Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Florida was posted on February 28, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction Management Support – Long-Lead Procurement Specialist

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423730
New
SLED
IFB 27-08 Heat Pump and HVAC Training Equipment and Supplies, Amatrol Proprietary
Solicitation # BD-27-1373-1373C-1373L-135253
Cape Cod Community College is soliciting bids for the furnishing, delivery, installation, and instructor training of proprietary Amatrol Heat Pump and HVAC training equipment and supplies. The scope includes several specific Amatrol systems, such as Basic Refrigeration, Digital Gauge Manifold, Refrigerant Recovery and Charging, Residential Heat Pump Troubleshooting, Residential Mini-Split Heat Pump, Combined Refrigeration Installation, HVAC Controls, and Portable AC/DC Electrical learning systems. All equipment must include integrated student and instructor curricula, and the HVAC Controls system must feature specific safety components including sheathed leads, lockout/tagout, and component guards. The contract will be awarded to the responsive and responsible bidder offering the lowest total price for all requested products. To be considered responsive, bidders must provide pricing for every line item and submit all required forms, including the Bidder Information Form, Tax Compliance Certificate, Certificate of Non-Collusion, Debarment and Suspension Certification, and the Price Proposal Form. Bids must be sealed and delivered to the West Barnstable campus by November 24, 2026, at 4pm EST; electronic submissions via fax or email are not permitted. All deliverables must be delivered FOB Destination to the college's West Barnstable campus on or before April 16, 2027. Due to the lack of a loading dock, the delivery carrier is required to use a commercial truck with a motorized lift-gate. Invoices must be sent to the Accounts Payable Department with itemized lists of reimbursement charges. The contract is subject to Commonwealth Terms and Conditions, which supersede vendor terms, and may be canceled at any time based on funding availability or performance.
Cape Cod Community College

POSTED

about 19 hours ago

DEADLINE

in 14 days
NAICS: 423730
New
SLED
HVAC and Refrigeration Parts
Solicitation # 2026-RFB-0109
The Sacramento County Facilities Division is seeking competitive bids under solicitation 2026-RFB-0109 for the procurement of new and unused HVAC and refrigeration parts and components. These materials, which include HVAC equipment, compressors, coils, valves, refrigerants, motors, electrical components, belts, bearings, chemicals, and filters, will be purchased on an as-needed basis to maintain County facilities. This is a cooperative purchasing agreement through the Sacramento County Procurement Alliance, and the County may make multiple awards to ensure the best pricing, product availability, and delivery timelines. Bidders must submit pricing as a percentage discount from catalog models for eight specified product categories. The contract will be awarded to the lowest responsive and responsible bidder, with a preference given to Sacramento County products and local bidders. A 2 percent price preference is available for State Certified Micro-Business enterprises located within the Sacramento Regional Market Area. All responses must be submitted electronically via the SacCountyE bids portal by the deadline of November 20, 2026. Payment will be processed through a Virtual Card Program in partnership with U.S. Bank following the inspection and acceptance of goods. Contractors are required to abide by all manufacturer warranties and comply with all applicable federal, state, and local regulations. All employees of the awarded contractor must be covered by standard insurance, including Worker's Compensation and State Disability Insurance.
DGS: CAPSD - Procurement

POSTED

4 days ago

DEADLINE

in 10 days
NAICS: 423730
New
SLED
PACKAGED TERMINAL AIR CONDITIONERS DUE: 2PM OPENS: 3PM
Solicitation # 50011-ULLAF27009
The University of Louisiana at Lafayette is soliciting bids for the furnishing and delivery of up to 30 Packaged Terminal Air Conditioner (PTAC) through-the-wall cooling units. The basis of design is the First Co. ECO-Series Cool-Pak ECE18205A00A000F or an equivalent model that meets mandatory specifications, including a minimum 18,000 BTUH nominal cooling class, 208/240 V single phase electrical requirements, and compatibility with a 44 inch by 21-5/8 inch standard sleeve rough-in. All products must be new, of the current manufacturer model, and of the best quality, as remanufactured or used products will not be accepted. The contract will be awarded to the lowest responsible and responsive bidder, with a total initial performance period not to exceed twelve months. Bids must be submitted electronically by November 19, 2026, at 2:00 PM CST, and must include a signed bid form with net pricing on an F.O.B. UL Lafayette Destination basis. Required documentation includes manufacturer specifications, a certificate of insurance, and a standard warranty typically consisting of one year for parts and labor and two to six years for the sealed system and compressor. The successful vendor must maintain commercial general liability insurance with a minimum of $1,000,000 per occurrence and comply with Louisiana Workers’ Compensation Law. Payment terms are Net 60 days after delivery and acceptance, and the university is exempt from all Louisiana state and local sales and use taxes.
University of Louisiana at Lafayette

POSTED

6 days ago

DEADLINE

in 9 days
NAICS: 423730
International
Автоматична станція для заправки кондиціонерів Konfort 720 TOUCH або еквівалент, код ДК 021:2015: 42510000-4 — Теплообмінники, кондиціонери повітря, холодильне обладнання та фільтрувальні пристрої
Solicitation # UA-2026-11-03-013780-a
This procurement process, managed by the Ternopil Professional College of the Ternopil National Technical University named after Ivan Puluj, involves the acquisition of an automatic air conditioner charging station, specifically the Konfort 720 TOUCH or an equivalent model. The purchase is part of a public investment project aimed at modernizing workshops and laboratories in professional and pre-higher education institutions to improve energy efficiency, safety, and inclusivity. The selection process is based solely on the price criterion, which carries a weight of 100 percent. Tender proposals must be submitted in Ukrainian, although documents in other languages are permitted provided they include a certified translation. The deadline for responses is November 18, 2026, and the procurement is conducted under the legal framework of Ukraine.
Відокремлений структурний підрозділ «Тернопільський фаховий коледж Тернопільського національного технічного університету імені Івана Пулюя»

POSTED

7 days ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The Construction Management Support – Long-Lead Procurement Specialist subcontract is issued by Hernando County Fire Emergency Services in Florida. The primary objective of this contract is to provide specialized oversight for the identification, tracking, and coordination of long-lead procurement items. Key deliverables include managing the acquisition of critical assets such as specialized HVAC systems, custom doors, and emergency vehicles to ensure project timelines are maintained. The opportunity was posted on February 28, 2024, with a response deadline of April 1, 2024. It is categorized under NAICS code 423730, focusing on the procurement and logistical coordination necessary to support large-scale construction management efforts for emergency services infrastructure.

General Info

Agency

Florida → Hernando County Fire Emergency Services

Place of Performance

FL, USA

Set-Aside

NONE

Documents

This scope was carved out of 23-RFQ00466/AP.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFQ for Construction Manager/General Contractor for Hernando County Fire Station Prototypes

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Hernando County Fire Emergency Services
ContactsNo contacts available
OfficeN/A
Organization / Agency
Florida → Hernando County Fire Emergency Services
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Identification, tracking, and coordination of long-lead items such as specialized HVAC, custom doors, and emergency vehicles.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS