Los Angeles Bureau of Engineering street improvement projects. Processes RFIs, reviews submittals and shop drawings for plan compliance, and documents construction meetings. Ensures compliance with LA City Complete Streets Design Guide, Supplemental Street Design Guide, Metro, and Caltrans standards. Delivers approved submittals, responded RFIs, and permit compliance logs.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
International
Buckinghamshire Highways Professional Services Open Framework - Framework 2 of the 3 Complementary Highways Frameworks
Solicitation # BC/0002081
The Buckinghamshire Highways Professional Services Open Framework is a procurement by Buckinghamshire Council to establish a collective of high-performing contractors and consultants dedicated to maintaining a safe, resilient, and carbon-neutral highway network. Conducted under Section 49 of the Procurement Act 2023, this open framework scheme has a maximum total duration of eight years. The scope is divided into three discrete lots: Lot A for Commercial, Project and Procurement Support (estimated £525,000); Lot B for Scheme Design and Technical Support (estimated £2,237,500); and Lot C for Flood Schemes (estimated £520,000). The total estimated value of the framework is £3,282,500 excluding VAT. The Council intends to appoint a maximum of four suppliers per lot. The award process is conducted in two stages, beginning with a Pre-Qualification Questionnaire (PSQ) to assess legal capacity and technical ability, followed by an Invitation to Tender (ITT) for shortlisted suppliers. The final selection is based on the most advantageous tender, evaluated through a weighted scoring system consisting of 50% price and 50% quality. Quality assessments focus on technical capability, service delivery, the NEC4 Delivery Model, innovation, social value, and environmental impact. Successful bidders must maintain specific insurance levels, including £20m for Employer’s and Public Liability and £5m for Professional Indemnity. Performance is monitored via five core Key Performance Indicators (KPIs) and additional call-off specific metrics. There is no set-aside status for this procurement.
Buckinghamshire Council

POSTED

about 15 hours ago

DEADLINE

N/A
View Details

More opportunities from California → Engineering Bureau, Public Works

Same awarding agency

NAICS: 541330
SLED
TOS No. 105 - Baldwin Vista Green Streets Project
Solicitation # 105
Task Order Solicitation No. 105 is for the Baldwin Vista Green Streets Project, managed by the City of Los Angeles Bureau of Engineering and LA Sanitation and Environment. The project focuses on stormwater capture and infiltration within the Baldwin Vista community, specifically along Coliseum Street between Hauser Boulevard and Nicolet Avenue. The scope of work includes engineering services for pre-design, design, bid and award, and construction support to install approximately 23 double drywell units, one single drywell unit, 450 square feet of bioswales with native landscaping, 40 new street trees, and seven educational displays. The project is funded through the Safe Clean Water Program, with total estimated costs ranging from 9.3 million dollars for construction to approximately 10.9 million dollars when including planning, design, operations, maintenance, and three years of post-construction monitoring. The contract utilizes a hybrid compensation structure, with pre-design and design phases paid on a lump-sum basis and bid, award, and construction support services reimbursed at hourly-salary rates. Proposals are evaluated based on project understanding and technical approach (30 percent), team qualifications (20 percent), value and resource allocation (20 percent), knowledge of City standards (20 percent), and project delivery performance (10 percent). Key requirements include adherence to ADA accessibility, California prevailing wage laws, and a Minority Business Enterprise participation goal of 18 percent. Deliverables follow a phased review process with required approvals at 30, 50, 90, and 100 percent design stages. The solicitation closing date is January 5, 2027, with the task order expected to be issued by April 15, 2027.
Engineering Services

POSTED

13 days ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS