Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on May 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction Manager at Risk (CMAR) - Public Services Complex Administration Building

Closed
39-26State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for the comprehensive interior modernization of Building 262, with potential options for Buildings 261 and 263. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces through repainting and the removal of vinyl wall coverings. Technical upgrades involve installing raised flooring, updating electrical distribution with simple dimming controls and new ceiling fans, replacing variable air volume systems, and correcting plumbing deficiencies. The contractor is also responsible for providing new signage and managing the movement and protection of all loose furniture. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using the best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience, with minimum ratings of Satisfactory and Acceptable required, respectively. The contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict quality control, safety, and ADA accessibility standards. Proposals must be submitted electronically to the Contracting Officer by November 9, 2026, and must include a detailed bid schedule in Excel and technical documentation in PDF format.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. The comprehensive scope of work includes selective demolition, building envelope repairs, new roofing with a 20-year warranty, and exterior wall system updates. Interior improvements consist of reconfiguration, new finishes, epoxy mortar flooring, and the installation of a full NFPA-compliant fire suppression system. Infrastructure upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires site improvements including paving removal and replacement, drainage upgrades, and hazardous materials abatement. The contract is divided into two primary exhibit line items: ELIN 0001 for building renovation and ELIN 0002 for paving work. Award will be based on the lowest price, and bidders must propose on all line items to avoid rejection. Performance is subject to the Davis-Bacon Act and Buy American requirements. Bonding requirements are tiered, with proposals exceeding 150,000 dollars requiring bid, payment, and performance bonds. Quality control is managed through a three-phase process requiring a government-accepted QC Plan and adherence to various ASTM and NFPA standards. Administrative requirements include monthly invoicing via Wide Area Work Flow using NAVFAC Form 7300/30 and the submission of detailed monthly work-hour and safety reports.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 26 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, categorized under NAICS code 236220, focuses on basin improvements in California, specifically within the Riverside and Los Angeles project areas. The solicitation is designated as a set-aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. The response deadline for this opportunity is November 4, 2026. A critical component of this contract is the strict adherence to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements, which are expanded from State Water Resources Control Board standards to secure project financing. To avoid being deemed non-responsive, bidders must provide proof of specific actions within their bid package, including posting solicitations in an online publication for 30 consecutive calendar days, a print newspaper posting for at least one day, and documented utilization of the Small Business Administration and Minority Business Development Agency. While outreach documentation such as call logs or emails may be submitted up to three business days after the bid closing, failure to meet the primary posting and agency utilization requirements prior to the opening date will result in disqualification.
RT CONTRACTOR CORP

POSTED

about 4 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, mechanical and electrical utilities, and an underground stormwater retention system. An additional option for the P1016 facility includes the construction of a 17,978 square foot laboratory and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected dormitory rooms, vanity areas, hallways, offices, and conference rooms across the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to Small Businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms. Award will be based on best value, with evaluation weights assigned to price (60 percent), quality (20 percent), past performance (10 percent), and schedule (10 percent). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a W9, a completed vendor questionnaire, and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act and specific Executive Orders regarding minimum wage and paid sick leave. Contractors must comply with OSHA safety regulations, NFPA-101 life safety codes, EPA regulations, and all applicable local and state building codes. Insurance requirements include automobile liability coverage of 200,000 dollars per person and 500,000 dollars per occurrence, with Adams and Associates, Inc. named as an additional insured. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 4 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The City of Clearwater is soliciting qualified firms to provide Construction Manager at Risk (CMAR) services for the development of a new Public Services Complex Administration Building, with a proposed contract start in September 2026 and an estimated construction budget of $42.6 million. The CMAR will be engaged during both preconstruction and construction phases, beginning at approximately the 30% design phase to deliver detailed cost estimating at 30%, 60%, 90%, and 100% milestones, constructability reviews, value engineering, schedule development, procurement strategy support, and ultimately negotiate a Guaranteed Maximum Price (GMP) based on finalized construction documents. Scope of work includes full-site development with parking facilities featuring future EV charging, stormwater management systems, utility infrastructure for water, sewer, reclaimed water, electrical, and communications, landscaping, and phased construction that ensures uninterrupted operations for over 200 staff during construction, with Phase I focused on the new building and temporary/permanent access, and Phase II involving demolition of at least two existing structures. The solicitation requires submission via the City’s e-Procurement Portal by June 30, 2026, at 10:00 a.m. local time, with late submissions strictly rejected. Proposals must not exceed 54 pages, excluding certain front matter and required forms, and all responses are public records under Florida Statutes Chapter 119, rendering any claims of confidentiality non-responsive. Evaluation of proposals will be based on a point system totaling 100 points, weighted as follows: 30 points for firm and team qualifications and experience, 30 points for procedures and processes, 25 points for project approach and understanding, and 15 points for public outreach, communication, and quality management. Responsiveness is a mandatory pass/fail gate; proposals must fully comply with all submission instructions, include all required attachments, and be submitted on time. Responsibility will be assessed based on past performance, references, compliance with laws, and integrity. Required documentation includes a W-9 form, notarized Scrutinized Companies form, Anti-Human Trafficking compliance form, Truth in Negotiations Certificate, and proof of Florida licensing and corporate registration. Key requirements include adherence to Florida Statutes sections 725.06 and 768.28 regarding indemnification and liability, prohibition of fuel surcharges and unauthorized price increases, monthly invoicing with 5% retainage

General Info

City of Clearwater seeks CMAR services for new Public Services Complex; submissions due June 30, 2026.

Documents

2

RFQ 39-26 Construction Manager at Risk - Public Services Complex Administration Building

PDF, High priority: read this firstrfq
High

Sample CMAR Services Agreement - City of Clearwater

PDF, High priority: read this firstcontract-document
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Public Works
Contacts1 person available
OfficeClearwater, FL, 33756, USA
Organization / AgencyFlorida → Public Works
Office AddressClearwater, FL, 33756, USA
Contacts
Lori VogelProcurement Manager

Interested Companies (41)

Reno BuildingTampa, FL
Burke Construction GroupDoral, FL
P.J. HayesSarasota, FL

See All 41 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The City of Clearwater is seeking sealed qualifications to provide CMAR services for a new Public Services Complex Administration Building.

More opportunities from Florida → Public Works

Same awarding agency

NAICS: 339950
New
SLED
2709ITB - Citywide Banner Printing & Fabrication
Solicitation # 2709ITB
The City of Daytona Beach, through its Public Works department, is soliciting bids for solicitation 2709ITB to secure a vendor for the as-needed printing, fabrication, finishing, packaging, and delivery of large-format signage. The scope includes vertical and horizontal pole banners, event and promotional banners, facility banners, and yard signs. This is a production and delivery only contract; installation and maintenance are excluded. Deliveries must be made to the Public Works facility at 950 Bellevue Ave, with specific turnaround times ranging from 5 business days for yard signs to 10 business days for most banners. The award will be based on the total cost of base bid unit costs for each line item, and bidders must provide pricing for four additional bulk quantity ranges. The contract is for an initial term of three years, with the City holding the option to renew for two additional one-year terms. Qualified bidders must have at least three years of successful operation and provide bid security equal to 10% of the bid, as well as performance security equal to 100% of the contract price upon award. All submissions must be made electronically via the OpenGov platform by November 19, 2026, at 3:00pm, as paper bids will not be accepted. Required documentation includes a pricing proposal, W-9, human trafficking affidavit, and WBE/MBE participation forms. Additionally, contractors must comply with E-Verify registration, Florida public records laws, and certifications regarding scrutinized companies that boycott Israel.
Sign Manufacturing

POSTED

about 16 hours ago

DEADLINE

in 22 days
View Details
NAICS: 541330
New
SLED
Construction, Engineering And Inspection (CEI) Services For The Sands Boulevard And Surfside Boulevard Bridge Repair Projects
Solicitation # 2026-RFP-PW-070-KR
The City of Cape Coral is soliciting proposals under solicitation 2026-RFP-PW-070-KR for a qualified engineering firm to provide Construction Engineering and Inspection (CEI) services for two federally funded bridge repair projects: Sands Boulevard and Surfside Boulevard. The selected consultant will manage construction contract administration, including monitoring structural rehabilitation at Sands Boulevard and addressing undermining, erosion, and shoreline protection at Surfside Boulevard. The project is funded through the FDOT Local Agency Program and requires strict adherence to FDOT manuals, FHWA requirements, and federal-aid compliance. The contract duration is 300 calendar days from the Notice to Proceed, and the consultant must maintain separate technical and financial records for each project. The selection process is based on qualifications, with a heavy emphasis on the experience of key personnel and the firm's ability to meet budget and time requirements. Proposals must be submitted via the OpenGov portal by November 5, 2026, and must adhere to strict administrative formatting and page limits to avoid being deemed non-responsive. Awarded firms must comply with the Davis-Bacon Act, Build America Buy America sourcing preferences, and various non-discrimination statutes, including Title VI and the ADA. Key deliverables include daily work reports and heightened oversight for critical operations such as sheet-pile installation and underwater material placement. Payment is contingent upon annual legislative appropriations, with specific requirements for quarterly invoicing and final submission within 120 days of project completion.
Engineering Services

POSTED

about 16 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237110
New
SLED
Wastewater Collections Point Repair and Improvements
Solicitation # 26-0060-UT
Solicitation 26-0060-UT is an invitation for bids from the City of Clearwater, Florida, for Wastewater Collections Point Repair and Improvements. This is a unit price contract where work is performed on an as-needed basis through individual work orders at various locations within the city's jurisdiction. The scope is divided into six groups: Group A for sanitary sewer trenchless reconstruction, Group B for sewer cleaning and televising inspection, Group C for wastewater point repair, Group D for sanitary cleanouts and laterals, Group E for polyurethane manhole surfacing, and Group F for smoke and dye testing. Bidders may bid on one or all groups, and the contract will be awarded to the lowest responsible and responsive bidder. The initial contract period is 365 consecutive calendar days from the Notice to Proceed, with the City reserving the right to renew for up to three additional years. Key requirements include a bid security of 10 percent of the maximum bid price and the provision of payment and performance bonds within ten days of the award. Contractors must adhere to strict safety standards, including the Florida Trench Safety Act and OSHA provisions, and ensure all materials in contact with wastewater are NSF approved. The contract also mandates a one-year warranty from substantial completion and requires contractors to maintain compliance with NPDES management measures and ADA accessibility standards for sidewalk replacements.
Water and Sewer Line and Related Structures Construction

POSTED

about 19 hours ago

DEADLINE

in 8 days
View Details
New
SLED
Lift Station No. 85 Replacement
Solicitation # IFB27-0027
The City of Orlando, through its Public Works agency, is soliciting sealed responses for the Lift Station No. 85 Replacement project, identified as IFB27-0027. The project is located at 3915 South Lake Orlando Parkway, Orlando, Florida, and involves a lump sum contract for the installation, start-up, testing, and training of several critical systems. The scope of work includes hoist systems, HVAC systems, plumbing systems, and instrumentation and control systems, as well as the delivery of comprehensive O&M manuals. All work must comply with the 2008 ADA Standards for Accessibility and specific military and IEEE standards for performance testing and electromagnetic interference suppression. Responses must be submitted electronically via OpenGov by 2:00 pm local time on December 4, 2026. The contract will be awarded to the lowest responsive and responsible bidder based on the Total Base Bid. Requirements for award include a 10 percent bid bond, payment and performance bonds, and proof of insurance within two weeks of notification of intent to award. Contractors must adhere to Davis-Bacon Act wage determinations for heavy construction in Orange County and certify compliance with Florida Statutes regarding human trafficking. Payment is processed through signed applications for payment, which require the submission of certified payrolls via the City's electronic tracking system. Wright-Pierce, Inc. serves as the Engineer of Record for the project.

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS