This Solicitation opportunity from Georgia was posted on June 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Construction Manager 26-001
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The White County Board of Education is soliciting proposals for Construction Professional services to manage renovations and new construction across three school facilities in Cleveland, Georgia, under a Construction Manager at Risk delivery method. The scope includes major upgrades at White County High School such as front entrance reconfiguration, guard shack construction, fencing, tennis court installation, and track resurfacing, with a project timeline from September 28, 2026, to January 30, 2027. Simultaneously, Jack P. Nix Elementary will undergo extensive renovations including fencing, road surfacing, playground enhancements, restroom modernization with ADA compliance, relighting, energy conservation upgrades, fire alarm and intercom system replacements, new flooring, millwork, and gym expansion, scheduled from May 3, 2027, to July 30, 2027. Mt. Yonah Elementary will receive a front entrance reconfiguration with added parking and interior painting, following the same schedule. The total project budget is capped at $15.3 million, with services delivered under an Actual Cost plus Fee structure not exceeding a Guaranteed Maximum Price. Proposals must demonstrate strong project team qualifications, firm stability, relevant experience, and a robust management plan covering cost, schedule, quality assurance, safety, and subcontractor oversight. Proposers must meet stringent qualification thresholds including valid Georgia contractor licensing, current business registration, financial health with a minimum current ratio of 1.0, EMR of 1.2 or lower, and bonding capacity sufficient for the project scope. Insurance requirements mandate $1 million per accident for bodily injury, $2 million for property damage, and a $10 million aggregate limit. Compliance with the Georgia Security and Immigration Compliance Act and federal IRCA is mandatory, requiring E-Verify registration or an affirmed affidavit. The Owner prohibits joint ventures and requires a single prime contractor with subcontractors managed under strict compliance protocols. Proposals are limited to forty double-sided pages with 11-point font, submitted in five printed copies and one PDF on a flash drive to the specified address by July 22, 2026, at 10:00 AM EST. Evaluation prioritizes team experience and qualifications (25%), firm suitability (25%), prior public sector project performance (20%), financial stability (15%), and quality of the management plan (15%), with award based on a trade-off analysis rather than lowest price. Compliance with Davis-Bacon prevailing wage standards and
General Info
Agency
NAICS
Place of Performance
GA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Front entrance reconfiguration to White County High School, including guard shack, front of campus fencing, tennis court construction, and track resurfacing. Project Schedule: September 28, 2026 to January 30, 2027
Renovations and Modifications to Jack P. Nix Elementary School, Including fencing, ABC Drive surfacing, technology, playground, relighting, restroom modernization (including those for handicapped, tackboards, markerboards, provisions for the handicapped to include drinking fountains, lifts, and ramps, refinish wall surfaces to include painting, door replacement, energy conservation to include time devices,caulking and retrofit measures, fire alarm & intercom, new floor covering, millwork/cabinetry/casework & gym expansion. Project Schedule: May 3, 2027, to July 30, 2027
Front entrance reconfiguration to Mt. Yonah Elementary School, including additional parking area, & interior painting. Project Schedule: May 3, 2027, to July 30, 2027
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
