This Solicitation opportunity from Florida was posted on October 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Greater Orlando Aviation Authority is seeking a national leader to serve as the Construction Manager at Risk (CMAR) for the Airside 2 Wing Expansion Program at Orlando International Airport. This comprehensive project involves the construction of Airside 2 Wing 8, which will add up to nine Narrowbody Equivalent Gates, along with necessary airfield and apron improvements and the integration of complex building systems, including MEP, fire protection, and IT/low-voltage systems. The program emphasizes the use of modular, prefabricated, and off-site construction strategies to accelerate the delivery timeline and minimize operational disruptions to passengers and airlines. The total program budget is estimated at 681.9 million dollars.
The selected CMAR will provide design collaboration, design assist, preconstruction, and construction services, culminating in a Guaranteed Maximum Price (GMP) structure. Key requirements include maintaining a full-time on-site Program Manager, collocating the CMAR team on Aviation Authority property, and adhering to a combined Local Developing Business and Veteran Business Enterprise participation goal of 11 percent. Evaluation of respondents is based on a point system focusing on experience, staffing, and compliance, with a minimum score of 50 points required to avoid disqualification. The contract also mandates strict adherence to Florida Statutes, including certifications regarding the boycott of Israel and the non-use of public funds for certain diversity, equity, and inclusion materials.
General Info
CMAR for Orlando Airport Airside 2 expansion, budget 681.9 million, adding nine gates.
HighAI Summary for 27-109-RFSQ Addendum No. 4 - Airside 2 Wing Expansion Program: Addendum No. 4 dated October 29, 2026, for solicitation 27-109-RFSQ regarding the Construction Manager at Risk (CMAR) for the Airside 2 Wing Expansion Program. This document provides formal responses to vendor questions (18-43), clarifying the total capital program budget as $681,900,000, confirming that updated LDB/SBP policies do not change participation goals, and providing guidance on PDF upload options for Joint Venture disclosure logs.
PDF
PDF, High priority: read this first80 pages · rfsq
HighAI Summary for 27-109-RFSQ: CMAR Entity for Airside 2 Wing Expansion Program (BP-00517): The Greater Orlando Aviation Authority is seeking a Construction Manager at Risk (CMAR) entity for the Airside 2 Wing Expansion Program at Orlando International Airport (MCO). The project involves the construction of Airside 2 Wing 8, adding up to nine Narrowbody Equivalent Gates (NBEGs), airfield/apron improvements, and the integration of building systems. The solicitation emphasizes a preference for expertise in modular, prefabricated, and off-site construction strategies to accelerate delivery and minimize operational impacts.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for 27-109-RFSQ: Construction Manager at Risk (CMAR) Entity for Airside 2 Wing Expansion Program: Request for Statement of Qualifications (RFSQ) issued by the Greater Orlando Aviation Authority (GOAA) to select a Construction Manager at Risk (CMAR) for the Airside 2 Wing Expansion Program (BP-00517). The project involves the construction of Airside 2 Wing 8, adding up to nine Narrowbody Equivalent Gates (NBEGs), airfield/apron improvements, and integrated building systems. The solicitation emphasizes a preference for expertise in modular, prefabricated, and off-site construction strategies to accelerate delivery at Orlando International Airport (MCO).
PDF
PDF, High priority: read this first87 pages · contract-document
HighAI Summary for Airside 2 Wing Expansion Program - CMAR Agreement: This is a sample Construction Manager at Risk (CMAR) agreement between the Greater Orlando Aviation Authority and a CMAR entity for the Airside 2 Wing Expansion Program (BP-00517). The document outlines the roles, responsibilities, and legal terms governing pre-construction and construction phase services, including Guaranteed Maximum Price (GMP) protocols, payment terms, and dispute resolution.
PDF
PDF, High priority: read this firstrfsq
HighAI Summary for Airside 2 Wing Expansion Program CMAR RFSQ (BP-00517): The Greater Orlando Aviation Authority (GOAA) issued this Request for Qualifications (RFSQ) to select a Construction Manager at Risk (CMAR) entity for the Airside 2 Wing Expansion Program (BP-00517). The project involves the construction of Airside 2 Wing 8, adding up to nine Narrowbody Equivalent Gates (NBEGs), and associated airfield, apron, and building system improvements. The authority is seeking a national leader with expertise in modular and prefabricated construction to deliver the program while maintaining operational continuity. The solicitation was released on September 28, 2026, with a non-mandatory pre-submittal meeting scheduled for October 9, 2026.
PDF
PDF, High priority: read this firstrfsq
HighAI Summary for Construction Manager at Risk (CMAR) Entity for the Airside 2 Wing Expansion Program (BP-00517): The Greater Orlando Aviation Authority (GOAA) is soliciting a Construction Manager at Risk (CMAR) Entity for the Airside 2 Wing Expansion Program at Orlando International Airport (MCO). The project involves the construction of Airside 2 Wing 8, adding up to nine Narrowbody Equivalent Gates (NBEGs), airfield/apron improvements, and integrated building systems. The solicitation emphasizes modular and prefabricated construction strategies to accelerate delivery. The document includes a tentative timeline with a release date of September 28, 2026, and a non-mandatory pre-submittal meeting on October 9, 2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Orlando International Airport Airside 2 Wing Program Definition Document: Final Program Definition Document (PDD) dated June 2024/2026 for the Orlando International Airport Airside 2 Wing project. Prepared by RICONDO and associates for the Greater Orlando Aviation Authority, the document outlines technical requirements, facility programs, airfield geometry, aircraft gate layouts, and indicative concepts for the Airside 2 Wing, Hardstand areas, and Modular Construction Yard. It includes detailed sections on operational continuity, phasing, and implementation elements.
PDF
PDF, High priority: read this first79 pages · rfp
HighAI Summary for RFSQ 27-109: Construction Manager at Risk (CMAR) for Airside 2 Wing Expansion Program: The Greater Orlando Aviation Authority is seeking a Construction Manager at Risk (CMAR) entity for the Airside 2 Wing Expansion Program (BP-00517) at Orlando International Airport (MCO). The project involves the design and construction of Airside 2 Wing 8, adding up to nine Narrowbody Equivalent Gates (NBEGs), apron and airfield improvements, and integrated building systems. The solicitation emphasizes a preference for expertise in modular, prefabricated, and off-site construction strategies to accelerate delivery and minimize operational impacts.
PDF
PDF, High priority: read this first2 pages · amendment
HighAI Summary for Solicitation 27-109-RFSQ Addendum No. 1 - Airside 2 Wing Expansion Program: Addendum No. 1 dated October 12, 2026, for Solicitation 27-109-RFSQ regarding the Construction Manager at Risk (CMAR) Entity for the Airside 2 Wing Expansion Program (BP-00517). This document replaces the Conflict of Interest Form in Vendor Questionnaire 2.9 and provides formal responses to four vendor questions concerning Joint Venture experience requirements, recency of program experience, delivery method qualifications, and local office presence requirements.
PDF
PDF, High priority: read this first9 pages · amendment
HighAI Summary for Solicitation 27-109-RFSQ Addendum No. 2 - Airside 2 Wing Expansion Program: Addendum No. 2 dated October 23, 2026, for the Construction Manager at Risk (CMAR) Entity for the Airside 2 Wing Expansion Program (BP-00517). This document provides clarification on Local Developing Business (LDB) certification eligibility and revises Section 7.1 regarding the 11% Combined LDB/VBE participation goal. It also deletes Section 4.4, Section 7.2, and Vendor Questionnaire 2.8, while revising the Vendor Questionnaire regarding small business compliance.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Solicitation 27-109-RFSQ Addendum No. 3 - CMAR Airside 2 Wing Expansion: Addendum No. 3 dated October 28, 2026, for Solicitation 27-109-RFSQ regarding the Construction Manager at Risk (CMAR) for the Airside 2 Wing Expansion Program. This amendment updates the solicitation to include a mandatory Vendor Questionnaire certification regarding the use of public funds for diversity, equity, and inclusion (DEI) materials, ensuring compliance with Section 287.139 of the Florida Statutes effective January 1, 2027.
PDF
PDF, High priority: read this first42 pages · industry-day
HighAI Summary for Solicitation 27-109-RFSQ Pre-Submittal Presentation - Airside 2 Wing Expansion Program: Pre-submittal meeting presentation dated October 9, 2026, for the Greater Orlando Aviation Authority's solicitation #27-109-RFSQ. The document outlines the procurement process for a Construction Manager at Risk (CMAR) for the Airside 2 Wing Expansion Program, including a tentative schedule with a submission deadline of November 9, 2026, electronic submission requirements via OpenGov, minimum pass/fail requirements (experience, references, licensure, and small business goals), and evaluation criteria.
PDF
PDF, Low priority20 pages · policy-manual
LowAI Summary for Greater Orlando Aviation Authority Local Developing Business Program Policy: This document outlines the policy for the Local Developing Business (LDB) Program administered by the Greater Orlando Aviation Authority. It establishes guidelines for increasing opportunities for qualified local businesses in construction, professional services, and non-concession goods and services at Orlando International and Executive Airports. The policy covers certification eligibility, participation goals, good faith efforts, and the role of the Business Opportunity & Exchange Liaison Officer.
PDF
PDF, Low priority3 pages · industry-day
LowAI Summary for Pre-Submittal 27-109-RFSQ Attendance Report - Airside 2 Wing Expansion: Attendance report for a virtual pre-submittal meeting on October 9, 2026, regarding RFSQ 27-109 for a Construction Manager at Risk (CMAR) entity for the Airside 2 Wing Expansion project. The document lists attendees from the Greater Orlando Aviation Authority (GOAA) and various external contracting firms.
PDF
PDF, Low priorityindustry-day
LowAI Summary for Pre-Submittal Meeting Sign-in Sheet - Airside 2 Wing Expansion Program (BP-00517): Attendance sign-in sheets for pre-submittal meetings regarding the Construction Manager at Risk (CMAR) Entity for the Airside 2 Wing Expansion Program (BP-00517/EP-00517). The documents record attendee names, contact information, and MWBE/DBE status for meetings held on September 30 and October 9, 2020/2026.
PDF
PDF, Low priorityother
LowAI Summary for Site Visit Meeting Sign-In Sheet - Solicitation 27-109-RESQ: Attendance records and sign-in sheets for site visits related to Solicitation 27-109-RESQ, 'Construction Manager at Risk (CMAR) Entity for the Airside 2 Wing Expansion Program (BP-0517)' for the Orlando Aviation Authority.
The Aviation Authority intends to select a Construction Manager at Risk (CMAR) Entity to provide comprehensive design collaboration, design assist, preconstruction, and construction services for construction of the Airside 2 Wing Expansion Program. The Aviation Authority is seeking a national leader with extensive experience and proficiency as a CMAR for comparable aviation capital programs to deliver the Airside 2 Wing Expansion Program, within the approved schedules and budgets, at the quality expected of a world-class airport facility. Preferred CMAR technical expertise shall include modular, prefabricated, and off-site construction strategies. Official Notice #1: 27-109-RFSQ-Construction Manager at Risk (CMAR) Entity for the Airside 2 Wing Expansion Program (BP-00517): The purpose of this notice is to share the 27-109-RFSQ-Construction Manager at Risk (CMAR) Entity for the Airside 2 Wing Expansion Program Pre-Submittal Meeting & Attendance Attachments: 27-109-RFSQ_-_Pre-Submittal_Presentation_Final.pdf, Pre-Submittal_Sign-in_10.9.26_(In-Person).pdf, Site_Visit_Sign-in.pdf, Pre-Submittal_27-109-RFSQ,_-_Attendance_report_10-09-26_(Virtual).pdf Addendum #1: Addendum for 27-109-RFSQ-Construction Manager at Risk (CMAR) Entity for the Airside 2 Wing Expansion Program (BP-00517) Attachments: 27-109-RFSQ_-_Addendum_No._1.Final.pdf Addendum #2: Addendum for 27-109-RFSQ-Construction Manager at Risk (CMAR) Entity for the Airside 2 Wing Expansion Program (BP-00517) Attachments: 27-109-RFSQ_-_Addendum_No._2.pdf Addendum #3: Addendum for 27-109-RFSQ-Construction Manager at Risk (CMAR) Entity for the Airside 2 Wing Expansion Program (BP-00517) Attachments: 27-109-RFSQ_-_Addendum_No._3.pdf Addendum #4: Addendum for 27-109-RFSQ-Construction Manager at Risk (CMAR) Entity for the Airside 2 Wing Expansion Program (BP-00517) Attachments: 27-109-RFSQ_-_Addendum_No._4.pdf
More opportunities from Florida → Planning, Engineering and Construction