Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Construction Manager at Risk (CMAR) Services for the Willow Lake Water Pollution Control Facility North Primary Digesters No. 1 and No. 2 Interior and Exterior Coatings

Active
6292State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Salem, Oregon is seeking qualified Construction Manager at Risk (CMAR) services to perform interior and exterior coatings work on North Primary Digesters No. 1 and No. 2 at the Willow Lake Water Pollution Control Facility. This project involves the application of protective coatings to both the interior and exterior surfaces of the digesters to ensure structural integrity, corrosion resistance, and long-term operational efficiency. The selected CMAR will be responsible for providing comprehensive project management, preconstruction services, cost estimation, scheduling, and construction coordination under a guaranteed maximum price model, ensuring accountability and risk mitigation throughout the project lifecycle. The work must adhere to strict environmental, safety, and quality standards consistent with municipal utility infrastructure requirements. The solicitation, identified as RFP No. 267073 with solicitation number 6292, was posted on July 6, 2026, and responses are due by August 11, 2026. Proposals must be submitted through the designated platform, and all bidders are expected to demonstrate prior experience with similar industrial coating projects, particularly in wastewater treatment environments. The point of contact for inquiries is the Contracts and Procurement office, reachable via contracts@cityofsalem.net. Performance of the work will take place at the Willow Lake facility in Oregon, and contractors must be prepared to comply with all local, state, and federal regulations governing construction activities in sensitive operational utility sites.

General Info

Salem, Oregon seeks CMAR for coating digesters at Willow Lake facility under guaranteed maximum price.

Agency

Oregon → City of Salem, ORView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

OR, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOregon → City of Salem, OR
Contacts1 person available
OfficeUSA
Organization / Agency
Oregon → City of Salem, OR
View Agency Profile
Office AddressUSA
Contacts
Contracts and Procurement

Full Description

Show more
RFP No. 267073 Construction Manager at Risk (CMAR) Services for the Willow Lake Water Pollution Control Facility North Primary Digesters No. 1 and No. 2 Interior and Exterior Coatings

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 8 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 8 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
45th Ave SW Culvert Replacement and Habitat Restoration
Solicitation # 45th-ave-sw-culvert-replacement-habitat-restoration
The City of Seattle is procuring the replacement of a deteriorated culvert along 45th Avenue SW and the associated restoration of surrounding habitat in King County, Washington. This project aims to improve stormwater infrastructure while enhancing ecological conditions in the area, with work focused on sustainable, environmentally responsible construction practices. The contract is designated for Minority Business Enterprise and Woman Business Enterprise participation, requiring contractors to hold valid NMSDC and WBENC certifications, respectively, ensuring broad inclusion of underrepresented small businesses in the bid process. Bid submissions are due by August 12, 2026, and the solicitation is open to qualified firms through the SBA’s opportunity portal. Shimmick Construction Company, Inc. is the lead contracting entity overseeing the project, serving as the point of contact for inquiries, with Jamie Miranda available via email and phone for questions regarding requirements and compliance. The NAICS code 237990 classifies this as other heavy and civil engineering construction, indicating the scope involves complex earthwork, hydraulic structures, and habitat rehabilitation rather than typical road or building infrastructure. The project site is located in southwest Seattle, and while no specific address is listed, performance is confined to the 45th Avenue SW corridor. Contractors must be prepared to meet both engineering standards for culvert installation and ecological guidelines for native vegetation and streambed restoration, reflecting a dual focus on civic infrastructure and environmental stewardship.
Shimmick Construction Company, Inc

POSTED

about 12 hours ago

DEADLINE

in 8 days
View Details

More opportunities from Oregon → City of Salem, OR

Same awarding agency

NAICS: 237990
SLED
Construction Manager at Risk (CMAR) Geren Island Flow Maintenance Project
Solicitation # 6275
The City of Salem, Oregon is soliciting proposals for a Construction Manager at Risk (CMAR) engagement for the Geren Island Flow Maintenance Project, identified as RFP No. 267068. The project aims to ensure flow maintenance at Geren Island, with the selected CMAR responsible for providing preconstruction services and then assuming the role of constructor under a guaranteed maximum price structure. Proposals are due by August 18, 2026, and must be submitted through the designated electronic portal. The CMAR will be expected to collaborate closely with the city during design development, provide constructability reviews, manage subcontractors, and deliver the project within established budgets and timelines while maintaining compliance with all applicable codes and regulations. This solicitation does not include specific set-aside requirements or NAICS code designation, and the contract opportunity is open to qualified construction management firms with demonstrated expertise in CMAR delivery methods. The place of performance is located in Oregon, with all project activities centered around the Geren Island site. The primary point of contact for procurement inquiries is the City of Salem’s Contracts and Procurement department, reachable via contracts@cityofsalem.net. Interested parties should review the full solicitation details on the official bidding portal prior to submission to ensure alignment with all technical, administrative, and contractual obligations.
Other Heavy and Civil Engineering Construction

POSTED

about 1 month ago

DEADLINE

in 15 days
View Details